Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Industrial Assessment Center Technical Field Manager

The work to be performed involves managing Industrial Assessment Centers through a portfolio of activities. The core activities to be performed are in the general areas of; quality assurance of IAC operations, enhancement of the student IAC experience, program development for improving assessments and implementing smart manufacturing projects, program outreach to carry assessment successes beyond the program, and program integration with other DOE/manufacturing assistance programs. The IAC Technical Field Management Organization (FMO) works in close collaboration with DOE and provides technical management for the IAC program working under policy guidelines established by DOE.

42 ENGINEERING↗

Hybrid Floating Solar Photovoltaics-Hydropower Systems: Benefits and Global Assessment of Technical Potential

Floating solar photovoltaics (FPV) is an emerging, and increasingly viable, application of photovoltaics (PV) in which systems are sited directly on waterbodies. Despite growing market interest, FPV system deployment is nascent, and potential adopters remain concerned about the technology, the benefits it offers, the advantages to pairing it in hybrid systems (such as with hydropower), and how to analyze technical potential. To support decision making, we provide a review of associated benefits of hybrid FPV-hydropower system operation and a novel, geospatial approach to assess the global technical potential of these systems employing publicly available, global datasets. We identify significant potential globally for FPV hybridized with hydropower ranging from 3.0?TW to 7.6?TW (4,251?TWh to 10,616?TWh annual generation), based on the assumptions made. We detail operational benefits that these hybrid systems may provide that could be quantified in future modeling and/or analyses of existing or planned hybrid systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessment of Technical Information Needs and Considerations for Front-End Activities for Molten Salt Fuel Types

This report details an assessment of the hazards and safety impacts related to front-end operations of molten salt reactors (MSR) as well as an assessment of existing safety guidance. Publicly available information was evaluated to make recommendations to the U.S. Nuclear Regulatory Commission (NRC) for guidance development and information gathering needs. Five different MSR technologies were evaluated along with information from 1960’s about the Atomic Energy Commission programs for the Aircraft Reactor Experiment and Molten Salt Reactor Experiment. Primary areas of evaluation include fuel cycle facilities, transportation and at reactor fuel mixing operations up to reactor startup. In general, there was difficulty synthesizing publicly available information due to the early stage of the MSR development and proprietary information associated with the reactor technology companies analyzed. There are a few specific recommendations from this report. One overarching paradigm shift that the NRC needs to evaluate is the possibility of collocating fuel cycle facilities with operating MSRs. Although there is no specific prohibition to this in the NRC regulations, the collocation of the fuel cycle facilities with the operating MSR presents a novel approach compared to the light water reactor baseline. More guidance and research into thorium operations and regulation is needed. The hazards associated with the stability of stored fuel constituents need to be evaluated. Some reactor fuel cycles use beryllium, and its use and the associated hazards need further analysis. NRC-approved designs for transportation packages for shipping molten salt fuels and factory-built and fueled reactors are not available.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MRCI Subtask 2.4/2.5: Regional/Subregional Analysis and Risk Assessment Final Technical Summary Report

The objective of the Midwest Regional Carbon Initiative (MRCI) project is to implement a collaborative Regional Initiative (RI) to accelerate the deployment of carbon capture, and storage (CCS) in the Midwest-Northeastern quadrant of the United States. This report is a Technical Summary report describing work performed on Tasks 2.4 (Conducting Regional/Subregional Analysis) and 2.5 (Assessing and Managing Risk) during the MRCI project. In Task 2.4, detailed numerical reservoir simulation models were developed for selected carbon storage (CS) systems identified under Task 2.1 (Battelle, 2021a) in the MRCI study area. The objective of Task 2.4 is to demonstrate a dynamic modeling methodology for evaluating the suitability of the (selected) CS systems in the MRCI region for hosting a commercial-scale storage project. In this study, CO2 injectivity was evaluated for different CS systems with an annual injection rate of 1 million metric tonnes (MMT) of CO2 considered as the minimum requirement for a commercial scale project. The objective of Task 2.5 is to assess key risks associated with storing CO2 in the different CS systems across the MRCI region and to demonstrate a method(s) for assessing these risks that may be used by developers of future CO2 storage projects in the region. The risk analysis was limited to evaluating two types of leakage risks (i.e., wellbore leakage, flow across unfractured caprock) at three modeled sites considered in Task 2.4.

MRCI,Report,Summary,Technical Challenges,dynamic m↗

Assessing the technical aspects of ocean-alkalinity-enhancement approaches

Ocean alkalinity enhancement (OAE) is an emerging strategy that aims to mitigate climate change by increasing the alkalinity of seawater. This approach involves increasing the alkalinity of the ocean to enhance its capacity to absorb and store carbon dioxide (CO 2 ) from the atmosphere. This chapter presents an overview of the technical aspects associated with the full range of OAE methods being pursued and discusses implications for undertaking research on these approaches. Various methods have been developed to implement OAE, including the direct injection of alkaline liquid into the surface ocean; dispersal of alkaline particles from ships, platforms, or pipes; the addition of minerals to coastal environments; and the electrochemical removal of acid from seawater. Each method has its advantages and challenges, such as scalability, cost effectiveness, and potential environmental impacts. The choice of technique may depend on factors such as regional oceanographic conditions, alkalinity source availability, and engineering feasibility. This chapter considers electrochemical methods, the accelerated weathering of limestone, ocean liming, the creation of hydrated carbonates, and the addition of minerals to coastal environments. In each case, the technical aspects of the technologies are considered, and implications for best-practice research are drawn. The environmental and social impacts of OAE will likely depend on the specific technology and the local context in which it is deployed. Therefore, it is essential that the technical feasibility of OAE is undertaken in parallel with, and informed by, wider impact assessments. While OAE shows promise as a potential climate change mitigation strategy, it is essential to acknowledge its limitations and uncertainties. Further research and development are needed to understand the long-term effects, optimize techniques, and address potential unintended consequences. OAE should be viewed as complementary to extensive emission reductions, and its feasibility may be improved if it is operated using energy and supply chains with minimal CO 2 emissions.

54 ENVIRONMENTAL SCIENCES↗

An Assessment of Technical Hydropower Potential at Non-Powered Dams in the United States

Historically, dams have been constructed for a variety of purposes, such as providing a more secure and reliable water supply, mitigating impacts from variations in river flow, allowing continuous navigability, and harnessing mechanical power. A relatively small portion of dams have been designed to store or regulate flows for the purpose of generating electricity (roughly 3% of nationally inventoried dams in the US and 17% of the dams included in the World Register of Dams). The remaining population of existing non-powered dams (NPDs) presents both an opportunity to generate renewable energy and a need to modernize aging infrastructure. This report describes an assessment of more than 2,600 NPDs in the US that have a collective potential of nearly 4 GW in new power capacity. Previous national-scale assessments were aimed at evaluating the theoretical maximum power potential at existing dams in the United States. These estimates were based on the best available information at the time for water availability, hydraulic head, and representative regional capacity factors. This study revisits a subset of 3,299 dams identified in the most recent theoretical resource assessment and uses more detailed and updated hydrologic data to produce estimates of technical potential. These improvements in data enable estimates that more realistically reflect what is physically possible given simple assumptions about the existing structure and constraints on flow and head (Figure 1).

13 HYDRO ENERGY↗

Solid-State Transformer and Hybrid Transformer With Integrated Energy Storage in Active Distribution Grids: Technical and Economic Comparison, Dispatch, and Control

Solid-state transformer (SST) and hybrid transformer (HT) are promising alternatives to the line-frequency transformer (LFT) in smart grids. The SST features medium-frequency isolation, full controllability for voltage regulation, reactive power compensation, and the capability of battery energy storage system (BESS) integration with multiport configuration. The HT has a partially-rated converter for fractional controllability and can integrate a small BESS. Fast grid-edge voltage fluctuations from increased solar photovoltaic (PV) and electric vehicle (EV) penetration are difficult to manage for mechanical load tap changers. Hence, along with the trend towards more BESS in the grid, the controllability and the storage integration capability of the SST and HT are of strong interest. However, a review of literature shows existing SST and HT research is mostly at converter level, while system-level assessments are scarce. Assessing technical and economic impacts is critical to understanding the benefits and role of the SST and HT to guide future research, which is presented for the first time in this article. Experimental results from medium-voltage (MV) SST and MV HT prototypes are shown to confirm equipment-level feasibility, where the voltage controllability waveforms of a MV HT prototype are reported for the first time. Comparative simulations are performed on a modified IEEE 34-bus system. Here, a grid-model-less decentralized grid-edge voltage control method and a day-ahead BESS dispatch method are proposed for the SST and HT. The simulations show that the SST and HT with integrated storage can host more PV, achieve peak shaving, mitigate voltage fluctuation and reverse power flow, and support energy arbitrage for operational cost reduction, as compared to the LFT. Moreover, comprehensive analyses of net present value (NPV) and internal rate of return (IRR) are performed under different installed PV capacities, HT’s partial converter ratings, and BESS capacities. Sensitivities to future cost reductions of the PV and BESS are studied. Although the NPV and IRR are currently negative, 60% capital cost reduction or 150% revenue increase will make the SST and HT economically viable in the use case studied.

14 SOLAR ENERGY↗

A Technical-Economic Assessment of Brackish Water Treatment for Fossil Power Plant Cooling with Reduced Environmental Impact

The power sector accounts for approximately 40% of freshwater use in the U.S. Reusing non-traditional water resources is critical for alleviating water stress in the western United States. The purpose of this study is to conduct a techno-economic system analysis to evaluate the potential of brackish water treatment for wet cooling towers at existing thermo-electric generating units (EGUs). It aims to address current knowledge gaps in support of non-traditional water resources planning and the electric power industry's water decision- and policy making. An engineering-economic model was developed and combined with DuPont's water application value engine (WAVE) v1.82 to evaluate the viability of retrofitting reverse osmosis-based brackish water treatment systems to individual existing EGUs and then aggregating the unit-level results to the fleet level. In the base case, brackish water treatment can reduce freshwater consumption of electric generation units by 94–100% while increasing the cost of electric generation by approximately 10% and have marginal impacts on the units' parasitic loads. When zero liquid discharge systems are applied to brackish water brine treatment, the cost of electric generation and freshwater consumption savings and energy penalty to the power plant significantly increase. These costs are even higher than dry cooling deployment in lieu of wet cooling towers. The choice of freshwater savings between brackish water desalination and dry cooling deployment depends greatly on how the concentrated brines are managed. Multiple factors must be considered when supporting decision-making in water management and planning in power sectors, which include non-traditional water quantity and quality as well as trade-offs among technical performance, economics, and environmental impacts.

Wu, Zitao↗

Energy Transitions Initiative Partnership Project: Wainwright, Alaska. Cohort 1 Technical Assistance: Assessment of Energy Efficiency, Renewable Energy, and Energy Storage Options

This project identified pathways to reduce energy consumption and enhance indoor environmental quality and resilience of a 1,500-square-foot former federal armory building owned by the tribe as it is renovated as a community multipurpose facility. The scope included thermal evaluation of multiple building efficiency measures, and a techno-economic exploration of an on-site renewable energy and integrated energy storage systems.

25 ENERGY STORAGE↗

Assessing the Technical Potential of Fast Frequency Response in Grid-Supportive Loads

Fast frequency response (FFR) is a critical tool for grid operators to manage contingency events in low-inertia systems. While large generators and loads are more commonly used, many smaller end use loads, in aggregate, can provide FFR across a large system. This work considers the technical potential of power electronics-based loads for autonomous FFR in low-inertia grids. We consider multiple factors that might influence the impact of FFR for various end use loads, with a focus on residential loads.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Prime Time for Model-Predictive Control? Assessing the Technical and Market Readiness of Advanced Controls in Buildings

Despite three decades of extensive research and field testing that have consistently validated the benefits of Model Predictive Control (MPC) in building applications, the technology has seen limited market adoption. This paper evaluates the readiness of MPC for widespread deployment, showcases recent demonstrations and field tests across diverse building types, including residential, small commercial, large commercial, and campus settings. Our results demonstrate that MPC can optimize system operations to achieve load shifting, minimize curtailment of on-site generation, and reduce energy costs by up to 80 %, while maintaining or improving occupant comfort. We also show that MPC can effectively control large assets, such as MW-sized thermal storage systems, and respond to dynamic pricing signals. However, achieving scale remains difficult due to labor-intensive workflows, reliance on a “PhD-in-the-loop” for MPC design and maintenance, susceptibility to fragile data infrastructure, and persistent workforce education and acceptance barriers. To bridge this gap, we outline a transition from bespoke, labor intensive prototypes toward streamlined, segment-targeted deployment strategies that leverage model templates, semantic tools, and generative AI. By automating control configuration and reducing engineering effort, these recommendations provide a pathway for transforming successful research demonstrations into scalable, market ready solutions for MPC-based controls.

Pritoni, Marco↗

The Third Assessment of the Effects of Climate Change on Federal Hydropower

Understanding the future changes in projected water supplies is a vital objective for federal hydropower facilities tasked with providing low-cost, reliable electricity across a large regional footprint that encompasses a growing customer base, alternative market structures for marketing the electricity, and a more diverse generation asset mix than was historically present when a majority of federal hydropower facilities were built. This study, The Third Assessment of the Effects of Climate Change on Federal Hydropower, directed by Section 9505 of the SECURE Water Act of 2009 (SWA), is the third quinquennial report on evaluating the effects of climate change on hydroelectric energy generated from 132 US federal hydropower plants marketed by four US Department of Energy (DOE) Power Marketing Administrations (PMAs). The technical assessment is conducted by DOE’s Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and Texas A&M University under the guidance of DOE’s Water Power Technologies Office. This study is the result of extensive consultation with the four federal PMAs (Bonneville Power Administration [BPA], Western Area Power Administration [WAPA], Southwestern Power Administration [SWPA], and Southeastern Power Administration [SEPA]), as well as other agencies, including federal hydropower owners/operators (the US Army Corps of Engineers, US Bureau of Reclamation [Reclamation]), US Geological Survey, and National Oceanic and Atmospheric Administration). The main findings of this assessment, along with the PMA administrators’ recommendations, will be included in a subsequent DOE report to Congress. The assessment method and the technical findings are described in this report.

13 HYDRO ENERGY↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data Quality of Salt Property Measurements

Data quality is a key element to assessing technical uncertainties in property values of salt mixtures that are pivotal in molten salt reactor (MSR) design and safety assessments under both normal operating conditions and accident scenarios. Key properties for the salt mixtures being evaluated for use in MSRs have not been measured and the few values for relevant salt compositions available in the literature are inconsistent and not suitable for use in licensing. The applications of established techniques commonly used for property measurements to molten salts are still experimental in nature and vetted consensus standards are not yet available. Work is in progress to develop and standardize methods through DOE and commercially funded projects. The quality of measured property values limits the current ability to reliably design equipment and model normal MSR operation and the effects of operational upsets. Insights from experimental measurements pertinent to reducing technical uncertainty for regulatory development are summarized in this report. Quality controls are recommended for key properties based on the mathematical calculations used to derive property values and methods used to measure experimental values and salt produced for use in the measurements.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Carbon Storage Technical Viability Approach and National Data Assessment

Carbon Storage Technical Viability Approach is a comprehensive evaluation of potential geologic carbon storage sites that includes classic subsurface resource assessment components such as reservoir suitability in addition to hazard, environmental, social, regulatory, and jurisdiction components that may enhance or hinder successful carbon storage. Data for assessments of technically viable carbon storage span many categories, types; are disparate and numerous. Variables and types of data required to support CS assessments were previously not clearly defined and documented. Contextualizing available data indicates their utility, potential uncertainty, and gaps. This presentation details the Carbon Storage Technical Viability Approach, the associated matrix and database, and initial results from a portion of the national data availability assessment that contextualizes the data available to support carbon storage projects. Presented at the American Association of Petroleum Geologists' Carbon Capture Utilization and Storage (SPE-AAPG-SEG CCUS 2024) conference in Houston, TX, March 11-13, 2024.

Mark-Moser, Mackenzie K.↗

Unseen Winds: Harnessing High-Altitude Winds in the Southeast USA

This project aims to identify potential sites in the United States for further testing and development of airborne wind energy systems (AWES). Through industry questionnaires and interviews with AWES companies, the study assesses existing test sites' capabilities and gaps, leading to a three-tiered test site strategy: short-duration prototype demonstrations, long-duration technical assessments and power validations, and airspace interaction and deconfliction studies. Notably, the southeastern United States presents significant potential for AWES due to its lack of traditional wind turbines, which is attributed to low wind speeds at lower altitudes. However, wind conditions improve significantly at higher altitudes, making this region a promising candidate for AWES deployment. The project considers factors such as wind resources, infrastructure proximity, social acceptance, and environmental impacts to recommend sites that can support the unique needs of AWES manufacturers and facilitate their commercialization. Early findings suggest rural communities with low grid resiliency could benefit economically and technologically from hosting AWES test sites, especially with operator training centers and potential for long-term skilled employment in future disaster relief and other applications.

17 WIND ENERGY↗

Automating the Solar Interconnection Technical Evaluation Process: PREconfiguring and Controlling Inverter SEt-Points (PRECISE)

Utilities are receiving an increasing number of interconnection requests for distributed solar photovoltaic (PV) systems from their customers, requiring a solution to quickly and intelligently perform technical assessments of these requests and to manage these new renewable energy assets. In this paper, we present a stand-alone interconnection tool, PREconfiguring and Controlling Inverter SEt-points (PRECISETM), and how it overcomes the challenges of accelerating technical evaluations and leverages smart inverter functionality to provide local voltage support on an as-needed basis. The paper details the purpose and architecture of PRECISE, including tools, data source requirements, the model-based interconnection evaluation process, and technical results. PRECISE is an integrated software tool that customizes PV inverter settings for utilities by modeling and assessing impacts on local voltages and the need for advanced inverter functions (AIFs) (e.g., volt-VAR and volt-watt). PRECISE maximizes the use of readily available utility data sets to make fast online assessments of incoming PV interconnection requests and makes accept/reject recommendations along with custom settings for AIFs.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗