Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “stakeholder expectations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Used fuel transportation considerations to support centralized interim storage

The deployment of a used fuel centralized interim storage facility (CISF) can offer a renewed opportunity for the U.S. to make real progress towards integrating of the back end of the fuel cycle. One of the key elements of success, and perhaps as important as the CISF project itself, is transportation-program readiness for large-scale rail shipments of spent fuel to a centralized storage facility. This paper offers an overview of the status of spent fuel transportation readiness in the U.S. The authors identify a number of technical and institutional challenges to be resolved before rail shipments of used fuel to a centralized storage facility can begin. Furthermore, 'NAC International', a transportation company, recommends a key action to ensure a safe, secure and efficient transportation system that meets stakeholder expectations is ready to meet milestone dates. NAC will address the challenges of deploying such a system, focused on leveraging existing U.S. transportation experience, capabilities and infrastructure. This paper concludes with the assertion, that spent fuel transportation to a CISF by 2021 is possible if we seriously commit resources now to address the critical institutional, operational, and system requirements implicit in a consent based transportation and storage program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Challenges of mine remediation programmes in developing countries - a life cycle perspective - 15371

This paper analyses some challenges of environmental rehabilitation (ER) projects in developing countries that the authors have encountered over the past two decades in many parts of the world, discusses the reasons and proposes ways to mitigate them. In the life cycle of an ER project, some stages that are particularly decisive for the lasting rehabilitation success are considered here: (1) site characterisation/baseline studies, (2) justification and development of remediation objectives, site end states and a remediation strategy, and (3) the after-care phase. This paper argues that the time available in many ER projects in developing countries using international funding is very often insufficient, and discusses the reasons for some of the most important bottlenecks: (1) time realistically required to produce thorough baseline data and obtain historic site information that are indispensable to develop a robust remediation design, (2) lack of an adequate legal and regulatory framework, overlapping and/or conflicting provisions of national standards and discrepancies with international best practice, (3) unmanaged stakeholder expectations regarding the actual health and environmental risks, justification and prioritisation of remedial actions, and the achievable remediation end state. Insufficient resources for after-care, monitoring and, if required, corrective action is another major issue that, in the experience of the authors, jeopardises the sustainability of remediation success. Consequently by applying the lessons learnt from previous ER projects in developing (and developed) countries and taking them on board during the programming phase of new ER projects, international funding agencies could greatly help to avoid these obstacles. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plug-in Electric Vehicle Infrastructure: A Foundation for Electrified Transportation: Preprint

Plug-in electric vehicles (PEVs)--which include all-electric vehicles and plug-in hybrid electric vehicles--provide a new opportunity for reducing oil consumption by drawing power from the electric grid. To maximize the benefits of PEVs, the emerging PEV infrastructure--from battery manufacturing to communication and control between the vehicle and the grid--must provide access to cleanelectricity, satisfy stakeholder expectations, and ensure safety. Currently, codes and standards organizations are collaborating on a PEV infrastructure plan. Establishing a PEV infrastructure framework will create new opportunities for business and job development initiating the move toward electrified transportation. This paper summarizes the components of the PEV infrastructure, challengesand opportunities related to the design and deployment of the infrastructure, and the potential benefits.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Using Board Games as Subject Matter for Developing Expertise in Model-Based Systems Engineering

As more organizations transition from traditional document-centric systems engineering to a model-based approach, many are challenged to train their staff in new languages, tools, and methodologies, while managing the expectations of stakeholders and their expected model outcomes. In particular, challenges associated with learning a new modeling language and developing skills in the 'art' of modeling present organizations with formidable obstacles to realizing this transition. This paper hypothesizes that systems engineers may more readily learn how to correctly model with SysML, and develop intuition about the art of modeling and using patterns, if their learning references a commonly and thoroughly-understood subject, such as a board game. This paper presents a case for the use of board games as subject matter for new modelers. It demonstrates the concept with a sample model of Hasbro's popular board game, Monopoly, and discusses the limitations of this approach and potential adaptations that may broaden the applicability of the learned skills to projects. Finally, results from a small feasibility assessment and concepts for more formal study to evaluate the hypothesis are presented.

Model-Based Systems Engineering↗

Using Board Games as Subject Matter for Developing Expertise in Model-Based Systems Engineering

As more organizations transition from traditional document-centric systems engineering to a model-based approach, many are challenged to train their staff in new languages, tools, and methodologies, and manage the expectations of stakeholders and their expected model outcomes. In particular, challenges associated with learning a new modeling language and developing skills in the 'art' of modeling present organizations with formidable obstacles to realizing this transition. This paper hypothesizes that systems engineers may more readily learn how to correctly model with SysML, and develop intuition about the art of modeling and using patterns, if their learning references a commonly and thoroughly-understood subject matter, such as a board game. This paper presents a case for the use of board games as subject matter for new modelers, demonstrates the concept with a sample model of Hasbro's popular board game, Monopoly, and discusses the limitations of this approach and potential adaptations that may broaden the applicability of the learned skills to projects.

Systems Engineering↗

Exploring pluralism – Different stakeholder views of the expected and realised value of strategic environmental assessment (SEA)

This paper explores the concept of pluralism by evaluating different stakeholder views on the expected and realised value of strategic environmental assessment (SEA). The research followed a single embedded case study approach (of a national-level SEA for renewable energy planning in South Africa) and engaged with four different stakeholder groups, namely government, industry, conservation groups, and interested and affected parties (IAPs). A total of 21 different value expectations (VEs) across all four stakeholder groups were identified. However, stakeholder groups contrast significantly in terms of VEs, with government concerned more with process and mandate; industry with cost, efficiency and certainty; conservation groups with data and technical aspects; and the IAPs with local scale issues. In terms of realisation of VEs the results suggest that SEA does provide opportunities for learning; focussing project level EIA and providing spatial guidance on the location of projects. However, SEA was less successful in realising integration of decision making and alignment of policy within government. Recognition and better understanding of the pluralistic nature of expected and realised VEs could potentially improve the legitimacy of SEA processes and methodologies if they are designed and implemented to accommodate pluralism.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. Patent Pending, Cyberspace Security System for Complex Systems, U.S. Patent Application No.: 14/134,949

A computer implemented method monetizes the security of a cyber-system in terms of losses each stakeholder may expect to lose if a security break down occurs. A non-transitory media stores instructions for generating a stake structure that includes costs that each stakeholder of a system would lose if the system failed to meet security requirements and generating a requirement structure that includes probabilities of failing requirements when computer components fails. The system generates a vulnerability model that includes probabilities of a component failing given threats materializing and generates a perpetrator model that includes probabilities of threats materializing. The system generates a dot product of the stakes structure, the requirement structure, the vulnerability model and the perpetrator model. The system can further be used to compare, contrast and evaluate alternative courses of actions best suited for the stakeholders and their requirements.

Availablity↗

Combined Effects of Electric Vehicle Charging and Rooftop Solar Integration on Voltage Imbalance in Residential Distribution Networks

Residential electric vehicle (EV) chargers, as single phase loads, contribute to unbalanced voltage drops across phases, while rooftop solar systems, as single phase generators, can exacerbate voltage imbalance by causing unbalanced voltage increases. This paper investigates combined effects of residential EV charging and rooftop solar generation on voltage imbalance in residential distribution grids. The study examines these simultaneous impacts using the IEEE 8500-node test system, enhanced with a secondary network to realistically model the EV chargers and rooftop solar integration. To account for the variability and uncertainty in the EV charging loads and solar generation, a Monte Carlo approach is employed to capture and quantify the simultaneous impact of the EV charging and rooftop solar integration. In this approach, multiple influencing factors are considered, including state-of-charge (SOC), maximum charging power levels, and geographic distribution of chargers. The results provide practical insights for utilities and stakeholders, offering expectations for planning and operating strategies that effectively manage the increasing adoption of EVs and solar power while maintaining grid reliability.

Choi, Jongchan [ORNL] (ORCID:000000025952455X)↗

Communicating Risk to Program Managers

Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

Shivers, C. Herbert↗

The Value of Being a Trustworthy Repository

Today, NASA's Earth Observing System Data and Information System (EOSDIS), a system ofactive archives is attaching the CoreTrustSeal to its websites signifying that it merits theconfidence of its user community. But what value does being a trustworthy repository impart to auser? What does it mean to the owners and operators of repositories? What will it mean in thefuture? EOSDIS was started in the 1990s based on a framework of discipline-oriented, geographicallydistributed centers of expertise, named Distributed Active Archive Centers (DAACs). The functionof EOSDIS is to collect Earth Science data sensor measurements (principally those created andneeded by NASA) and manage the data and many derived digital products. EOSDIS providesmany services, including processing, curating, documenting, disseminating, and enabling datadiscovery as well as efficient use of the data. The EOSDIS has been operational over 25 years andmany lessons have been learned relative to the TRUST principles. During the tenure of EOSDIS,many changes have occurred as we have increased the size of the collection from gigabytes totens of petabytes and the distribution of the data to millions of users. We have had severalstages of system evolution that have improved EOSDIS in order to meet both stakeholder andcustomer expectations. This type of evolution is an on-going process to ensure that ourrepositories remain trustworthy. It is also important that our own community of data managersand system engineers add value in being trustworthy. This paper will discuss approaches to change within a large system of Earth Science data and services, while remaining a trustworthyrepository.

Behnke, Jeanne↗

Arc Jet Testing of 3D Mid-Density Carbon Phenolic (3MDCP) for Mars Sample Return

When accounting for the highest-heating trajectory with margin, dispersion, and greatest system mass, MSR-EES is predicted to experience the highest heat flux and pressure (approximately 3300 W/cm2 hot-wall, 200 kPa) of any earth entry vehicle todate. To verify performance requirements are met by the forebody TPS, the material must be tested to validate model predictions and give confidence to stakeholder’s expectation of performance. 3D Mid-Density Carbon Phenolic (3MDCP) is NASA’s baseline material for the forebody heatshield of the MSR-EES. As part of the arc jet campaign to evaluate material performance, recent testing has completed in the Interaction Heating Facility (IHF) using a new facility setting to achieve the necessary environments.

arcjet↗

Readiness Certification Assurance Process Tracking System

Without the use of an electronic system for managing activities to achieve and certify operational readiness, the effort to complete required elements of DOE Order 425.1 for large projects would be overwhelming. RCAPTS (Readiness Certification Assurance Process Tracking System) is a web-based software tool which helps manage Contractor or DOE Readiness Reviews. The RCA process and this software package is used at several DOE sites to plan, execute, and validate readiness of high-risk facilities and systems. The primary aim and value of RCAPTS is to promote accountability among project stakeholders, communicate expectations for the various elements of achieving operational readiness, and validate that requirements have been met, in a systematic way that flows with the project. At the end of a project, RCAPTS can provide an organized set of electronic evidence files for a follow-on readiness review team. The current software is recently updated to provide improved functionality, tailoring capability, and new user-friendly interface.

Cook, G. A.↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Technical Report on Quantifying Dependability Attributes of Software Based Safety Critical Instrumentation and Control Systems in Nuclear Power Plants

With the current transition from analog to digital instrumentation and control systems in nuclear power plants, the number and variety of software-based systems have significantly increased. The sophisticated nature and increasing complexity of software raises trust in these systems as a significant challenge. The trust placed in a software system is typically termed software dependability. Software dependability analysis faces uncommon challenges since software systems’ characteristics differ from those of hardware systems. The lack of systematic science-based methods for quantifying the dependability attributes in software-based instrumentation as well as control systems in safety critical applications has proved itself to be a significant inhibitor to the expanded use of modern digital technology in the nuclear industry. Dependability refers to the ability of a system to deliver a service that can be trusted. Dependability is commonly considered as a general concept that encompasses different attributes, e.g., reliability, safety, security, availability and maintainability. Dependability research has progressed significantly over the last few decades. For example, various assessment models and/or design approaches have been proposed for software reliability, software availability and software maintainability. Advances have also been made to integrate multiple dependability attributes, e.g., integrating security with other dependability attributes, measuring availability and maintainability, modeling reliability and availability, quantifying reliability and security, exploring the dependencies between security and safety and developing integrated analysis models. However, there is still a lack of understanding of the dependencies between various dependability attributes as a whole and of how such dependencies are formed. To address the need for quantification and give a more objective basis to the review process -- therefore reducing regulatory uncertainty -- measures and methods are needed to assess dependability attributes early on, as well as throughout the life-cycle process of software development. In this research, extensive expert opinion elicitation is used to identify the measures and methods for assessing software dependability. Semi-structured questionnaires were designed to elicit expert knowledge. A new notation system, Causal Mechanism Graphing, was developed to extract and represent such knowledge. The Causal Mechanism Graphs were merged, thus, obtaining the consensus knowledge shared by the domain experts. In this report, we focus on how software contributes to dependability. However, software dependability is not discussed separately from the context of systems or socio-technical systems. Specifically, this report focuses on software dependability, reliability, safety, security, availability, and maintainability. Our research was conducted in the sequence of stages found below. Each stage is further examined in its corresponding chapter. Stage 1 (Chapter 2): Elicitation of causal maps describing the dependencies between dependability attributes. These causal maps were constructed using expert opinion elicitation. This chapter describes the expert opinion elicitation process, the questionnaire design, the causal map construction method and the causal maps obtained. Stage 2 (Chapter 3): Elicitation of the causal map describing the occurrence of the event of interest for each dependability attribute. The causal mechanisms for the “event of interest” were extracted for each of the software dependability attributes. The “event of interest” for a dependability attribute is generally considered to be the “attribute failure”, e.g. security failure. The extraction was based on the analysis of expert elicitation results obtained in Stage 1. Stage 3 (Chapter 4): Identification of relevant measurements. Measures for the “events of interest” and their causal mechanisms were obtained from expert opinion elicitation for each of the software dependability attributes. The measures extracted are presented in this chapter. Stage 4 (Chapter 5): Assessment of the coverage of the causal maps via measures. Coverage was assessed to determine whether the measures obtained were sufficient to quantify software dependability, and what measures are further required. Stage 5 (Chapter 6): Identification of “missing” measures and measurement approaches for concepts not covered. New measures, for concepts that had not been covered sufficiently as determined in Stage 4, were identified using supplementary expert opinion elicitation as well as literature reviews. Stage 6 (Chapter 7): Building of a detailed quantification model based on the causal maps and measurements obtained. Ability to derive such a quantification model shows that the causal models and measurements derived from the previous stages (Stage 1 to Stage 5) can form the technical basis for developing dependability quantification models. Scope restrictions have led us to prioritize this demonstration effort. The demonstration was focused on a critical system, i.e. the reactor protection system. For this system, a ranking of the software dependability attributes by nuclear stakeholders was developed. As expected for this application, the stakeholder ranking identified safety as the most critical attribute to be quantified. A safety quantification model limited to the requirements phase of development was built. Two case studies were conducted for verification. A preliminary control gate for software safety for the requirements stage was proposed and applied to the first case study. The control gate allows a cost effective selection of the duration of the requirements phase.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Feasibility Study (FS) Alternative Development Process Challenges And Successes

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) in the mid 1950's under contract to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a five-story building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibit residual radiological activity remaining from the monazite sand processing. Waste materials from the processing operations (termed gangue) were disposed in the non-manufacturing portion of the facility, in the area referred to the Radioactive Waste Disposal Area (RWDA). Approximately 19,880 cubic meters (m{sup 3}) of radioactive gangue was buried within the RWDA. Waste was believed to be buried at various depths up to 2.7 meters (m), and possibly as deep as 7.6 m. The RI and a supplemental investigation have been completed for the RWDA and adjacent boundary areas. A Feasibility Study (FS) to address residual radioactivity in soils at the RWDA is in the process of being finalized. The chemical-specific Applicable, Relevant, and Appropriate Requirement (ARAR) was selected for the FUSRAP contaminants, and Remedial Goals (RGs) were calculated for the cleanup. The RGs were developed based upon guidance provided in the selected ARAR, 10 Code of Federal Regulations (CFR) 40, Appendix A, Criterion 6(6). This standard is designed to provide an acceptable level of protection to the average member of a critical group who may be exposed to radium in soil for a given scenario. Scenarios, critical group members, and RGs were established in consultation with stakeholders. Dose assessment calculations were performed in accordance with the ARAR to establish derived concentration guideline levels (DCGLs) for each radionuclide in the 232-Thorium ({sup 232}Th) and 238-Uranium ({sup 238}U) chain for both surface and subsurface soils. A sum of the ratios calculation (also called the unity rule) will be utilized (with the DCGLs) to assure compliance with the benchmark doses associated with the radium standards. Six alternatives (including no action) were considered in the FS and included the following technologies: soil washing, segregation, capping/covering, excavation/disposal, and site restrictions. A bench scale study was conducted by USACE to assess the efficacy of soil washing at the site. Results of the study showed reduction of radiological activity in soil. Segregation can be implemented using traditional sampling/analytical routines or automated (gate) segregation and it is likely to reduce the waste stream by at least 30%, while providing a more complete characterization of the soil with a particularly high level of confidence. Challenges for the FS phase of the project included: managing stakeholder input and expectations, defining separate and distinct alternatives for the FS in accordance with the CERCLA process, and selecting the most appropriate ARARs. The challenges were handled successfully, and USACE is finalizing a robust document acceptable to the stakeholders, which will allow USACE to meet the program milestone. In summary: Conducting the W.R. Grace FUSRAP site FUSRAP process has been challenging from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity; active processing building and disposal area) and incorporating site owner involvement in the process. Through the use of mediation and mutual commitment to the project by both parties, USACE and the site owner were able to find agreement on fundamental issues and set a firm foundation for achieving successful remedial action and site closure using a 'forward thinking' approach. Currently, USACE is finalizing the RWDA FS to address contamination in soils at the RWDA. ARARs have been identified and selected as per CERCLA guidance. Although obstacles were encountered, the challenges were handled successfully, and USACE is finalizing a robust document acceptable to the site owner, the regulators, and the public, which will allow USACE to move forward successfully in the FUSRAP program. (authors)

54 ENVIRONMENTAL SCIENCES↗

Comparison of Deterministic and Statistical Models for Water Quality Compliance Forecasting in the San Joaquin River Basin, California

Model selection for water quality forecasting depends on many factors including analyst expertise and cost, stakeholder involvement and expected performance. Water quality forecasting in arid river basins is especially challenging given the importance of protecting beneficial uses in these environments and the livelihood of agricultural communities. In the agriculture-dominated San Joaquin River Basin of California, real-time salinity management (RTSM) is a state-sanctioned program that helps to maximize allowable salt export while protecting existing basin beneficial uses of water supply. The RTSM strategy supplants the federal total maximum daily load (TMDL) approach that could impose fines associated with exceedances of monthly and annual salt load allocations of up to $1 million per year based on average year hydrology and salt load export limits. The essential components of the current program include the establishment of telemetered sensor networks, a web-based information system for sharing data, a basin-scale salt load assimilative capacity forecasting model and institutional entities tasked with performing weekly forecasts of river salt assimilative capacity and scheduling west-side drainage export of salt loads. Web-based information portals have been developed to share model input data and salt assimilative capacity forecasts together with increasing stakeholder awareness and involvement in water quality resource management activities in the river basin. Two modeling approaches have been developed simultaneously. The first relies on a statistical analysis of the relationship between flow and salt concentration at three compliance monitoring sites and the use of these regression relationships for forecasting. The second salt load forecasting approach is a customized application of the Watershed Analysis Risk Management Framework (WARMF), a watershed water quality simulation model that has been configured to estimate daily river salt assimilative capacity and to provide decision support for real-time salinity management at the watershed level. Analysis of the results from both model-based forecasting approaches over a period of five years shows that the regression-based forecasting model, run daily Monday to Friday each week, provided marginally better performance. However, the regression-based forecasting model assumes the same general relationship between flow and salinity which breaks down during extreme weather events such as droughts when water allocation cutbacks among stakeholders are not evenly distributed across the basin. A recent test case shows the utility of both models in dealing with an exceedance event at one compliance monitoring site recently introduced in 2020.

54 ENVIRONMENTAL SCIENCES↗

Remote Attenuation System: Target Diagnostics

This document describes the systems engineering process and results performed for the Remote Attenuation System (RAS) to be implemented on the target diagnostics of the National Ignition Facility at the Lawrence Livermore National Laboratory. The mission of operational cost reduction is discussed in Section 2, along with the identification of stakeholders and their expectations of what the new system be. In Section 3, we identify the existing reference system, that which needs to be replaced or upgraded. Also defined is the boundary of the new system to be designed. Section 4 highlights the key system drivers and constraints, and Section 5 details a number of operational scenarios and use cases that will be used to inform system requirements. In Section 6, we present a Quality Function Deployment matrix that then drives a number of implementation concepts. A trade study is used to identify the concept that best meets expectations and constraints. In Section 7, we propose a system architecture and define requirements. We further evaluate the market for off-the-shelf solutions that fit our proposed system architecture. In Sections 8 and 9, we present the proposed systems impact or our organization and perform a risk assessment.

42 ENGINEERING↗