Engineering PapersSearch

SEARCH · Engineering Papers

Results for “systemic risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

The Current State and Future of the Former Central Nervous System Risk Managed by Space Radiation Element Part of NASA’s Human Research Program

Historically, the Space Radiation Element, as part of the NASA Human Research Program, was responsible for the scientific strategy and funding of research focused on characterizing and mitigating the effects of space radiation exposure on the central nervous system (CNS). During the past few of years, there have been two major changes that have affected the management of the science associated with the CNS risk. The first major change was the integration of several related risks: CNS (C), Behavioral medicine (B), and sensorimotor (S) to be managed as an integrated effort called CBS. CBS was formed to accelerate research on combined spaceflight stressors, specifically space radiation, microgravity, isolation, and confinement. CBS was managed by Human Factors and Behavioral Performance (HFBP) with support and inputs from Space Radiation as well as Human Health Countermeasures. Secondly, and more recently, the CNS risk was absorbed by the behavioral medicine risk currently also held by HFPB. As a result, the gaps associated with CNS were removed and aspects of them are represented in the BMED gaps (link). However, due to recent changes in element leadership, budget, and timeline, extensive restructuring of CBS is in progress. In addition, in an effort to harmonize datasets to be used in modelling efforts, an Animal Standardization TIM was held in June 2021 to standardize the type of behavioral and cognitive tasks as well as experimental set-ups. This presentation is an effort to communicate with the radiation research community concerning the strategy, management, and future of the former central nervous system risk and the role of the Space Radiation Element.

central nervous system

The Current State and Future of the Former Central Nervous System Risk Managed by Space Radiation Element Part of NASA’s Human Research Program

Historically, the Space Radiation Element, as part of the NASA Human Research Program, was responsible for the scientific strategy and funding of research focused on characterizing and mitigating the effects of space radiation exposure on the central nervous system (CNS). During the past few years, there have been two major changes that have affected the management of the science associated with the CNS risk. The first major change was the integration of several related risks: CNS (C), behavioral medicine (B), and sensorimotor (S) to be managed as an integrated effort called CBS. CBS was formed to accelerate research on combined spaceflight stressors, specifically space radiation, microgravity, isolation, and confinement. CBS was managed by Human Factors and Behavioral Performance (HFBP) with support and inputs from Space Radiation as well as Human Health Countermeasures. Secondly, and more recently, the CNS risk was absorbed by the behavioral medicine risk currently also held by HFPB. As a result, the gaps associated with CNS were removed and aspects of them are represented in the BMED gaps (link). However, due to recent changes in element leadership, budget, and timeline, extensive restructuring of CBS is in progress. In addition, in an effort to harmonize datasets to be used in modeling efforts, an Animal Standardization TIM was held in June 2021 to standardize the type of behavioral and cognitive tasks as well as experimental set-ups used in animal models of future funded research. This presentation is an effort to communicate with the radiation research community concerning the strategy, management, and future of the former central nervous system risk and the role of the Space Radiation Element.

Janice A Zawaski

Ground Data System Risk Mitigation Techniques for Faster, Better, Cheaper Missions

With the advent of faster, cheaper, and better missions, NASA Projects acknowledged that a higher level of risk was inherent and accepted with this approach. It was incumbent however upon each component of the Project whether spacecraft, payload, launch vehicle, or ground data system to ensure that the mission would nevertheless be an unqualified success. The Small Explorer (SMEX) program's ground data system (GDS) team developed risk mitigation techniques to achieve these goals starting in 1989. These techniques have evolved through the SMEX series of missions and are practiced today under the Triana program. These techniques are: (1) Mission Team Organization--empowerment of a closeknit ground data system team comprising system engineering, software engineering, testing, and flight operations personnel; (2) Common Spacecraft Test and Operational Control System--utilization of the pre-launch spacecraft integration system as the post-launch ground data system on-orbit command and control system; (3) Utilization of operations personnel in pre-launch testing--making the flight operations team an integrated member of the spacecraft testing activities at the beginning of the spacecraft fabrication phase; (4) Consolidated Test Team--combined system, mission readiness and operations testing to optimize test opportunities with the ground system and spacecraft; and (5). Reuse of Spacecraft, Systems and People--reuse of people, software and on-orbit spacecraft throughout the SMEX mission series. The SMEX ground system development approach for faster, cheaper, better missions has been very successful. This paper will discuss these risk management techniques in the areas of ground data system design, implementation, test, and operational readiness.

Catena, John J.

Human System Risk Management - Tools of our Trade

The risk of infectious disease to select individuals has historically been difficult to predict in either spaceflight or on Earth with health care efforts relying on broad-based prevention and post-infection treatment. Over the past 10 years, quantitative microbial risk assessment evaluations have evolved to formalize the assessment process and quantify the risk. This process of hazard identification, exposure assessment, dose-response assessment, and risk characterization has been applied by the water and food safety industries to address the public health impacts associated with the occurrence of and human exposure to pathogens in water and food for the development of preventive strategies for microbial disease. NASA is currently investigating the feasibility of using these techniques to better understand the risks to astronauts and refine their microbiological requirements. To assess these techniques, NASA began an evaluation of the potable water system on the International Space Station to determine how the microbial risk from water consumption during flight differed from terrestrial sources, such as municipal water systems. The ultimate goal of this work is to optimize microbial requirements which would minimize unnecessary cargo and use of crew time, while still protecting the health of the crew. Successful demonstration of this risk assessment framework with the water system holds the potential to maximize the use of available resources during spaceflight missions and facilitate investigations into the evaluation of other routes of infection, such as through the spaceflight foods system.

Ott, C. Mark

Hydrogen Transportation and Distributed Energy Systems Risk Assessment for Airport Facilities (CRADA 555) (Final Report)

Portland International Airport (PDX), Oregon, operated by the Port of Portland (Port) is exploring the possibility of operating a fleet of 28 fuel cell electric buses and developing a distributed energy system to support airport operations during various operating modes including large-scale power outages. This study investigates the compatibility of these two missions, which will be key to resilience management at PDX. This study also investigated the risks associated with deploying a hydrogen system that could support bus operations and be utilized during an emergency to ensure continued operation of the airport. This will be a key innovation for the deployment of hydrogen systems at airports. Utilizing the unique benefits of hydrogen infrastructure for multiple roles will aid adopters in justifying new projects and serve to demonstrate the versatility of hydrogen as an energy-carrier to a wider market.

08 HYDROGEN

STARS: The Space Transportation Architecture Risk System

Because of the need to perform comparisons between transportation systems that are likely to have significantly different levels of risk, both because of differing degrees of freedom in achieving desired performance levels and their different states of development and utilization, an approach has been developed for performing early comparisons of transportation architectures explicitly taking into account quantitative measures of uncertainty and resulting risk. The approach considers the uncertainty associated with the achievement of technology goals, the effect that the achieved level of technology will have on transportation system performance and the relationship between transportation system performance/capability and the ability to accommodate variations in payload mass. The consequences of system performance are developed in terms of expected values and associated standard deviations of nonrecurring, recurring and the present value of transportation system life cycle cost. Typical results are presented to illustrate the application of the methodology.

Greenberg, Joel S.

Failure detection system risk reduction assessment

A process includes determining a probability of a failure mode of a system being analyzed reaching a failure limit as a function of time to failure limit, determining a probability of a mitigation of the failure mode as a function of a time to failure limit, and quantifying a risk reduction based on the probability of the failure mode reaching the failure limit and the probability of the mitigation.

Aguilar, Robert B.

Requirements based system risk modeling

The problem that we address in this paper is assessing the expected degree of success of the system or mission based on the degree to which each requirement is satisfied and the relative weight of the requirements. We assume a complete list of the requirements, the relevant risk elements and their probability of occurrence and the quantified effect of the risk elements on the requirements. In order to assess the degree to which each requirement is satisfied, we need to determine the effect of the various risk elements on the requirement.

risk

Hydrogen Transportation and Distributed Energy Systems Risk and Feasibility Assessment for Airport Facilities - CRADA 555 (Abstract)

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support PDX in performing a risk assessment for several hydrogen deployment scenarios. It is intended that the deployment of hydrogen at PDX could serve several roles, including decarbonizing its bus fleet and building out a distributed energy system which could also be used to facilitate emergency operations. PDX’s initial plans concern replacing their current fleet of 28 busses with FCEBs. To do so, PDX will need to deploy the hydrogen systems needed to support the buses. This includes hydrogen storage, production, delivery, filling, compression, and maintenance. PDX also has long range plans to build a distributed energy system to support normal and resilient operations. This study will investigate the risks of each plan individually, and a combined plan which serves both. Additionally, PDX is in an area with the potential for high seismic activity, as such this work will also include a seismic risk assessment. A detailed risk assessment using PDX as a test case is necessary to ensure the deployment of large-scale hydrogen is successful and to understand the benefits or drawbacks in contrast to electric only technologies. Many technologies have been proposed that claim to utilize hydrogen for both transportation and distributed energy systems; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for PDX will be analyzed, a risk assessment will be performed on the hydrogen infrastructure and distributed energy system. These assessments will be useful for understanding how each of these technologies would perform as applied to a large public facility and public safety. The results of this CRADA, and an impact of the DOE funding, will evaluate hydrogen as a key fuel for PDX and will accelerate by several years availability of hydrogen, fuel cells, and other low-carbon technologies.

08 HYDROGEN

System Risk Balancing Profiles: Software Component

The Software QA / V&V guide will be reviewed and updated based on feedback from NASA organizations and others with a vested interest in this area. Hardware, EEE Parts, Reliability, and Systems Safety are a sample of the future guides that will be developed. Cost Estimates, Lessons Learned, Probability of Failure and PACTS (Prevention, Avoidance, Control or Test) are needed to provide a more complete risk management strategy. This approach to risk management is designed to help balance the resources and program content for risk reduction for NASA's changing environment.

Kelly, John C.

Natural Hazard Forecast Alert Grid Risk System

Weather events cause most power outages. Often, we even get notifications on our phones to take cover or be prepared for an imminent event. If electric grid utilities had a similar warning that also included probable scenarios and the equipment involved, they could prepare and minimize the effects. Idaho National Laboratory had a project with the U.S. Department of Energy’s Cybersecurity, Energy Security, and Emergency Response program to develop a grid alert application that receives messages from the existing emergency alert system, filters and determines components possibly affected by the emergency event, calculates probable scenarios using MASTERRI (Modeling And Simulation for Targeted Reliability and Resilience Improvement). For high-risk events, the application can then send alert links to subscribed electric distribution utility operations staff to allow them to see and evaluate the scenarios and the impact in a web based interactive map tool. This proof of concept application used data from utilities and organizations, such as the international regulatory body North American Electric Reliability Corporation, which have complied historical failure data of elements that comprise the U.S. electric grid. Nominal failure rates are obtained from this data. To make this tool possible, estimated failure rates were calculated for different component types given the alert type, severity, and location. Historic weather-related grid element failures were correlated with historic weather events from the Integrated Public Alert & Warning System. These correlated events and failures are used along with Bayesian updates from the historical norms to provide a modified failure rate for grid elements in the alert areas and calculate probable scenarios. Working with an industry collaborator, actual grid models and data were used for demonstration cases. This report outlines the work performed for this project.

24 - POWER TRANSMISSION AND DISTRIBUTION

Enhancing Interdisciplinary Human System Risk Research Through Modeling and Network Approaches

NASA's Human Research Program (HRP) supports research to reduce human health and performance risks inherent in future human space exploration missions. Understanding risk outcomes and contributing factors in an integrated manner allows HRP research to support development of efficient and effective mitigations from cross‐disciplinary perspectives, and to enable resilient human and engineered systems for spaceflight. The purpose of this work is to support scientific collaborations and research portfolio management by utilizing modeling for analysis and visualization of current and potential future interdisciplinary efforts.

Mindock, Jennifer

Vulnerabilities, Influences and Interaction Paths: Failure Data for Integrated System Risk Analysis

We describe graph-based analysis methods for identifying and analyzing cross-subsystem interaction risks from subsystem connectivity information. By discovering external and remote influences that would be otherwise unexpected, these methods can support better communication among subsystem designers at points of potential conflict and to support design of more dependable and diagnosable systems. These methods identify hazard causes that can impact vulnerable functions or entities if propagated across interaction paths from the hazard source to the vulnerable target. The analysis can also assess combined impacts of And-Or trees of disabling influences. The analysis can use ratings of hazards and vulnerabilities to calculate cumulative measures of the severity and importance. Identification of cross-subsystem hazard-vulnerability pairs and propagation paths across subsystems will increase coverage of hazard and risk analysis and can indicate risk control and protection strategies.

Malin, Jane T.

NEXT Ion Propulsion System Risk Mitigation Tests in Support of the Double Asteroid Redirection Test Mission

Risk mitigation tests have been conducted by the NASA Glenn Research Center and The Aerospace Corporation in support of the DART Mission. The tests focused on NEXT performance characterizations intended to ensure its operations and characteristics are compatible with the DART mission operations, and to assist in the definition of the propulsion system. Tests were performed at the Aerospace Corporation and they involved: flow sensitivity-analyses, steady-state performance characterizations, and measurements of thruster erosion. The tests also involved defining, demonstrating, verifying, and evaluating the start-up sequences and a beam current regulation algorithm consistent with DART mission requirements. It was found that NEXT thruster operations are compatible with the proposed relaxation of flow control ranges for ignition and for steady-state operation.

Thomas, Robert E.

NEXT Ion Propulsion System Risk Mitigation Tests in Support of the Double Asteroid Redirection Test Mission

Risk mitigation tests have been conducted by the NASA Glenn Research Center and The Aerospace Corporation in support of the DART Mission. The tests focused on NEXT performance characterizations intended to ensure its operations and characteristics are compatible with the DART mission operations, and to assist in the definition of the propulsion system. Tests were performed at the Aerospace Corporation and they involved: flow sensitivity-analyses, steady-state performance characterizations, and measurements of thruster erosion. The tests also involved defining, demonstrating, verifying, and evaluating the start-up sequences and a beam current regulation algorithm consistent with DART mission requirements. It was found that NEXT thruster operations are compatible with the proposed relaxation of flow control ranges for ignition and for steady-state operation.

Thomas, Robert E.

NEXT Ion Propulsion System Risk Mitigation Tests in Support of the Double Asteroid Redirection Test Mission

Risk mitigation tests have been conducted by the NASA Glenn Research Center and The Aerospace Corporation in support of the DART Mission. The tests focused on NEXT performance characterizations intended to ensure its operations and characteristics are compatible with the DART mission operations, and to assist in the definition of the propulsion system. Tests were performed at the Aerospace Corporation and they involved: flow sensitivity-analyses, steady-state performance characterizations, and measurements of thruster erosion. The tests also involved defining, demonstrating, verifying, and evaluating the start-up sequences and a beam current regulation algorithm consistent with DART mission requirements. It was found that NEXT thruster operations are compatible with the proposed relaxation of flow control ranges for ignition and for steady-state operation.

Thomas, Robert E.