Guidance on Including Social, Organizational and Technical Influences in Nuclear Utility and Plant Modernization Plans

The objective of this report is to provide the nuclear power industry with guidance on including socio-technical issues in plans developed for current and future modernization efforts. Socio-technical issues of concern include social, organizational and related technical aspects of modernized systems. These can be addressed using a set of systematic analysis and design methods developed to address socio-technical issues of the sort facing the nuclear power industry. The next phase of this work will involve developing and implementing a modernization plan that includes socio-technical tools and methods identified and discussed in a report by Dainoff and colleagues (2020). The plan is expected to be developed and implemented in cooperation with a nuclear utility that has expressed interest in participating. The Dainoff et al report provides the foundation for the present effort and presents a methodological tool set for analyzing socio-technical issues applicable to many modernization efforts. The tools described by Dainoff et al are based on principles of human factors engineering, safety engineering, and systems engineering and are discussed within the specific context of nuclear utility modernization and transformation efforts. It is expected that the plan and the concepts described in the current report will be developed and implemented with a nuclear utility partner. The plan developed with the nuclear utility partner will have a substantially higher level of detail than the guidance provided in this report, particularly with regard to details of plan logistics, etc.

99 GENERAL AND MISCELLANEOUS↗

Challenges and opportunities for multi-functional oxide thin films for voltage tunable radio frequency/microwave components

There has been significant progress on the fundamental science and technological applications of complex oxides and multiferroics. Among complex oxide thin films, barium strontium titanate (BST) has become the material of choice for room-temperature-based voltage-tunable dielectric thin films, due to its large dielectric tunability and low microwave loss at room temperature. BST thin film varactor technology based reconfigurable radio frequency (RF)/microwave components have been demonstrated with the potential to lower the size, weight, and power needs of a future generation of communication and radar systems. Low-power multiferroic devices have also been recently demonstrated. Strong magneto-electric coupling has also been demonstrated in different multiferroic heterostructures, which show giant voltage control of the ferromagnetic resonance frequency of more than two octaves. This manuscript reviews recent advances in the processing, and application development for the complex oxides and multiferroics, with the focus on voltage tunable RF/microwave components. The over-arching goal of this review is to provide a synopsis of the current state-of the-art of complex oxide and multiferroic thin film materials and devices, identify technical issues and technical challenges that need to be overcome for successful insertion of the technology for both military and commercial applications, and provide mitigation strategies to address these technical challenges.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

SU-E-CAMPUS-J-04: Image Guided Radiation Therapy (IGRT): Review of Technical Standards and Credentialing in Radiotherapy Clinical Trials

Purpose: To review IGRT credentialing experience and unexpected technical issues encountered in connection with advanced radiotherapy technologies as implemented in RTOG clinical trials. To update IGRT credentialing procedures with the aim of improving the quality of the process, and to increase the proportion of IGRT credentialing compliance. To develop a living disease site-specific IGRT encyclopedia. Methods: Numerous technical issues were encountered during the IGRT credentialing process. The criteria used for credentialing review were based on: image quality; anatomy included in fused data sets and shift results. Credentialing requirements have been updated according to the AAPM task group reports for IGRT to ensure that all required technical items are included in the quality review process. Implementation instructions have been updated and expanded for recent protocols. Results: Technical issues observed during the credentialing review process include, but are not limited to: poor quality images; inadequate image acquisition region; poor data quality; shifts larger than acceptable; no soft tissue surrogate. The updated IGRT credentialing process will address these issues and will also include the technical items required from AAPM: TG 104; TG 142 and TG 179 reports. An instruction manual has been developed describing a remote credentialing method for reviewers. Submission requirements are updated, including images/documents as well as facility questionnaire. The review report now includes summary of the review process and the parameters that reviewers check. We have reached consensus on the minimum IGRT technical requirement for a number of disease sites. RTOG 1311(NRG-BR002A Phase 1 Study of Stereotactic Body Radiotherapy (SBRT) for the Treatment of Multiple Metastases) is an example, here; the protocol specified the minimum requirement for each anatomical sites (with/without fiducials). Conclusion: Technical issues are identified and reported. IGRT guidelines are updated, with the corresponding credentialing requirements. An IGRT encyclopedia describing site-specific implementation issues is currently in development.

60 APPLIED LIFE SCIENCES↗

PRA In Design: Increasing Confidence in Pre-operational Assessments of Risks (Results of a Joint NASA/ NRC Workshop)

In late 2009, the National Aeronautics and Space Administration (NASA) and the U.S. Nuclear Regulatory Commission (NRC) jointly organized a workshop to discuss technical issues associated with application of risk assessments to early phases of system design. The workshop, which was coordinated by the Idaho National Laboratory, involved invited presentations from a number of PRA experts in the aerospace and nuclear fields and subsequent discussion to address the following questions: (a) What technical issues limit decision-makers’ confidence in PRA results, especially at a preoperational phase of the system life cycle? (b) What is being done to address these issues? (c) What more can be done? The workshop resulted in participant observations and suggestions on several technical issues, including the pursuit of non-traditional approaches to risk assessment and the verification and validation of risk models. The workshop participants also identified several important non-technical issues, including risk communication with decision makers, and the integration of PRA into the overall design process.

42 ENGINEERING↗

U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Climate Challenges and Nonproliferation: Addressing the Issue through Technical Cooperation

Climate change is an urgent global challenge that is already severely impacting many regions of the world. The 2015 Paris Agreement was a landmark achievement, while the 2023 UN COP 28 Climate Conference in Dubai recognized nuclear energy and its applications as a proven and sustainable means to help societies adapt to climate change and take measures to mitigate and, possibly, reverse its effects. Twenty-two countries, supported by over 120 companies, pledged to triple the share of global nuclear energy generation by 2050. The global interest in nuclear applications for peaceful uses has never been higher. The deployment of advanced reactors around the globe – focused primarily on lowering the carbon footprint and allowing for socio-economic development – must be addressed responsibly through setting priorities for its implementation. Tackling the challenges that new technologies, such as advanced reactors, bring to the nonproliferation regime is at the top of the list. The regime stands on the three pillars of the Nuclear Nonproliferation Treaty (NPT): nonproliferation, peaceful uses of nuclear energy, and disarmament. Recognizing the inherent risks of expanding applications of nuclear materials and technologies for peaceful uses, all such efforts must concurrently strengthen the nonproliferation norm enshrined in the NPT. The challenges of adapting to and mitigating climate change with the use of advanced reactors is already impacting the discussions and expectations about the future of the NPT. The dialog with non-traditional domestic, and international partners on a strategic technical cooperation approach is key to proposing and implementing scientific and technical solutions for urgent climate issues, while framing the discussion within nonproliferation requirements and commitments, and demonstrating the underlying value of the NPT in support of peaceful nuclear applications. This paper addresses adaptation to climate challenges and mitigation of them through advanced reactors and establishes nonproliferation linkages that derive from the deployment of this technology. This paper presents an assessment of the benefits of mechanisms for technical cooperation and peaceful uses of nuclear technology in the framework of Article IV of the NPT.

Prah, Christina↗

DGs for Service Restoration to Critical Loads in a Secondary Network

During a major outage in a secondary network distribution system, distributed generators (DGs) connected to the primary feeders as well as the secondary network can be used to serve critical loads. This paper proposed a resilience-oriented method to determine restoration strategies for secondary network distribution systems after a major disaster. Technical issues associated with the restoration process are analyzed, including the operation of network protectors, inrush currents caused by the energization of network transformers, synchronization of DGs to the network, and circulating currents among DGs. A look-ahead load restoration framework is proposed, incorporating technical issues associated with secondary networks, limits on DG capacity and generation resources, dynamic constraints, and operational limits. The entire outage duration is divided into a sequence of periods. Restoration strategies can be adjusted at the beginning of each period using the latest information. Numerical simulation of the modified IEEE 342-node low voltage networked test system is performed to validate the effectiveness of the proposed method.

Xu, Yin (ORCID:0000000209459024)↗

A Summary of Fault Recurrence and Strain Rates in the Vicinity of the Hanford Site

This document is one in a series of topical reports compiled by the Pacific Northwest National Laboratory to summarize technical information on selected topics important to the performance of a probabilistic seismic hazard analysis of the Hanford Site. The purpose of this report is to summarize available data and analyses relevant to fault recurrence and strain rates within the Yakima Fold Belt. Strain rates have met with contention in the expert community and may have a significant potential for impact on the seismic hazard estimate at the Hanford Site. This report identifies the alternative conceptual models relevant to this technical issue and the arguments and data that support those models. It provides a brief description of the technical issue and principal uncertainties; a general overview on the nature of the technical issue, along with alternative conceptual models, supporting arguments and information, and uncertainties; and finally, suggests some prospective approaches to reducing uncertainties about earthquake recurrence rates for the Yakima Fold Belt.

Bjornstad, Bruce N.↗

A Summary of Information on the Behavior of the Yakima Fold Belt as a Structural Entity

This document is one in a series of topical reports compiled by the Pacific Northwest National Laboratory to summarize technical information on selected topics important to the performance of a probabilistic seismic hazard analysis (PSHA) of the Hanford Site. The purpose of this report is to summarize available data and analyses relevant to the Yakima Fold Belt (YFB) that may bear on the question of whether or not the YFB behaves as a single seismotectonic province in which activity along one fold structure is representative of behavior along all other fold structures. This topic has met with a fairly high level of contention in the expert community and has the potential to result in significant impacts on an evaluation of seismic hazard at the Hanford Site. This report defines the relevant alternative conceptual models relevant to this technical issue and the arguments and data that support those models. It provides a brief description of the technical issue and principal uncertainties; a general overview on the nature of the technical issue, along with alternative conceptual models, supporting arguments and information, and uncertainties; and finally, it suggests some possible approaches for reducing uncertainties regarding this issue.

Last, George V.↗

Progress on Resuming Full Construction on the Waste Treatment and Immobilization Plant's High-Level Waste Facility - 16283

The U.S. Department of Energy (DOE) restricted certain engineering, procurement and construction work on the Waste Treatment and Immobilization Plant's (WTP) High-Level Waste (HLW) Facility in 2012 and early 2013 because of unresolved technical issues, and a need to align the nuclear safety basis with the design as the HLW Facility technical issues were resolved. The DOE Office of River Protection (ORP) needed a way to minimize the government's risk exposure, while continuing limited critical path construction work and resolving the technical and safety basis issues. ORP issued the Plan for Evaluation and Decision to Proceed for the High-Level Waste Facility in October 2013 to establish the process to evaluate the WTP contractor's progress on resolving the issues and to identify actions and deliverables needed to facilitate an ORP decision to resume production activities. This process provided for a phased resumption of HLW engineering, procurement and construction activities, with two decision points: Decision 1: Authorization to resume design/production engineering along with limited procurements and construction ramp-up. Decision 2: Full authorization to resume engineering, procurement and construction. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. The decision to proceed with production engineering in the HLW Facility was based on significant progress in resolving technical issues and improving work processes to align the HLW design and safety basis. ORP is working closely with the WTP contractor to facilitate decisions for resuming procurement of HLW Facility equipment with safety functions, and resuming full construction in the most complex process cells in the Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Removal at Fukushima Nuclear Plant - 13215

The Great East Japan Earthquake that took place on March 11, 2011 created a number of technical challenges at the Fukushima Daiichi Nuclear Plant. One of the primary challenges involved the treatment of highly contaminated radioactive wastewater. Avantech Inc. developed a unique patent pending treatment system that addressed the numerous technical issues in an efficient and safe manner. Our paper will address the development of the process from concept through detailed design, identify the lessons learned, and provide the updated results of the project. Specific design and operational parameters/benefits discussed in the paper include: - Selection of equipment to address radionuclide issues; - Unique method of solving the additional technical issues associated with Hydrogen Generation and Residual Heat; - Operational results, including chemistry, offsite discharges and waste generation. Results show that the customized process has enabled the utility to recycle the wastewater for cooling and reuse. This technology had a direct benefit to nuclear facilities worldwide. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular Hybrid Plasma Reactor for Low Cost Bulk Production of Nanomaterials

INL developed a bench scale modular hybrid plasma system for gas phase nanomaterials synthesis. The system was being optimized for WO 3 nanoparticles production and scale model projection to a 300 kW pilot system. During the course of technology development many modifications had been done to the system to resolve technical issues that had surfaced and also to improve the performance. All project tasks had been completed except 2 optimization subtasks. These 2 subtasks, a 4-hour and an 8-hour continuous powder production runs at 1 lb/hr powder feeding rate, were unable to complete due to technical issues developed with the reactor system. The 4-hour run had been attempted twice and both times the run was terminated prematurely. The modular electrode for the plasma system was significantly redesigned to address the technical issues. Fabrication of the redesigned modular electrodes and additional components had been completed at the end of the project life. However, not enough resource was available to perform tests to evaluate the performance of the new modifications. More development work would be needed to resolve these problems prior to scaling. The technology demonstrated a surprising capability of synthesizing a single phase of meta-stable δ-Al 2 O 3 from pure α-phase large Al 2 O 3 powder. The formation of δ-Al 2 O 3 was surprising because this phase is meta-stable and only formed between 973-1073 K, and δ-Al 2 O 3 is very difficult to synthesize as a single phase. Besides the specific temperature window to form this phase, this meta-stable phase may have been stabilized by nanoparticle size formed in a high temperature plasma process. This technology may possess the capability to produce unusual meta-stable nanophase materials that would be otherwise difficult to produce by conventional methods. A 300 kW INL modular hybrid plasma pilot scale model reactor had been projected using the experimental data from PPG Industries 300 kW hot wall plasma reactor. The projected size of the INL 300 kW pilot model reactor would be about 15% that of the PPG 300 kW hot wall plasma reactor. Including the safety net factor the projected INL pilot reactor size would be 25-30% of the PPG 300 kW hot wall plasma pilot reactor. Due to the modularity of the INL plasma reactor and the energy cascading effect from the upstream plasma to the downstream plasma the energy utilization is more efficient in material processing. It is envisioning that the material through put range for the INL pilot reactor would be comparable to the PPG 300 kW pilot reactor but the energy consumption would be lower. The INL hybrid plasma technology is rather close to being optimized for scaling to a pilot system. More near term development work is still needed to complete the process optimization before pilot scaling.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Processing and Device Oriented Approach to CIGS Module Reliability; SunShot Initiative, U.S. Department of Energy (DOE)

Abstract: A device level understanding of thin film module reliability has been lacking. We propose that device performance and stability issues are strongly coupled and simultaneous attention to both is necessary. Commonly discussed technical issues such as light soaking, metastability, reverse bias breakdown and junction breakdown can be understood by comparing the behaviors of cells made inAbstract: A device level understanding of thin film module reliability has been lacking. We propose that device performance and stability issues are strongly coupled and simultaneous attention to both is necessary. Commonly discussed technical issues such as light soaking, metastability, reverse bias breakdown and junction breakdown can be understood by comparing the behaviors of cells made in the laboratory and industry. It will then be possible to attribute the observed effects in terms of processing and cell design. Process connection to stability studies can help identify root causes and a path for mitigating the degradation.

14 SOLAR ENERGY↗

High-Temperature Aquifer Thermal Energy Storage (HT-ATES) Projects in Germany and the Netherlands—Review and Lessons Learned

Aquifer thermal energy storage (ATES) is a concept that can help to address heating and cooling needs through the use of the subsurface as a seasonal thermal energy storage (STES) system. Over 2800 ATES systems have been deployed with storage temperatures typically below 25 °C and only a few with higher temperatures (>40 °C), which would increase the energy density and utility of the stored thermal fluids. Until now, only a few high-temperature aquifer thermal energy storage (HT-ATES) projects have been initiated and are still in operation. These HT-ATES projects have encountered a range of technical and non-technical challenges. This study reviews ten such projects: four in Germany and six in the Netherlands. The non-technical issues include public acceptance, a lack of regulatory framework for these systems, managing overlapping uses of the subsurface, managing changes with the providers and off-takers of thermal energy, and obtaining financing to implement these projects. Common technical issues include geological factors such as incomplete characterization of the subsurface and reservoir heterogeneity; geochemical issues such as mineral scaling, corrosion, and biofouling; lower than expected thermal recovery; and issues with system design and reliability. This review highlights benefits and challenges faced by HT-ATES projects with the goal to use the lessons learned to improve the siting, design, development, and operation of such systems. Recommendations include improved initial subsurface site characterization, use of coupled process models to optimize system design and predict system performance, cascaded uses of stored thermal energy to better utilize the stored heat, monitoring networks to provide feedback on system performance, and expanded system scale to allow for continued operation even when maintenance of some system components is required. Techno-economic modeling and risk analysis could be used to optimize such HT-ATES project design and identify key factors that will affect sustained economic viability. In addition, design flexibility is important for these systems to allow for changing conditions regarding the supply and demand of thermal energy. Adopting these findings should improve the performance and reduce the risks for future HT-ATES projects worldwide.

15 - GEOTHERMAL ENERGY↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Refinement and Exploration

This report documents activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2023 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective, and secure DI&C technologies for digital upgrades/designs. A risk assessment-informed framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk informed capability to quantitatively estimate the safety margin obtained from plant modernization, especially for safety-related DI&C systems, (2) support and supplement existing risk informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of safety-related DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the LWRS-developed framework provides a means to address relevant technical issues by: (1) defining a risk informed analysis process for DI&C upgrade that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies in nuclear power plants (NPPs). Adding diversity within a system or components is the primary means to eliminate and mitigate CCFs, but diversity also increases system complexity and may not address all sources of systematic failures. Optimization of diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in safety-related DI&C systems of NPPs and supporting relevant design optimization, the proposed framework provides: (a) A best-estimate, risk informed capability to address new technical digital issues quantitatively, focusing on software CCFs in safety-related DI&C systems of NPPs; (b) A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to predict and prevent risk in the early design stage of DI&C systems; (c) Technical bases and risk informed insights to assist users address the risk informed alternatives for evaluation of CCFs in safety-related DI&C systems of NPPs; and (d) A risk informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The research and development efforts of this project in FY 2023 are focused on refining current methods on software CCF modeling and estimation and exploring additional innovative approaches to risk assessment of DI&C systems to enable a more comprehensive and complete assessment of various safety-related DI&C design architectures. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists. It should be noted that all the analyses are performed for the demonstration of the methodology, not for the evaluation of an actual digital control system. Results are obtained based on limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Market and policy barriers to deployment of energy storage

There has recently been resurgent interest in energy storage, due to a number of developments in the electricity industry. Despite this interest, very little storage, beyond some small demonstration projects, has been deployed recently. While technical issues, such as cost, device efficiency, and other technical characteristics are often listed as barriers to storage, there are a number of non-technical and policy-related issues. This paper surveys some of these main barriers and proposes some potential research and policy steps that can help address them. Furthermore, while the discussion is focused on the United States, a number of the findings and observations may be more broadly applicable.