Engineering PapersSearch

SEARCH · Engineering Papers

Results for “site evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Mining for helium: Site selection and evaluation

Part of the University of Wisconsin study of the feasibility of recovering He-3 from the moon is selection and evaluation of potential mining sites. Selection and evaluation are based primarily on salient findings by investigators: (1) Regoliths from areas underlain by highland materials contain less than 20 wppm He; (2) Regoliths of certain maria or parts of maria also contain less than 20 wppm He, but mare regoliths at the Apollo 11 and 17 sites contain 25 to 49 wppm He; (3) The helium content of a regolith is a function of its composition; and (4) Helium is concentrated in the -50 micron size fractions of regoliths. In site selection, the concern is with the compositions of lunar regoliths, in particular with their titanium contents. It is widely accepted that compositions of mare regoliths are controlled by the nature of the underlying basalts from which the regoliths are largely derived. The distribution and extent of the three groups of basalts and the regoliths derived from them are the first basis for site selection and evaluation. Other considerations are briefly discussed.

Cameron, Eugene N.

Satellite range delay simulator for a matrix-switched time division multiple-access network simulator

The Systems Integration, Test, and Evaluation (SITE) facility at NASA Lewis Research Center is presently configured as a satellite-switched time division multiple access (SS-TDMA) network simulator. The purpose of SITE is to demonstrate and evaluate advanced communication satellite technologies, presently embodied by POC components developed under NASA contracts in addition to other hardware, such as ground terminals, designed and built in-house at NASA Lewis. Each ground terminal in a satellite communications system will experience a different aspect of the satellite's motion due mainly to daily tidal effects and station keeping, hence a different duration and rate of variation in the range delay. As a result of this and other effects such as local oscillator instability, each ground terminal must constantly adjust its transmit burst timing so that data bursts from separate ground terminals arrive at the satellite in their assigned time slots, preventing overlap and keeping the system in synchronism. On the receiving end, ground terminals must synchronize their local clocks using reference transmissions received through the satellite link. A feature of the SITE facility is its capability to simulate the varying propagation delays and associated Doppler frequency shifts that the ground terminals in the network have to cope with. Delay is achieved by means of two NASA Lewis designed and built range delay simulator (RDS) systems, each independently controlled locally with front panel switches or remotely by an experiment control and monitor (EC/M) computer.

Nagy, Lawrence A.

Satellite range delay simulator for a matrix-switched time division multiple-access network simulation system

The Systems Integration, Test, and Evaluation (SITE) facility at NASA Lewis Research Center is presently configured as a satellite-switched time division multiple access (SS-TDMA) network simulator. The purpose of SITE is to demonstrate and evaluate advanced communication satellite technologies, presently embodied by POC components developed under NASA contracts in addition to other hardware, such as ground terminals, designed and built in-house at NASA Lewis. Each ground terminal in a satellite communications system will experience a different aspect of the satellite's motion due mainly to daily tidal effects and station keeping, hence a different duration and rate of variation in the range delay. As a result of this and other effects such as local oscillator instability, each ground terminal must constantly adjust its transmit burst timing so that data bursts from separate ground terminals arrive at the satellite in their assigned time slots, preventing overlap and keeping the system in synchronism. On the receiving end, ground terminals must synchronize their local clocks using reference transmissions received through the satellite link. A feature of the SITE facility is its capability to simulate the varying propagation delays and associated Doppler frequency shifts that the ground terminals in the network have to cope with. Delay is ahcieved by means of two NASA Lewis designed and built range delay simulator (RDS) systems, each independently controlled locally with front panel switches or remotely by an experiment control and monitor (EC/M) computer.

Nagy, Lawrence A.

ESRI applications of GIS technology: Mineral resource development

The application of geographic information systems technology to large scale regional assessment related to mineral resource development, identifying candidate sites for related industry, and evaluating sites for waste disposal is discussed. Efforts to develop data bases were conducted at scales ranging from 1:3,000,000 to 1:25,000. In several instances, broad screening was conducted for large areas at a very general scale with more detailed studies subsequently undertaken in promising areas windowed out of the generalized data base. Increasingly, the systems which are developed are structured as the spatial framework for the long-term collection, storage, referencing, and retrieval of vast amounts of data about large regions. Typically, the reconnaissance data base for a large region is structured at 1:250,000 scale, data bases for smaller areas being structured at 1:25,000, 1:50,000 or 1:63,360. An integrated data base for the coterminous US was implemented at a scale of 1:3,000,000 for two separate efforts.

Derrenbacher, W.

Evaluation of components, subsystems, and networks for high rate, high frequency space communications

The development of new space communications technologies by NASA has included both commercial applications and space science requirements. NASA's Systems Integration, Test and Evaluation (SITE) Space Communication System Simulator is a hardware based laboratory simulator for evaluating space communications technologies at the component, subsystem, system, and network level, geared toward high frequency, high data rate systems. The SITE facility is well-suited for evaluation of the new technologies required for the Space Exploration Initiative (SEI) and advanced commercial systems. Described here are the technology developments and evaluation requirements for current and planned commercial and space science programs. Also examined are the capabilities of SITE, the past, present and planned future configurations of the SITE facility, and applications of SITE to evaluation of SEI technology.

Kerczewski, Robert J.

Evaluation of components, subsystems, and networks for high rate, high frequency space communications

The development of new space communications technologies by NASA has included both commercial applications and space science requirements. At NASA's Lewis Research Center, methods and facilities have been developed for evaluating these new technologies in the laboratory. NASA's Systems Integration, Test and Evaluation (SITE) Space Communication System Simulator is a hardware-based laboratory simulator for evaluating space communications technologies at the component, subsystem, system, and network level, geared toward high frequency, high data rate systems. The SITE facility is well-suited for evaluation of the new technologies required for the Space Exploration Initiative (SEI) and advanced commercial systems. This paper describes the technology developments and evaluation requirements for current and planned commercial and space science programs. Also examined are the capabilities of SITE, the past, present, and planned future configurations of the SITE facility, and applications of SITE to evaluation of SEI technology.

Kerczewski, Robert J.

Lunar resource evaluation and mine site selection

Two scenarios in this evaluation of lunar mineral resources and the selection of possible mining and processing sites are considered. The first scenario assumes that no new surface or near-surface data will be available before site selection (presumably one of the Apollo sites). The second scenario assumes that additional surface geology data will have been obtained by a lunar orbiter mission, an unmanned sample return mission (or missions), and followup manned missions. Regardless of the scenario, once a potentially favorable mine site has been identified, a minimum amount of fundamental data is needed to assess the resources at that site and to evaluate its suitability for mining and downstream processing. Since much of the required data depends on the target mineral(s), information on the resource, its beneficiation, and the refining, smelting, and fabricating processes must be factored into the evaluation. The annual capacity and producing lifetime of the mine and its associated processing plant must be estimated before the resource reserves can be assessed. The available market for the product largely determines the capacity and lifetime of the mine. The Apollo 17 site is described as a possible mining site. The use of new sites is briefly addressed.

Bence, A. Edward

Qualitative Risk Assessment of Legacy Wells within the Estimated Prairie State Generating Company Area of Review

This report details the digitization of a legacy wellbore database, including data processing assumptions, parameter estimation, and risk assessment methodology. The database, comprising 6,454 documents, was provided by ISGS. It includes valuable data from the Prairie State Generating Company (PSGC) and One Earth Energy (OEE) sites of the CarbonSAFE Phase III – Illinois Storage Corridor project. The report focuses on wells within a 15-mile radius from the Lively Grove #1 (LG#1) well at PSGC site, evaluating subsurface conditions and potential risks. A total of 4,386 wellbores within 15 miles of the LG#1 well were filtered based on depth and formation codes. LG#1 is the stratigraphic well at the PSGC site drilled in 2021. Ninety-four (94) wells penetrating the Maquoketa Shale Group (the primary confining unit) within the estimated area-of-review (AoR) for the PSGC site were evaluated using a qualitative risk assessment (QRA) methodology. The QRA developed by Arbad et al. 2022 focuses on legacy wells within the AoR and categorizes them based on well construction details. The QRA identifies wells that need immediate attention by categorizing them based on penetration depth and protection. Wells within the AoR were categorized into nine groups based on penetrations and protections. These categories range from Type 1 wells, with no documentation, to Type 9 wells, which do not penetrate the primary confining unit or storage reservoir (unit). Well accessibility within the AoR varies based on well status, including Dry & Abandoned (DA), Plugged & Abandoned (PA), Injection (INJ), Oil/Gas Producing (PROD), and Observation (Obs) wells. Accessibility levels were determined by well construction, with DA wells being the least accessible and Observation wells the most accessible, impacting gas leakage detection possibilities. Remedial action priority of wells decreases from Type 1 to Type 9 wells. Type 1 to Type 6 wells with status DA and PA require immediate attention, while Type 7 and Type 8 wells are low priority. A risk matrix used to prioritize corrective actions for legacy wells is proposed to categorize wells within an AoR based on penetrations, protections, and accessibility. The methodology involves data acquisition, well categorization into nine types, and determining CO 2 leakage pathways using well schematics and geospatial mapping. This approach is particularly useful for managing the integrity of legacy wells throughout the lifecycle of a Carbon Capture and Storage (CCS) project. A qualitative risk assessment of 94 wells within the AoR of the PSGC site identified 54 wells with high priority for corrective action due to penetration of the primary containment seal. The assessment utilizes color-coded maps to categorize well types and prioritize corrective actions, providing a comprehensive analysis. Schematics of wells penetrating the primary confining unit were drawn, and leakage pathways were identified. Details of all wells penetrating the confining zone are provided in the appendix, including information on well types, plugging, and casing status.

01 COAL, LIGNITE, AND PEAT

On-board switching and processing

Findings from NASA's space electronics division's (SED's) advanced systems studies related to future communications satellite services that will require onboard switching and processing technology are reviewed. SED's digital signal switching and processing technology program is reviewed. This program responds to specific systems technology development needs for enabling commercial development of future satellite services. The technologies include: modulators, demodulators, and forward error-correction hardware for space- and ground-based applications; onboard information switching and processing, onboard network control, and health monitoring; and cost-efficient ground terminals. The in-house systems integration, test, and evaluation (SITE) project, which includes a laboratory testbed for evaluating technology in a simulated systems environment, is reviewed.

Harrold, Joseph L.

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY

Performance measurements for a laboratory-simulated 30/20 GHz communication satellite transponder

NASA has developed a digital satellite communications system simulator and test bed facility, known as the Systems Integration, Test and Evaluation (SITE) Project. The purpose of the facility is to evaluate satellite system components, develop and verify system concepts, and perform satellite system experiments. A recently completed set of experiments measured the performance of the 30/20 GHz satellite transponder portion of the system in terms of RF parameters and high rate digital data transmission. The results of these tests indicate the quality of data transmission which can be obtained under various transponder conditions, as well as the relative effects of degraded RF performance on the bit-error rate (BER) of transmitted data.

Kerczewski, Robert J.

Continuous cost movement models

Use of current space imaging systems and airborne platforms has direct use in survey design and site location when used in concert with a comprehensive GIS environment. Local conditions and site physical and chemical properties are key factors in successful applications. Conjoining of environmental constraints and site properties are present for the later prehistoric occupations in the Arkansas and Mississippi River areas. Direct linkages between comprehensive site databases and satellite images can be used to evaluate site distributions for research and management.

Limp, W. Fredrick

Connecting Projects to Complete the In Situ Resource Utilization Paradigm

Terrain Identify specifics such as slope, rockiness, traction parameters Identify what part of ISRU needs each Physical Geotechnical Hardness, density, cohesion, etc. Identify what part of ISRU needs each (e.g., excavation needs to know hardness, density; soil processing needs to know density, cohesion; etc.)Mineral Identify specifics Identify what part of ISRU needs each Volatile Identify specifics Identify what part of ISRU needs each Atmosphere Identify specifics Identify what part of ISRU needs each Environment Identify specifics Identify what part of ISRU needs each Resource Characterization What: Develop an instrument suite to locate and evaluate the physical, mineral, and volatile resources at the lunar poles Neutron Spectrometer Near Infrared (IR) to locate subsurface hydrogen surface water Near IR for mineral identification Auger drill for sample removal down to 1 m Oven with Gas Chromatograph Mass Spectrometer to quantify volatiles present ISRU relevance: Water volatile resource characterization and subsurface material access removal Site Evaluation Resource Mapping What: Develop and utilize new data products and tools for evaluating potential exploration sites for selection and overlay mission data to map terrain, environment, and resource information e.g., New techniques applied to generate Digital Elevation Map (DEMs) at native scale of images (1mpxl)ISRU relevance: Resource mapping and estimation with terrain and environment information is needed for extraction planning Mission Planning and Operations What: Develop and utilize tools and procedures for planning mission operations and real time changes Planning tools include detailed engineering models (e.g., power and data) of surface segment systems allows evaluation of designs ISRU relevance: Allows for iterative engineering as a function of environment and hardware performance.

Paradigm

SITE project. Phase 1: Continuous data bit-error-rate testing

The Systems Integration, Test, and Evaluation (SITE) Project at NASA LeRC encompasses a number of research and technology areas of satellite communications systems. Phase 1 of this project established a complete satellite link simulator system. The evaluation of proof-of-concept microwave devices, radiofrequency (RF) and bit-error-rate (BER) testing of hardware, testing of remote airlinks, and other tests were performed as part of this first testing phase. This final report covers the test results produced in phase 1 of the SITE Project. The data presented include 20-GHz high-power-amplifier testing, 30-GHz low-noise-receiver testing, amplitude equalization, transponder baseline testing, switch matrix tests, and continuous-wave and modulated interference tests. The report also presents the methods used to measure the RF and BER performance of the complete system. Correlations of the RF and BER data are summarized to note the effects of the RF responses on the BER.

Fujikawa, Gene

Definition study for photovoltaic residential prototype system

A site evaluation was performed to assess the relative merits of different regions of the country in terms of the suitability for experimental photovoltaic powered residences. Eight sites were selected based on evaluation criteria which included population, photovoltaic systems performance and the cost of electrical energy. A parametric sensitivity analysis was performed for four selected site locations. Analytical models were developed for four different power system implementation approaches. Using the model which represents a direct (or float) charge system implementation the performance sensitivity to the following parameter variations is reported: (1) solar roof slope angle; (2) ratio of the number of series cells in the solar array to the number of series cells in the lead-acid battery; and (3) battery size. For a Cleveland site location, a system with no on site energy storage and with a maximum power tracking inverter which feeds back excess power to the utility was shown to have 19 percent greater net system output than the second place system. The experiment test plan is described. The load control and data acquisition system and the data display panel for the residence are discussed.

Shepard, N. F.

lllinois Storage Corridor CarbonSAFE Phase III: Pre-drilling Site Assessment: Prairie State Generating Company

The Illinois Storage Corridor project will drill a stratigraphic test well as part of the Illinois Storage Corridor CarbonSAFE Phase 3 project near the Prairie State Generating Company coal-fired power plant near Marissa, Illinois. The pre-drilling site evaluation has considered the primary target reservoirs, the Potosi Dolomite and St. Peter Sandstone, and primary seal, the Maquoketa Group. Data to be collected from the well include core, fluid samples, in situ well tests, geophysical logs intended to provide information on lithologic, geomechanical, and geophysical characteristics to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The planned drilling site has been evaluated using available subsurface geologic data and analyses from the Illinois Basin. These data provide lithologic and structural information, shallow groundwater resource distribution, location of known nearby wellbores, and regional drilling characteristics. The data were used to generate geologic structure and isopach maps for the target reservoir and caprock strata and for prognosing the tops of major lithologic units to aid drilling and coring procedures. The regional analyses indicate that no known structural features are expected to negatively impact the target storage reservoir or caprock. No protected and sensitive areas, groundwater resources, or existing resource development are expected to be impacted by the proposed well drilling activities. The well is planned to be drilled to a total depth of approximately 5,600 feet (1,707 m) and terminate in the Precambrian. Cores (up to 5 intervals) will be collected from the Maquoketa Group, confining units above the St. Peter Sandstone, St. Peter Sandstone, confining units of the Potosi Dolomite and the Potosi Dolomite. Water samples will be attempted to be collected from the St. Peter Sandstone and Potosi Dolomite. Potential impact on drilling progress is a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification elsewhere in the Illinois Basin. This document also presents a preliminary coring and sampling program, proposed logging suite, and well testing program, all of which will be reviewed during drilling.

01 COAL, LIGNITE, AND PEAT