DOE OSTI2022
GE Steam Power, Inc. (GE) proposed to improve reliability, flexibility, and economics of an existing coal-fired power plant by applying a new advanced technology developed by GE, a plasma-assisted pulverized fuel firing system. The objective of this program is to demonstrate the achievement of lower load by improved flame stabilization and therefore lower operating costs in a full-scale field installation at coal-fired electric utility. GE’s Plasma Ignition and Combustion Stabilization System is designed to operate continuously to support low load operation. With the plasma on, the flame will be attached and stable, removing the firing system as a limitation to low load operation. In addition, GE’s exclusively from ABENZ company licensed AC based technology has a 90+% system efficiency compared to all other systems at which are DC and operate with ~75% efficiency. Plant operating costs are lowered by eliminating use of expensive support fuel as well as the ability to operate at lower loads. The utilities’ ability to better match the demand curve will result in significant savings. Maintenance is lower for an AC system than a DC system as it operates at lower current. This eliminates the need for a demineralized cooling water system and provides longer electrode life which translates into both material and labor savings. It is the objective of GE to not only demonstrate the additional low load achievable with a plasma system after best achievable tuning, sensor and software approach has been exhausted, but also the increased stability of the flame at all loads with plasma assistance as well as cost savings at all low loads using plasma instead of oil. Upon successful completion of this project, GE will have sufficient field experience to rapidly deploy the Plasma Technology. The project objectives were achieved through the implementation of plasma ignitor technology at PacifiCorp Hunter Station Unit 3. A plasma ignitor system was retrofitted on ten wall-fired burners, Mill 3-4 combustion system. The Plasma Ignitors installed at Hunter proved that this GE technology is a direct and complete replacement for the original oil ignitors. The Hunter Unit 3 burner management system allows the plasma system to be used in all applications that originally required oil to be burned. This includes any time the Mill 3-4 is started or stopped for any reason including boiler starts, load changes, and low load support.
01 COAL, LIGNITE, AND PEAT↗