Annual Summary Report (FY 2025) Performance Assessment for the Environmental Restoration Disposal Facility
Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are eight cells and two supercells in ERDF. Each supercell is the equivalent of two cells. During this reporting period, fiscal year (FY) 2025, extending from October 1, 2024, through September 30, 2025, approximately 50,653 metric tons (55,835 U.S. tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2025, approximately 17.3 million metric tons (19.1 million U.S. tons) of waste has been disposed at ERDF, which equates to consumption of approximately 91.0% of the currently constructed disposal volume. According to the design of ERDF, the facility has the ability to be expanded as needed. In 2023, the Department of Energy approved the construction of supercell 11 to provide additional disposal capacity to meet the cleanup mission at the Hanford Site. The construction of supercell 11 began in FY 2025, and it is expected to take up to two years. Construction of the new cell will not affect ongoing waste disposal activities at ERDF.