Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “setup”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

Moore, J. E.↗

Thermal/optical test setup for the Geostationary Operational Environmental Satellite Telescope

The Geostationary Operational Environmental Satellite (GOES) Telescope is designed to be passively temperature compensated so that focus requirements will be met over a broad range of temperatures. Concerns over the effects of temperature gradients on the optical performance of the telescope and the repeatability of the 'pointing error' of the telescope spawned the need for a detailed thermal/optical test. The telescope temperature compensation system, the thermal environment in which it must work and the test setup used to measure optical performance under varying temperature conditions are discussed in this paper.

Zurmehly, G. E.↗

Protein Crystal Growth Under Forced Solution Flow: Experimental Setup and General Response of Lysozyme

We have experimentally studied the effects of solution flow on the growth kinetics of the protein lysozyme. To this end, we have expanded our interferometry setup by a novel crystallization cell and solution recirculation system. This combination permits monitoring of interface morphology and kinetics with a depth resolution of 200 A at bulk flow rates of up to 2000 micron/s. Particular attention was paid to the prevention of protein denaturation that is often associated with the pumping of protein solutions. We found that at bulk flow rates it less than 250 microns/s the average growth rate and step velocity, R(sub avg) and upsilon(sub avg) increase with increasing it. This can be quantitatively understood in terms of the enhanced, convective solute supply to the interface. With high-purity solutions, it u greater than 250 microns/s lead to growth deceleration, and, at low supersaturations sigma, to growth cessation. When solutions containing approx. 1% of other protein impurities were used, growth deceleration occurred at any u greater than 0 and cessation in the low sigma experiments was reached at about half the it causing cessation with pure solution. The flow-induced changes in R(sub avg) and upsilon(sub avg) including growth cessation, were reversible and reproducible, independent of the direction of the u-changes and solution purity. Hence, we attribute the deceleration to the convection-enhanced supply of impurities to the interface, which at higher flow rates overpowers the effects of enhanced interfacial solute concentration. Most importantly, we found that convective transport leads to a significant reduction in kinetics fluctuations, in agreement with our earlier expectations for the lysozyme system. This supports our hypothesis that these long-term fluctuations represent an intrinsic response feature of the coupled bulk transport-interfacial kinetics system in the mixed growth control regime.

Vekilov, P. G.↗

Capitalize on the benefits of OAB - looking beyond the standard setup

Going beyond the initial setup of OAB, how to customize and maintain OAB to fit your current business process. There are many challenges in mapping data from outside sources into OAB and interfacing it to Payroll. Also, life events and fast formulas play a critical role in the customization of OAB.

Oracle validation↗

Learn to Fly Test Setup and Concept of Operations

The NASA Learn-to-Fly (L2F) project recently completed a series of flight demonstrations of its learning algorithm for flight control at Fort A. P. Hill in Virginia. This paper discusses the test setup and concept of operations (ConOps) used by the L2F team. Unmanned airframe demonstrators for testing the research algorithms included a modified commercial off-the-shelf subscale powered airplane, plus four gliders – two of which had an unconventional configuration and were fabricated using a “rapid” prototyping technique. Avionics system similarities and differences between the test aircraft are described, as well as ground testing in preparation for flight. The ConOps discussion includes the development of a tethered helium balloon drop launch technique for the glider demonstrators. This launch method was chosen for its potential to be inexpensive and allow for rapid turn-around for multiple glider launches – but it also presented challenges, such as balloon tether avoidance, high angle of attack, low dynamic pressure initial conditions, and susceptibility to winds. A remotely piloted approach employing high-end hobbyist radio controlled (R/C) hardware was used for the powered demonstrator. This approach accommodated the interaction between the R/C flight system and the research flight control computer, engaging the L2F algorithm at varying initial conditions and artificially reducing the aircraft stability to stress the algorithm.

Riddick, Stephen E↗

DGEN Aeropropulsion Research Turbofan Source-Diagnostic Test: Experimental Setup and Acoustic-Data Structure

The experimental setup of, and available data from a recent core/combustor-noise source-diagnostic test utilizing a small turbofan engine are described. The 2019 test campaign continued the investigation of the core/combustor-noise component of aircraft-propulsor noise begun in an earlier baseline test, but with a more extensive acoustic-instrumentation layout. The purpose of both tests was to better understand the impact on civilian-transport airport-community noise from turbofan-combustor sources and thereby to lay the foundation for improved noise-prediction methods and noise-mitigation techniques. Simultaneous high-data-rate acoustic measurements were obtained using a circumferential sensor array at the core nozzle exit in conjunction with sideline and farfield microphone arrays. The test matrix contained engine operational points from engine idle to maximum power and was repeated for different circumferential and sideline array configurations, as well as for redundancy. The extensive data set (up to 93 channels of data and various configurations) allows the application of advanced source-separation and phased-array methods to elucidate not only the core-noise structure, but also the propagation characteristics of other propulsion noise sources. The present report provides a detailed description of the different test points, their associated instrumentation layouts, and the structure of the acquired data set. Results from various data analyses are reported separately.

Aeroacoustics↗

Alternative Setup for Long-Duration Low-Duty-Cycle 600°C Ambient Testing of SiC Integrated Circuits

A scalable, compact oven testbed system for simultaneously evaluating a multitude of high temperature integrated circuits (ICs) for prolonged operating times of up to 600 °C has been prototyped. The new testbed system enables long-duration high temperature testing in sufficient statistical quantities consistent with standard aerospace electronics engineering standards. This setup is comprised of multiple compact ovens housing chips or packages mounted to ceramic circuit boards. Each oven is a compact 15.2 cm length by 15.2 cm width by 12.7 cm depth with a maximum 400 Watts of heating power. The custom-made silicon oxide ceramic heating block inside each oven is based on a 3D printed design adapted for the easy insertion of the IC device under test (DUT). This innovative design provides the quick insertion of ICs with or without a ceramic package into a 600 °C environment by utilizing a movable 11.43 cm long ceramic substrate with electrical traces extending from the oven hot zone to external standard plastic-based board connectors. Another key oven design feature is the minimization of the DUT exposure to electromagnetic interference (EMI) by utilizing a filtered DC power source to reduce heating element noise. Additionally, the ovens can be configured in a parallel arrangement allowing global data monitoring over a single industrial RS422 serial port. This feature is important for scaling up to test multiple ICs semi-simultaneously. A USB serial port is provided to independently control the operating parameters of each oven such as the oven target temperature and oven ramp rate. The oven temperature can reach up to 600 °C with a confirmed +/- 4 °C maximum deviation across the test zone region. The ramp rate can be programmed from 1 °C/minute up to 10 °C/minute. Furthermore, a programmable switchboard is used to interface with the DUT. This switchboard comprises a National Instruments Peripheral Component Interconnect eXtension for Instrumentation (NI PXI) system and a breakout board to send and receive power, analog or digital test signals. By using this unique oven testbed system, a variety of ICs can now be tested in parallel using the same test components configured for a diverse set of requirements.

DC Powered Oven↗

Short Exploration Extravehicular Mobility Unit Testing Setup: Evaluation Under Realistic Pressure and Thermal Conditions

The purpose of Short Exploration Extravehicular Mobility Unit (SxEMU) thermal vacuum testing was to verify the functionality of the Design Verification Testing (DVT) prototype xEMU (SxEMU for this test) at vacuum pressures and extreme space and lunar surface temperature conditions. The SxEMU Thermal Vacuum Test was the culmination of the DVT xEMU project. This paper’s focus is on the pre-Extravehicular Activity (EVA) test setup, and general performance of the SxEMU Portable Life Support Subsystem (xPLSS), with focus on the performance of the Primary Oxygen Assembly (POA) and Secondary Oxygen Assembly (SOA), including Secondary Oxygen Regulator (SOR) takeover and the POA and SOA low-setpoint change inhibit. The initial pre-EVA test preparation included recharging the batteries and replenishing consumables, including test-system water, oxygen assemblies (with gaseous nitrogen), and the integrated thermal loops, including the Feedwater Supply Assemblies. xPLSS functionality testing included carbon dioxide (CO2) removal via the Rapid Cycle Amine swingbed system, thermal loop temperature control, and monitoring of suit ventilation loop pressure, temperature, and CO2 percentages. Testing evaluated automatic takeover of suit pressure control by the SOR after the primary oxygen supply is depleted. The Primary Oxygen Regulator and SOR low-setpoint change inhibit function prevents the crewmember from inadvertently setting the primary regulator to a low pressure setpoint during an EVA.

xPLSS↗

Experimental Setup for Mechanically Testing Subscale Triangular, Rollable, and Collapsible Deployable Composite Booms

High-strain composite deployable space structures are used for space infrastructure and science applications such as solar array supports, antennae, camera masts, and lightweight structures supporting solar sailing propulsion ele-ments. Triangular, Rollable, and Collapsible (TRAC) deployable composite booms are one example of a high-strain composite deployable structure and were studied using novel experimental test and characterization methods developed under the Gravity Offloading and Analysis of Long Imperfection-sensitive Ele-ments (GOALIE) project. In the present work, a subscale 7-m-long TRAC boom was suspended vertically to orient gravity along the length of the boom. By ori-enting vertically, highly nonlinear and unstable behavior often encountered dur-ing horizontally oriented gravity offload testing of similar structures was reduced. Pretest analytical predictions of TRAC booms indicated three unique failure modes, loads, and locations for three unique loading cases of in-plane bending, out-of-plane bending, and axial compression. To investigate the predicted behav-ior, an experimental test was set up to impart mechanical loads to a subscale TRAC boom. The experimental setup, loading cases, and instrumentation used to characterize the mechanical response of a subscale TRAC boom are described in this paper.

High-strain composites↗

Experimental Setup for Mechanically Testing Subscale Triangular, Rollable, and Collapsible Deployable Composite Booms

High-strain composite deployable space structures are used for space infrastructure and science applications such as solar array supports, antennae, camera masts, and lightweight structures supporting solar sailing propulsion elements. Triangular, Rollable, and Collapsible (TRAC) deployable composite booms are one example of a high-strain composite deployable structure and were studied using novel experimental test and characterization methods developed under the Gravity Offloading and Analysis of Long Imperfection-sensitive Elements (GOALIE) project. In the present work, a subscale 7-m-long TRAC boom was suspended vertically to orient gravity along the length of the boom. By orienting vertically, highly nonlinear and unstable behavior often encountered during horizontally oriented gravity offload testing of similar structures was reduced. Pretest analytical predictions of TRAC booms indicated three unique failure modes, loads, and locations for three unique loading cases of in-plane bending, out-of-plane bending, and axial compression. To investigate the predicted behavior, an experimental test was set up to impart mechanical loads to a subscale TRAC boom. The experimental setup, loading cases, and instrumentation used to characterize the mechanical response of a subscale TRAC boom are described in this paper.

Experimental testing↗

Optimal regulator or conventional? Setup techniques for a model following simulator control system

Optimal regulator technique was compared for determining simulator control system gains with the conventional servo analysis approach. Practical considerations, associated with airborne motion simulation using a model-following system, provided the basis for comparison. The simulation fidelity specifications selected were important in evaluating the relative advantages of the two methods. Frequency responses for a JetStar aircraft following a roll mode model were calculated digitally to illustrate the various cases. A technique for generating forward loop lead in the optimal regulator model-following problem was developed which increases the flexibility of that approach. It appeared to be the only way in which the optimal regulator method could meet the fidelity specifications.

Deets, D. A.↗

Experimental setup for decomposition of UF6

The rate at which UF6 decomposes into UF5 and UF4 was determined as a function of neutron fluence. To study UF6 decomposition rate, an absorption cell for VUV and the associated VUV spectroscopy system was used to measure UF6 while under irradiation. The cell contains 50 torr of UF6 at room temperature to insure that the UF6 is in a gaseous state. It is shown that by determining the absorption coefficient below 2100A for UF6, above 2100A for F2, and at 4100A for cell degradation, UF6 decomposition can be measured at a neutron flux of 10 to the 12th power/sq cm for 72 continuous hours.

Rowe, M.↗