Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “solar permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Enhancing Charge Injection in Polyoxometalate-based Dye-Sensitized Solar Cells

A series of 3d-transition metal containing polyoxometalates have been synthesized. These materials were successfully characterized using a variety of spectroscopic and electrochemical techniques. A selected polyoxometalate was sensitized with a porphyrin-based dye to permit for more efficient solar spectrum utilization.

14 SOLAR ENERGY↗

Cully Community Solar

This report summarizes the outcomes, accomplishments, challenges, and lessons learned from Verde’s Cully Community Solar project, funded by the U.S. Department of Energy’s Solar Energy Technologies Office. The project focused on advancing community solar development through engineering, permitting, interconnection, ecological site design, workforce development, and community engagement. During the project period, Verde and its partners successfully developed and commissioned a 1.25 MW ground-mounted community solar system while also advancing planning for additional community solar capacity and developing approaches that can inform future projects in complex urban environments.

14 SOLAR ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

13 HYDRO ENERGY↗

NREL Tools Webinar Series: Session 1 - Overview

Webinar with NARC/Solsmart to showcase NREL tools related to energy with local governments interested in Solsmart designation. NREL staff will present on SAM, PV Watts, REopt, Procurement Analysis Tool, Slope, SolarAPP+, and SolarTRACE.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Laws in Order: An Inventory of State Renewable Energy Siting Policies

This report identifies which government entity or entities in each state or territory have the jurisdictional authority to make siting and permitting decisions about large scale wind and solar projects. The report also covers established timelines for siting and permitting processes, requirements for public involvement in those processes, and the availability of permitting guides and model ordinances designed to assist local jurisdictions. It details state renewable energy siting policies and permitting authorities across the United States, profiling all 50 states plus Puerto Rico. The report release also includes an interactive map that allows users to easily explore each state’s authorities and policy features. The map, hosted by DOE, includes high-level information on each state’s siting and permitting processes and link directly to the profiles in the report.

14 SOLAR ENERGY↗

Solar PV Water Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from bodies of water based on county ordinances as of April 2022. A setback requirement is a minimum distance from water that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a default setback of 30 meters was applied in counties without specific water setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Transmission Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from transmission. A setback requirement is a minimum distance from transmission infrastructure that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a 30-meter setback, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Structure Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from structures based on county ordinances as of April 2022. A setback requirement is a minimum distance from a structure that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a default setback of 61 meters was applied in counties without specific structure setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Road Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from roads based on county ordinances as of April 2022. A setback requirement is a minimum distance from a road that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a default setback of 30 meters was applied in counties without specific road setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Railroad Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from railroads. A setback requirement is a minimum distance from a railroad that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a 30-meter setback, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Oil and Gas Pipeline Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from oil and gas pipelines. A setback requirement is a minimum distance from a pipeline that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a 30-meter setback, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

DE‐SC0022708 RESEARCH PERFORMANCE FINAL REPORT

GismoPower’s Final Research Report documents the outcomes of a DOE SBIR Phase II project focused on advancing the MEGA® (Mobile Electricity Generating Appliance), a trailerable, plug-in solar canopy appliance designed to deliver appliance-class electricity generation for homes, small businesses and renters. The project’s core objective was to remove the technical and regulatory barriers that have historically prevented plug-in solar systems from being safely certified, permitted, and interconnected in the United States.

14 SOLAR ENERGY↗

Survey of Utility-Scale Wind and Solar Developers Report [Slides]

In 2023, Berkeley Lab conducted the first of its kind survey of industry professionals with direct experience working in community engagement and permitting of land-based, utility-scale wind and solar energy facilities in the U.S. The survey solicited information about project timelines over the last five years, leading causes of project delays and cancelations, community opposition, experience with permitting authorities, community engagement, comparisons between wind and solar, and other related topics. A total of 123 individuals responded to the survey for a response rate of 19.2%. Respondents were employed at 62 unique companies, which together are responsible for approximately half of the wind and solar developed from 2016 to 2023.

14 SOLAR ENERGY↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Measuring and modeling soil moisture and runoff at solar farms using a disconnected impervious surface approach

Abstract Ground‐mounted photovoltaic sites are often treated as impervious surfaces in stormwater permits. This ignores the pervious soils beneath and between solar arrays and leads to an overestimation of runoff. Our objective was to improve solar farm stormwater hydrology models by explicitly considering the disconnected impervious nature of solar design and site characteristics. Experimental sites established on utility scale solar farms in Colorado, Georgia, Minnesota, New York, and Oregon had perennial vegetative plantings with mean precipitation ranging from 40.6 to 124.5 cm, and soil texture ranging from loamy sand to clay. Soil moisture measurements were collected beneath arrays, under drip edges, and in the vegetated area between arrays at each site. Hydrus‐3D models for soil moisture and stormwater hydrology were developed that accounted for precipitation falling on solar panels, drip edge redistribution of rainfall, infiltration, and runoff in the pervious areas between solar arrays and beneath panels. Drip edge runoff averaged 3‐ to 10‐times incident precipitation at the New York and Minnesota sites, respectively. Root mean square error values between measured sub‐hourly soil moisture and predicted moisture for large measured single storm events averaged 0.029 across all five sites. Predicted runoff depths were strongly affected by precipitation depth, soil texture, soil profile depth, and soil bulk density. Runoff depths across the five experimental sites averaged 13%, 25%, and 45% of the 2‐, 10‐, and 100‐year design storm depths, clearly showing that these solar farms do not behave like impervious surfaces, but rather as disconnected impervious surfaces with substantial infiltration of runoff in the vegetated areas between and beneath solar arrays.

Agriculture↗

Residential Solar Adoption Timelines and Impacts from the COVID-19 Pandemic

In this study we evaluate PII and other PV adoption timelines from 2017-2021. We use project-level data collected by the National Renewable Energy Laboratory (NREL) for the Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE). Additionally, we conducted a survey of 171 AHJs about their experiences, challenges, and process changes during the first 18 months of the COVID-19 pandemic. The survey findings were supplemented with follow up interviews with 5 AHJs from 4 states. We find that the pandemic moderately increased the duration and variability of pre-install timelines (contract signing to install), particularly in the permit review phase (permit submit to approval). In contrast, post-install timelines (install to final utility interconnection) continued to decline during the pandemic. The net result is that overall project timelines (contract signing to final interconnection) continued to decline during the pandemic. Our findings suggest that AHJs and installers faced challenges throughout the pandemic but ongoing improvements in PII processes - particularly post-install processes - more than offset these challenges. Furthermore, the pandemic may have catalyzed or accelerated a widespread adoption of online/electronic permitting, among other process efficiency improvements.

14 SOLAR ENERGY↗

Solar@Scale: Improving the Local Rules of the Game for Large Scale Solar

This final report summarizes the Solar@Scale Project including project goals, milestones, tasks and deliverables. Solar@Scale, led by ICMA in partnership with the American Planning Association, took place from 2020-2025. The initiative addressed large-scale solar soft costs by developing tools and resources related to planning, siting, permitting and inspection in support of local governments, special districts, and other authorities that have jurisdiction over large-scale solar projects.

14 SOLAR ENERGY↗