Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technology readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Technology Readiness Level Assessment Process as Applied to NASA Earth Science Missions

Technology assessments of fourteen science instruments were conducted within NASA using the NASA Technology Readiness Level (TRL) Metric. The instruments were part of three NASA Earth Science Decadal Survey missions in pre-formulation. The Earth Systematic Missions Program (ESMP) Systems Engineering Working Group (SEWG), composed of members of three NASA Centers, provided a newly modified electronic workbook to be completed, with instructions. Each instrument development team performed an internal assessment of its technology status, prepared an overview of its instrument, and completed the workbook with the results of its assessment. A team from the ESMP SEWG met with each instrument team and provided feedback. The instrument teams then reported through the Program Scientist for their respective missions to NASA's Earth Science Division (ESD) on technology readiness, taking the SEWG input into account. The instruments were found to have a range of TRL from 4 to 7. Lessons Learned are presented; however, due to the competition-sensitive nature of the assessments, the results for specific missions are not presented. The assessments were generally successful, and produced useful results for the agency. The SEWG team identified a number of potential improvements to the process. Particular focus was on ensuring traceability to guiding NASA documents, including the NASA Systems Engineering Handbook. The TRL Workbook has been substantially modified, and the revised workbook is described.

Systems Engineering↗

Orbit transfer rocket engine integrated control and health monitoring system technology readiness assessment

The objectives of this task were to: (1) estimate the technology readiness of an integrated control and health monitoring (ICHM) system for the Aerojet 7500 lbF Orbit Transfer Vehicle engine preliminary design assuming space based operations; and (2) estimate the remaining cost to advance this technology to a NASA defined 'readiness level 6' by 1996 wherein the technology has been demonstrated with a system validation model in a simulated environment. The work was accomplished through the conduct of four subtasks. In subtask 1 the minimally required functions for the control and monitoring system was specified. The elements required to perform these functions were specified in Subtask 2. In Subtask 3, the technology readiness level of each element was assessed. Finally, in Subtask 4, the development cost and schedule requirements were estimated for bringing each element to 'readiness level 6'.

Bickford, R. L.↗

Final Report on HOLODEC 2 Technology Readiness Level

During the period of this project, the Holographic Detector for Clouds 2 (HOLODEC 2) instrument has advanced from a laboratory-proven instrument with some initial field testing to a fully flight-tested instrument capable of providing useful cloud microphysics measurements. This can be summarized as 'Technology Readiness Level 8: Technology is proven to work - Actual technology completed and qualified through test and demonstration.' As part of this project, improvements and upgrades have been made to the optical system, the instrument power control system, the data acquisition computer, the instrument control software, the data reconstruction and analysis software, and some of the basic algorithms for estimating basic microphysical variables like droplet diameter. Near the end of the project, the instrument flew on several research flights as part of the IDEAS 2011 project, and a small sample of data from the project is included as an example. There is one caveat in the technology readiness level stated above: the upgrades to the instrument power system were made after the flight testing, so they are not fully field proven. We anticipate that there will be an opportunity to fly the instrument as part of the IDEAS project in fall 2012.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of Technology Readiness Level of a Carbon Dioxide Reduction Assembly (CRA) for use on International Space Station

When technologies are traded for incorporation into vehicle systems to support a specific mission scenario, they are often assessed in terms of Technology Readiness Level (TRL). TRL is based on three major categories of Core Technology Components, Ancillary Hardware and System Maturity, and Control and Control Integration. This paper describes the Technology Readiness Level assessment of the Carbon Dioxide Reduction Assembly (CRA) for use on the International Space Station. A team comprising of the NASA Johnson Space Center, Marshall Space Flight Center, Southwest Research Institute and Hamilton Sundstrand Space Systems International have been working on various aspects of the CRA to bring its TRL from 4/5 up to 6. This paper describes the work currently being done in the three major categories. Specific details are given on technology development of the Core Technology Components including the reactor, phase separator and CO2 compressor.

Murdoch, Karen↗

Definition, technology readiness, and development cost of the orbit transfer vehicle engine integrated control and health monitoring system elements

An Integrated Control and Health Monitoring (ICHM) system was conceived for use on a 20 Klb thrust baseline Orbit Transfer Vehicle (OTV) engine. Considered for space used, the ICHM was defined for reusability requirements for an OTV engine service free life of 20 missions, with 100 starts and a total engine operational time of 4 hours. Functions were derived by flowing down requirements from NASA guidelines, previous OTV engine or ICHM documents, and related contracts. The elements of an ICHM were identified and listed, and these elements were described in sufficient detail to allow estimation of their technology readiness levels. These elements were assessed in terms of technology readiness level, and supporting rationale for these assessments presented. The remaining cost for development of a minimal ICHM system to technology readiness level 6 was estimated. The estimates are within an accuracy range of minus/plus 20 percent. The cost estimates cover what is needed to prepare an ICHM system for use on a focussed testbed for an expander cycle engine, excluding support to the actual test firings.

Cannon, I.↗

Technology Readiness Assessment Best Practices Guide

This guide establishes standard definitions and best practices for conducting technology readiness assessments (TRAs) for in flight projects and NASA’s research and technology missions. These best practices originated from a NASA TRA Committee that met weekly in 2014. The team was co-led by the Headquarters (HQ) Office of the Chief Engineer (OCE) and the HQ Office of the Chief Technologist (OCT), and included one to two representatives from each Center.

Technology readiness level↗

Solar Sail Propulsion Technology Readiness Level Database

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 solar sail system design and development hardware demonstration activities over the past 20 months. Able Engineering Company (AEC) of Goleta, CA is leading one team and L Garde, Inc. of Tustin, CA is leading the other team. Component, subsystem and system fabrication and testing has been completed successfully. The goal of these activities is to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by 2006. These activities will culminate in the deployment and testing of 20-meter solar sail system ground demonstration hardware in the 30 meter diameter thermal-vacuum chamber at NASA Glenn Plum Brook in 2005. This paper will describe the features of a computer database system that documents the results of the solar sail development activities to-date. Illustrations of the hardware components and systems, test results, analytical models, relevant space environment definition and current TRL assessment, as stored and manipulated within the database are presented. This database could serve as a central repository for all data related to the advancement of solar sail technology sponsored by the ISPT, providing an up-to-date assessment of the TRL of this technology. Current plans are to eventually make the database available to the Solar Sail community through the Space Transportation Information Network (STIN).

Adams, Charles L.↗

NASA Technology Readiness Level Definitions

This presentation will cover the basic Technology Readiness Level (TRL) definitions used by the National Aeronautics and Space Administration (NASA) and their specific wording. We will discuss how they are used in the NASA Project Life Cycle and their effectiveness in practice. We'll also discuss the recent efforts by the International Standards Organization (ISO) to develop a broadly acceptable set of TRL definitions for the international space community and some of the issues brought to light. This information will provide input for further discussion of the use of the TRL scale in manufacturing.

Mcnamara, Karen M.↗

Making Technology Ready: Integrated Systems Health Management

This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

Malin, Jane T.↗

A review of separation processes proposed for advanced fuel cycles based on technology readiness level assessments

The results of an international review of separation processes for spent nuclear fuel (SNF) recycling in future closed fuel cycles are reported. This study was made by the Expert Group on Fuel Recycling Chemistry (EGFRC) organised by the Nuclear Energy Agency (NEA) of the Organisation for Economic Co-operation and Development (OECD). A unique feature of this study was that processes were classified according to a hierarchy of separations aimed at different elements within spent fuel (uranium; uranium-plutonium co-recovery; minor actinides; high heat generating radionuclides) and also the Head-end processes, used to prepare the SNF for chemical separation, were included. Separation processes covered both wet (hydrometallurgical) and dry (pyro-chemical) processes. A bespoke methodology suitable for assessing the technological maturities of separation processes for SNF recycling was then designed based on the well-established Technology Readiness Level (TRL) scale but adapted for spent nuclear fuel separations. The innovative feature of this was the use of a matrix approach that enabled information on both the scale of testing and materials used in testing to be combined in the evaluation of the TRL. TRLs for the Head-end, hydrometallurgical and pyrochemical processes that had been reviewed by the study have been evaluated. It is clear that, whilst more R&D is needed in most cases to raise TRLs, suitable options exist to enable the recovery of all actinide elements plus the HHRs by wet or dry processes, even up to the extraordinarily difficult isolation of americium alone. The technology readiness levels (TRL) for most processes fall in the ‘proof of principle’ range with TRLs between 4 and 6, although this is an evaluation at the system level and some gaps in the individual process steps may still exist that strictly would reduce the overall TRL. That is, flowsheets have been proposed for processes and tested with active materials under increasingly relevant conditions, through to initial hot tests with small quantities of SNF. The results of this work were shown to be comparable to a parallel European study that evaluated TRLs for minor actinide partitioning processes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A NEA review on innovative structural materials solutions, including advanced manufacturing processes for nuclear applications based on technology readiness assessment

The Nuclear Energy Agency (NEA) Expert Group on Innovative Structural Materials (EGISM) was established in 2008 under the guidance of the Nuclear Science Committee (NSC). Its objectives are to conduct joint and comparative studies to support the development, selection and characterisation of innovative structural materials that can be implemented in advanced nuclear fuel cycles, under long service lifetime and extreme conditions, such as high temperature, high dose/dose rate and corrosive chemical environments. In this context of growing interest and initiatives, the EGISM initiated at the beginning of 2018 an activity among its members to: Identify, in a non-exhaustive way, the currently existing programs on innovative materials and fabrication processes in NEA member countries and China; Establish a first cartography of the activities that are underway on these topics and identify common subjects and thematic; Propose a Technology Readiness Level scale to estimate the maturity of both innovative materials and fabrication processes; Carry out a reflection on what the enablers are to quickly climb this TRL scale, as well as the obstacles, in order to identify solutions to overcome them. This paper first gives definitions shared between the EGISM members on what are considered as advanced structural materials solutions. Next, some international initiatives for the accelerated development of high performance materials are presented both in non-nuclear and nuclear fields. Then, the methodology adopted for technology readiness assessment is explained. A non-exhaustive synthesis of the projects identified among the EGISM members on innovative structural materials and advanced manufacturing solutions such as additive manufacturing is presented. The TRL level of these projects is evaluated. A focus is also made on some of these projects to illustrate and explain the TRLs chosen as well as highlighting enablers or obstacles identified to climbing up the TRL scale.

36 MATERIALS SCIENCE↗

Technology readiness levels for the new millennium program

NASA's New Millennium Program (NMP) seeks to advance space exploration by providing an in-space validating mechanism to verify the maturity of promising advanced technologies that cannot be adequately validated with Earth-based testing alone. In meeting this objective, NMP uses NASA Technology Readiness Levels (TRL) as key indicators of technology advancement and assesses development progress against this generalized metric. By providing an opportunity for in-space validation, NMP can mature a suitable advanced technology from TRL 4 (component and/or breadboard validation in laboratory environment) to a TRL 7 (system prototype demonstrated in an Earth-based space environment). Spaceflight technology comprises a myriad of categories, types, and functions, and as each individual technology emerges, a consistent interpretation of its specific state of technological advancement relative to other technologies is problematic.

technology readiness TRL New Millennium Program NM↗

Software Technology Readiness for the Smart Grid

Abstract Budget and schedule overruns in product development due to the use of immature technologies constitute an important matter for program managers. Moreover, unexpected lack of technology maturity is also a problem for buyers. Both sides of the situation would benefit from an unbiased measure of technology maturity. This paper presents the use of a software maturity metric called Technology Readiness Level (TRL), in the milieu of the smart grid. For most of the time they have been in existence, power utilities have been protected monopolies, guaranteed a return on investment on anything they could justify adding to the rate base. Such a situation did not encourage innovation, and instead led to widespread risk-avoidance behavior in many utilities. The situation changed at the end of the last century, with a series of regulatory measures, beginning with the Public Utility Regulatory Policy Act of 1978. However, some bad experiences have actually served to strengthen the resistance to innovation by some utilities. Some aspects of the smart grid, such as the addition of computer-based control to the power system, face an uphill battle. It is our position that the addition of TRLs to the decision-making process for smart grid power-system projects, will lead to an environment of more confident adoption.

technology maturity, software technology readiness↗

Ion drive technology readiness for the 1985 Halley Comet rendezvous mission

This paper summarizes the results of an assessment performed by the Jet Propulsion Laboratory (JPL) in FY 77 of the technology readiness of ion propulsion technology to support a 1985 Halley Comet Rendezvous (HCR) mission. The assessment identifies the status of ion propulsion technology and risk of its utilization to perform the HCR mission as of July 1977 and provides projections of status and risk at the required date for an HCR project start, October 1978. These projections are based on the assumed completion of the development activities ongoing at the time of this assessment and the recommended new activities identified in this paper. The conclusions of the study indicate that a National Aeronautics and Space Administration (NASA) commitment to the performance-demanding HCR mission would involve significant risk, greater than that experienced in any post-1964 planetary mission, despite years of supporting research and advanced development funding for ion propulsion and even assuming the success of an ambitious, aggressive FY 78 pre-project advanced systems technology (AST) program proposed by JPL. Contributing principally to the identified risk are a marginal mass margin of 6.7%, driven by uncertainties in ion drive vehicle masses and an unconfirmed solar array power degradation model of 12%, and technology currently undemonstrated to meet HCR mission requirements in two of the six subsystems of the ion propulsion module: the thrust and solar array subsystems.

John L West↗

Comprehensive Technology Readiness Assessment Report for LL20-ML-AIT-NE-1-PD3TB

This document ensures that technologies relevant to LL20-ML-AIT-NE-1-PD3TB “AIT-NEO” have been demonstrated to work as intended and at the appropriate technology readiness level. This assessment is intended to offer management tools for understanding and mitigating programmatic risks associated with new technologies being developed under the AIT-NEO effort.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

ISRU Pilot Excavator (IPEx) Technology Readiness Level 5 Design Overview

This paper details the mechanical and mechatronic design of the Technology Readiness Level (TRL)-5 In-Situ Resource Utilization (ISRU) Pilot Excavator (IPEx). IPEx is a robotic excavator designed for a technology demonstration of regolith mining in the lunar south -pole region. The novel design uses pairs of counter-acting excavation tools called bucket drums, that dig at the same time in opposing directions to reduce the reaction force needed, thereby enabling mining with a small, low-mass, robotic system. IPEx builds on the prior work of the Regolith Advanced Surface Systems Operations Robot (RASSOR), which is the TRL-4 implementation of this concept. The TRL-5 IPEx subsystems that are discussed in this paper include: Regolith Delivery Subsystem (RDS), Mobility Subsystem (MS), Cameras and Dust Mitigation Subsystem (CDMS), and Thermal Control Subsystem (TCS). Each subsystem is described in detail with rationale for design selections. Dust tolerance is a key feature for IPEx and this paper details a thermal control system with an actuated radiator cover and phase change material as well as camera modules with removable electrodynamic dust shields (EDS). Additional components such as actuators, wheels, and bucket drums are discussed in detail. Due to their complexity, the avionics and software subsystems will be discussed in a separate publication.

RASSOR↗

JANNAF Guidelines for the Application of Technology Readiness Levels (TRLs) to Micro-Propulsion Systems, 2022 Edition

Spacecraft developers place considerable emphasis on stated Technology Readiness Levels (TRLs) to establish system-level maturity; however, the methodology for determining TRL is often inconsistent across various technologies. In 2019, the MicroPropulsion Panel of the JANNAF Spacecraft Propulsion Subcommittee developed a set of TRL guidelines for the micro-propulsion community. That work expanded on the general guidance provided by Department of Defense (DoD) and the National Aeronautics and Space Administration (NASA) documentation and sought to provide a consistent metric by which TRLs may be assigned to spacecraft micro-propulsion systems. Since the release of the 2019 guide, community feedback is motivating an updated edition of the guidelines to provide clarifications on critical TRL entry and exit criteria as well as to facilitate continued usage of the TRL guidelines.

Thomas Liu↗