Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “spallation neutron source”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

Mitigating Cathode Overcurrent Faults at the Spallation Neutron Source

The high-power klystron amplifiers at the Spallation Neutron Source (SNS) have been in operation for over 100,000 hours. Overcurrent faults from the klystron cathodes comprise the bulk of RF System downtime. Reliable operation is of particular interest to the SNS, and data from over a decade of operation is used to help mitigate repetitive overcurrent conditions.

Moss, John↗

Assessment of simulated and observed cavitation-induced erosion damage in Spallation Neutron Source target vessels

Cavitation-induced erosion damage in different Spallation Neutron Source (SNS) target designs are simulated using explicit finite element–based techniques and compared with observations of erosion in targets after operation. The efficacy of the previously developed method, called saturation time, was evaluated using erosion-damaged samples from new target designs. A new metric called maximum bubble size was implemented under the rationale that larger cavitation bubbles will collapse more intensely. The maximum cavitation bubble size over 1 ms of simulated time was calculated based on the Rayleigh–Plesset equation for each element integration point and presented as a contour map at the vessel surface for assessing with erosion observations. SNS targets are now operated with helium gas injection to reduce cavitation damage. A simulation method using a material model for the mixture of mercury and gas bubbles was recently developed and used to account for the effect of small gas bubbles on the structural response of the target vessel. Furthermore, this work compares the new method's results with observed cavitation damage. Maps of the calculated maximum bubble size for targets operated with and without gas injection were compared with photographs of erosion damage observed in SNS targets. The patterns in maximum bubble size maps correlated well with observations of erosion patterns in target vessels after service. Advantages and challenges of the maximum bubble size simulation technique are provided, and differences between results from the previous and the newly proposed metric are discussed.

Jiang, Hao↗

Spallation Neutron Source Hydrogen Relief Analysis for the Cryogenic Moderator System

The Spallation Neutron Source at Oak Ridge National Laboratory operates the Cryogenic Moderator System (CMS) which provides hydrogen cooling at 20K to three neutron moderators. Each hydrogen loop is protected by multiple burst discs and reclosing relief valves. As a result of the Proton Power Upgrade project, the CMS moderator loops will hold more hydrogen and thus require piping modifications. Operational experience has demonstrated that transient pressure increases in these hydrogen loops occasionally result in the rupture of the burst discs. The causes for pressure transients in the system that might lead to hydrogen venting are varied and complex, for example loss of vacuum or cooling. Dynamic simulation and analysis of the parameters considered as the worst-case relief venting scenario were performed and will be presented.

47 OTHER INSTRUMENTATION↗

Cavitation-induced erosion in liquid metal spallation targets – A comparison between a predictive method and measured erosion damage to stainless steel target modules at the Spallation Neutron Source

Neutrons are produced for neutron scattering instruments at the Spallation Neutron Source by bombarding liquid mercury with a pulsed high-energy proton beam. The liquid mercury target material flows through a replaceable stainless-steel target vessel and cavitates during operation due to the extremely high heating rate caused by each proton pulse. Cavitation-induced erosion damage to the mercury-facing surfaces of target vessels is a key concern for target lifetime and has been the subject of considerable research. While numerous experiments have studied and modeled the progression of cavitation erosion damage to liquid metal target containers, direct quantitative measurements of actual erosion of a spallation target vessel were previously not available. Recently, the erosion damage to multiple target vessels operated at the Spallation Neutron Source was measured using a high-resolution laser scanning system, which provided an opportunity to study the efficacy of a cavitation damage progression model. In this paper, a cavitation progression modeling procedure developed using empirical observations is compared to measurements of samples from target vessels after operation. We discuss the strengths and limitations of the technique and propose methods for improving future modeling and predictive accuracy.

36 MATERIALS SCIENCE↗

Design and structural assessment of the Spallation Neutron Source 2.0 MW target

The Proton Power Upgrade (PPU) project is underway at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory. The project will double the proton accelerator power from 1.4 MW to 2.8 MW, increase power to the First Target Station (FTS), and enable a future Second Target Station (STS). The power increase partly comes from raising proton energy from 1.0 GeV to 1.3 GeV. The STS will operate at 0.7 MW at 15 Hz when completed. Until then, PPU will provide the capability to operate the FTS at 2.0 MW at 60 Hz. Maximum power at the FTS to date has been 1.4 MW at 60 Hz with 1.0 GeV protons. A new mercury target module design to operate reliably under PPU conditions has been completed after a multi-year effort. The design philosophy and assessment of the structural analysis are described here. This target underwent an unprecedented design and analysis process for SNS using the latest engineering techniques and incorporating years of operating lessons and outcomes from R&D to meet structural design criteria. Finally, it also incorporates high-flow gas injection to further mitigate pulse fatigue stresses as well as cavitation damage to the mercury vessel.

47 OTHER INSTRUMENTATION↗

Physics Opportunities in the ORNL Spallation Neutron Source Second Target Station Era

The Oak Ridge National Laboratory (ORNL) Spallation Neutron Source (SNS) First Target Station (FTS), used by the COHERENT experiment, provides an intense and extremely high-quality source of pulsed stopped-pion neutrinos, with energies up to about 50 MeV. Upgrades to the SNS are planned, including a Second Target Station (STS), which will approximately double the expected neutrino flux while maintaining quality similar to the FTS source. Furthermore, additional space for ten-tonne scale detectors may be available. We describe here exciting opportunities for neutrino physics, other particle and nuclear physics, and detector development using the FTS and STS neutrino sources.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Residual Dose Rates Analyses from Vent Lines Shield Block on the Target Cart at Spallation Neutron Source

The target carriage supports the mercury target vessel in the Spallation Neutron Source (SNS) in a cantilevered fashion and supplies the liquid mercury flowing to and from the target vessel. The target carriage is designed to move the target vessel into its target monolith position to receive the proton beam and then remove it horizontally back into an adjacent service cell, where the target vessel can be exchanged about 2-3 times per calendar year. At the time of the performed studies, the SNS mercury target can accept a proton beam at 1 GeV energy and 1.4 MW power; however, it will be upgraded to receive 1.3 GeV energy at 2 MW by the end of 2024 year [1]. The cart is practically a shield block on wheels to minimize fluxes and dose rates in the service cell downstream of the carriage. There are vent lines located inside a passage on top of the target carriage, and they are covered by a stepping-up steel shield block (vent lines shield block). Vent lines are permanently attached to the shield block. New vent lines with a different design are going to be installed. These lines are shielded by the new steel block to which the vent lines are attached. The estimate of the residual dose rates from the block after it is extracted from the target carriage is performed to estimate the radiation fields and to decide on the type of storage container to be used.

Popova, Irina I↗

Status of the Spallation Neutron Source beam test facility and progress of beam dynamics studies

The Spallation Neutron Source (SNS) Beam Test Facility (BTF) supports the study of beam dynamics in the front end of a high power LINAC. The BTF combines a replica of the SNS front end, including nearly-identical ion source, RFQ and MEBT, with extensive phase space diagnostics and a FODO transport line. Diagnostic capabilities include direct measurement of 6D phase space distribution and detection of halo distributions to a sensitivity of greater than one part-per-million. The goal of on-going BTF studies is to demonstrate accurate particle-in-cell modeling of halo growth and evolution by leveraging unprecedented accuracy in the description of the initial beam distribution. This work is motivated by operational experience at the SNS, which currently operates with beam loss that cannot be described by any model. This paper summarizes progress in the BTF beam study program as well as diagnostics development and recent upgrades to the beamline configuration.

Ruisard, Kiersten↗

EXPANSE: A time-of-flight EXPanded Angle Neutron Spin Echo spectrometer at the Second Target Station of the Spallation Neutron Source

EXPANSE, an EXPanded Angle Neutron Spin Echo instrument, has been proposed and selected as one of the first suite of instruments to be built at the Second Target Station of the Spallation Neutron Source at the Oak Ridge National Laboratory. This instrument is designed to address scientific problems that involve high-energy resolution (neV– μeV) of dynamic processes in a wide range of materials. The wide-angle detector banks of EXPANSE provide coverage of nearly two orders of magnitude in scattering wavenumbers, and the wide wavelength band affords approximately four orders of magnitude in Fourier times. This instrument will offer unique capabilities that are not available in the currently existing neutron scattering instruments in the United States. Specifically, EXPANSE will enable direct measurements of slow dynamics in the time domain over wide Q-ranges simultaneously and will also enable time-resolved spectroscopic studies. The instrument is expected to contribute to a diverse range of science areas, including soft matter, polymers, biological materials, liquids and glasses, energy materials, unconventional magnets, and quantum materials.

47 OTHER INSTRUMENTATION↗

SEEMS: A Single Event Effects and Muon Spectroscopy facility at the Spallation Neutron Source

This study outlines a concept that would leverage the existing proton accelerator at the Spallation Neutron Source (SNS) of Oak Ridge National Laboratory to enable transformative science via one world-class facility serving two missions: Single Event Effects (SEE) and Muon Spectroscopy (μSR). The μSR portion would deliver the world’s highest flux and highest resolution pulsed muon beams for material characterization purposes, with precision and capabilities well beyond comparable facilities. The SEE capabilities deliver neutron, proton, and muon beams for aerospace industries that are facing an impending challenge to certify equipment for safe and reliable behavior under bombardment from atmospheric radiation originating from cosmic and solar rays. With negligible impact on the primary neutron scattering mission of the SNS, the proposed facility will have enormous benefits for both science and industry. Herein, we have designated this facility “SEEMS.”

47 OTHER INSTRUMENTATION↗

Operating Klystrons at the Spallation Neutron Source – Two Decades of Perspective

Klystron amplifiers have been operated at the Spallation Neutron Source (SNS) in support of the user program since 2006. SNS tubes have amassed over 100,000 hours of high-voltage and filament-on time providing a significant source of operational statistics for high power, high-duty klystrons. Additionally, the SNS Radiofrequency (RF) Systems Group has developed operational methods to mitigate specific reliability challenges, such as cathode arcing and output power instability. Despite much progress, many of these challenges persist, prompting the SNS to update the procedures used for klystron processing as well as develop a higher throughput test stand.

Moss, John [ORNL] (ORCID:0009000085988916)↗

Analyses of Dose Rates for Second Inner Reflector Plug Replacement at Spallation Neutron Source

The Inner Reflector Plug (IRP) is a central component of the Spallation Neutron Source (SNS) target monolith, which houses the liquid mercury target and four liter-sized neutron moderator units. It is exposed to high-level radiation fields during routine operation and builds up significant activity. The IRP needs to be replaced due to moderator neutron poison and decoupler burn-out, which is used for shaping neutron pulses. The first IRP exchange took place in March 2018 and next one, which is IRP2, is planned to be replaced during the facility maintenance period in the end of December 2025, beginning of January 2026 calendar year. The replacement of IRP is a complex task due to its location in the area receiving high irradiation, being under significant amount of shielding, and size, which requires removal in segments. For planning the replacement workflow to help to reduce radiation exposure to workers dose rates for each stage of extraction/replacement operation are predicted.

42 ENGINEERING↗

Quantification and evaluation of strain reduction from small-bubble gas injection in Spallation Neutron Source target vessels

Small-bubble gas injection has been routinely utilized in the operation of Spallation Neutron Source (SNS) mercury targets since 2017 to mitigate cavitation-induced erosion damage to target vessels. Strain measurements of target vessels collected in-situ during initial operation with gas injection were used to study the gas injection effect on the structural response of targets to proton pulses. A significant strain reduction owing to gas injection was found by comparing the strain measurement data during operation with and without gas injection. The research presented here focuses on quantifying strain reductions in SNS targets and evaluating the effect of small-bubble gas injection by comparing different bubbler types and target designs. The strain measurement results show the gas injection significantly reduced strain in SNS target vessels; strain values decreased by 30% to 80% for targets operating with gas injection. Stress and strain responses of SNS targets were simulated to numerically evaluate the gas injection effect. Based on the predicted stresses with and without gas injection, the fatigue lifetimes of SNS jet-flow design target were estimated using fe-safe fatigue analysis software. The simulations show these reductions should improve the fatigue life of target vessels and allow SNS targets to meet their fatigue design goal.

Fatigue life estimation↗

Thermal loading analysis of the ring injection dump for the Spallation Neutron Source facility

The ring injection dump (RID) is the largest beam dump in the Spallation Neutron Source facility at Oak Ridge National Laboratory and accepts a fraction of the beam from the ring that is not captured in the ring during injection. Thermo-fluid modeling of the RID components was performed during the initial design by using the software ANSYS CFX to characterize the power rating for the RID. From the calculations, the power rating was lowered from 200 kW to 150 kW, at 1.3 GeV beam energy due to concerns regarding the heating of the concrete structure. The Proton Power Upgrade project scope included reevaluating the power limit to the RID in anticipation that increasing it would provide more operational flexibility. The focus was on the shielding because it was the limiting factor, and data collected from thermocouples installed on the structure were used to benchmark the analysis. A three-stage process was adopted in the latest study. First, the already existing steady-state calculations were validated and extended with the latest Monte Carlo N-Particle source term calculations. Second, transient calculations were conducted to capture the dynamic state of the system in response to the energy dumped to the RID during the following operational period of the beam from 2005–2019 (14 years), and sensitivity analyses of crucial parameters were performed to benchmark the model with reasonable accuracy. Finally, an idealized transient cycle analysis was conducted with realistic duty factors to predict the temperature distribution at higher beam powers. Overall, the results confirmed the accuracy of the original steady state model but allowed the development of a new validated transient model with higher accuracy for future analyses.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

New machine protection system at the Spallation Neutron Source – design process and performance analysis

A New Machine Protection System (MPS) at the Spallation Neutron Source (SNS) was developed and implemented on µTCA-based hardware platforms. The system monitors more than 2500 field inputs and shuts off the beam within 10 µs if adverse events occur. We will present system level design process of various firmware and software components as well as the system integration into EPICS environment. The performance analysis of the MPS after two SNS run cycles will also be presented.

Bobrek, Miljko [ORNL] (ORCID:0000000332763451)↗

CENTAUR - The small- and wide-angle neutron scattering diffractometer/spectrometer for the Second Target Station of the Spallation Neutron Source

CENTAUR has been selected as one of the eight initial instruments to be built at the Second Target Station (STS) of the Spallation Neutron Source at Oak Ridge National Laboratory. It is a small-angle neutron scattering (SANS) and wide-angle neutron scattering (WANS) instrument with diffraction and spectroscopic capabilities. This instrument will maximally leverage the high brightness of the STS source, the state-of-the-art neutron optics, and a suite of detectors to deliver unprecedented capabilities that enable measurements over a wide range of length scales with excellent resolution, measurements on smaller samples, and time-resolved investigations of evolving structures. Notably, the simultaneous WANS and diffraction capability will be unique among neutron scattering instruments in the United States. This instrument will provide much needed capabilities for soft matter and polymer sciences, geology, biology, quantum condensed matter, and other materials sciences that need in situ and operando experiments for kinetic and/or out-of-equilibrium studies. Beam polarization and a high-resolution chopper will enable detailed structural and dynamical investigations of magnetic and quantum materials. CENTAUR’s excellent resolution makes it ideal for low-angle diffraction studies of highly ordered large-scale structures, such as skyrmions, shear-induced ordering in colloids, and biomembranes. Additionally, the spectroscopic mode of this instrument extends to lower momentum transfers than are currently possible with existing spectrometers, thereby providing a unique capability for inelastic SANS studies.

47 OTHER INSTRUMENTATION↗

Proton pulse charge calculation algorithm in Beam Power Limiting System at Spallation Neutron Source

A proton pulse charge calculation algorithm in the Beam Power Limiting System (BPLS) at the Spallation Neutron Source (SNS) was developed and implemented in an FPGA. The algorithm calculates one-minute running average of the pulse charges and issues a fault to the Personal Protection System (PPS) and the Machine Protection System (MPS) when a limit is reached. A bit-accurate model of the algorithm was first developed and tested in Matlab® and then implemented and simulated in VHDL using Vivado® design environment. Finally, the algorithm was verified on a µTCA-based hardware platform.

Bobrek, Miljko [ORNL] (ORCID:0000000332763451)↗