Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “statu”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

25 records · Page 2

An Ecological Approach to the Design of UAV Ground Control Station (GCS) Status Displays

Use of UAVs in military and commercial applications will continue to increase. However, there has been limited research devoted to UAV GCS design. The current study employed an ecological approach to interfac e design. Ecological Interface Design (EID) can be characterized as r epresenting the properties of a system, such that an operator is enco uraged to use skill-based behavior when problem solving. When more ef fortful cognitive processes become necessary due to unfamiliar situations, the application of EID philosophy supports the application of kn owledge-based behavior. With advances toward multiple UAV command and control, operators need GCS interfaces designed to support understan ding of complex systems. We hypothesized that use of EID principles f or the display of UAV status information would result in better opera tor performance and situational awareness, while decreasing workload. Pilots flew a series of missions with three UAV GCS displays of statu s information (Alphanumeric, Ecological, and Hybrid display format). Measures of task performance, Situational Awareness, and workload dem onstrated the benefits of using an ecological approach to designing U AV GCS displays. The application of ecological principles to the design of UAV GCSs is a promising area for improving UAV operations.

Dowell, Susan↗

The Swift GRB Mission

Swift is a MIDEX mission that is in development for launch in October 2004. It is a multiwavelength transient observatory for GRB astronomy. The goals of the mission are to determine the origin of GRBs and their afterglows and use bursts to probe the early Universe. A wide-field gamma-ray camera will detect mare than 100 GRBs per year to -3 times fainter than BATSE. Sensitive narrow-field X-ray and UV/optical telescopes will be pointed at the burst location in 20 to 75 sec by an autonomously controlled spacecraft. Far each burst, aresec positions will be determined and optical/UV/X-ray/gamma-say spectrophotometry performed. Measurements of redshift will be made for many burstes. The instrumentation is a combination of superb existing flight-spare hardware and design from XMM and Spectrum-X/JET-X contributed by collaborators in the UK and Italy and development of a coded-aperture camera with a large-area (approx. 0.5 square meter) CdZnTe detector array. Key components of the mission are vigorous follow-up and outreach programs to engage the astronomical community and public in Swift. The talk vi11 describe the mission statue and give a summary of plans for GRB operations. It is likely that Swift will have just been launched at the time of the conference.

Gehrels, Neil↗

Structural Verification of the First Orbital Wonder of the World - The Structural Testing and Analysis of the International Space Station (ISS)

The International Space Station (ISS) can be considered one of the structural engineering wonders of the world. On par with the World Trade Center, the Colossus of Rhodes, the Statue of Liberty, the Great Pyramids, the Petronas towers and the Burj Khalifa skyscraper of Dubai, the ambition and scope of the ISS structural design, verification and assembly effort is a truly global success story. With its on-orbit life projected to be from its beginning in 1998 to the year 2020 (and perhaps beyond), all of those who participated in its development can consider themselves part of an historic engineering achievement representing all of humanity. The structural design and verification of the ISS could be the subject of many scholarly papers. Several papers have been written on the structural dynamic characterization of the ISS once it was assembled on-orbit [1], but the ground-based activities required to assure structural integrity and structural life of the individual elements from delivery to orbit through assembly and planned on-orbit operations have never been totally summarized. This paper is intended to give the reader an overview of some of the key decisions made during the structural verification planning for the elements of the U.S. On-Orbit Segment (USOS) as well as to summarize the many structural tests and structural analyses that were performed on its major elements. An effort is made for this paper to be summarily comprehensive, but as with all knowledge capture efforts of this kind, there are bound to be errors of omission. Should the reader discover any of these, please feel free to contact the principal author. The ISS (Figure 1) is composed of pre-integrated truss segments and pressurized elements supplied by NASA, the Russian Federal Space Agency (RSA), the European Space Agency (ESA) and the Japanese Aerospace Exploration Agency (JAXA). Each of these elements was delivered to orbit by a launch vehicle and connected to one another either robotically or autonomously. The primary structure of each element was assembled and verified by teams of responsible structural engineers within and among their respective agencies and agency contractors.

Zipay, John J.↗

Regulatory Framework for Permanent Shut-down and Decommissioning of Nuclear Power Plant in Korea - 18101

Kori Unit 1, the first commercial NPP in Korea which was commissioned in 1978, was put on permanent shutdown for decommissioning on June 2017, after 40 years of operation. For permanent shutdown of the Kori Unit 1, an operation change permit was submitted in 2016 prior to the expiration since the NSA (Nuclear Safety Act) recognizes permanent shutdown as one of the operation stage. In preparation for the decommissioning of Kori Unit 1, the NSA related to decommissioning was revised and promulgated in 2015. The lower statues including Enforcement Decree and Regulation of the NSA, etc. were promptly revised to reflect decommissioning related requirements and procedures accordingly. For new NPPs, preliminary decommissioning plan is submitted and is being reviewed in the course of license review. Operating NPPs are also planning to submit the decommissioning plan by 2018 and receive approvals from Nuclear Safety and Security Commission. In case that an operator intends to decommission a nuclear installation, the operator shall apply for decommissioning and receive an approval from the NSSC. As discussed, framework for permanent shutdown and decommissioning of nuclear facilities have been well formatted by successful revision of NSA in Korea. Further detailed technical standards and regulatory guides on decommissioning will be developed to facilitate the relevant activities and ensure the nuclear safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The research progress of some key problems about the protection of industrial electron irradiation accelerator - Paper 9

In the last decades, electronic irradiation accelerator has made great progress and been widely used in fields. Because of its distinguishing feature of reliability and safety, electronic irradiation accelerator has attracted more attention of the investors, and created a huge economic value and social benefits. It will become the mainstream equipment of irradiation processing industry in future. So the further study of the shielding design around irradiation accelerator is of great significance. Different designs of ventilation duct will greatly influence dose rate of the exit. Because of the high dose rate under the target, it is suitable to use multi-tortuous duct when duct locating under target. It will reduce the dose rate about 3 orders of magnitude at the exit that add one backscattering interface in duct. Choose reasonable diameter and angle of embedded duct so that photons scatter as much as possible. We can use multiple small diameter ducts to replace large diameter duct. The system of Mini-DDL, Gamma detector and PC give a better reflection on the running statue of accelerator, its perfect usability can produce intuitive images for analyzed, it is important and helpful for workers and researchers to know about the radiation level of machine and environment. The measured results along the maze show that the maze must be long enough in order to achieve the desired shielding thickness. In future, we will combine the different kinds and motor patterns of body models, Monte Carlo programs, real time monitoring system with theoretical calculations to explore how the radiation field around accelerator has impact on human organs, get the dose distribution of body models so that improve the radiation protection to electron accelerator. (authors)

43 PARTICLE ACCELERATORS↗

Operations Coordination Plan Status

This will be presented at the Earth Science Constellation Mission Operations Working Group meeting to discuss Operations Coordination Plan Status.

statu↗