At least 37 records · Page 2

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3 ) was deployed on Mars in February 2019 and began attempting to penetrate to its target depth range of 3-5 meters shortly thereafter. However, the mole’s downward progress stopped after only 35 cm of penetration. In response, the project convened an Anomaly Response Team (ART) and since then has been attempting to diagnose the problem and assist the mole using the tools available on Mars. The key asset used in this effort has been the Instrument Deployment System (IDS), which includes two cameras and a robotic Instrument Deployment Arm (IDA). Since the IDS was originally intended only to deploy InSight’s primary instruments to the Martian surface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to be developed on a short timeline. The HP3 Mole ART first focused on gathering all observable data on Mars about the state of the mole and Support Structure Assembly (SSA), as well as the physical properties of the Martian regolith. This included using the robotic arm to point the IDC (Instrument Deployment Camera) at the SSA during diagnostic hammering attempts to observe motion of the SSA and science tether. Images taken during these attempts revealed some motion of the SSA, but no apparent change in mole depth. At JPL, the IDS and Testbed teams re-created the hardware configuration on Mars based on limited knowledge of the mole’s state. They devised and tested techniques to use the robotic arm and cameras to accomplish previously untested activities on Mars, including imaging the HP3 , using the IDA to interact with the terrain, and using the IDA to move the SSA away from the partially-embedded mole. The team executed the more promising techniques on Mars. After diagnostic hammering on Mars, the team decided to move the SSA to gain visibility of the mole’s configuration and access to the soil around the mole. After developing the technique and practicing the maneuver in the InSight testbed, the team lifted the SSA on Mars and placed it behind the mole. This revealed a pit surrounding the now exposed mole, observations of which provided essential clues for determining the root cause of the mole’s lack of progress. The IDS and Testbed teams altered the testbed to match the situation on Mars. They devised IDA techniques to determine the Martian soil properties and assist the mole’s descent. They tested these techniques in the testbed and executed the more promising ones on Mars. These include using the robotic arm to alter the regolith near the mole and to push on the mole while it hammers. This paper discusses the anomaly resolution testing in the testbed at JPL, describes how the IDS team prepared for the anomaly recovery activities on Mars, and provides preliminary results of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗

Increases in Efficiency and Enhancements to the Mars Observer Non-stored Commanding Process

The Mars Observer team was, until the untimely loss of the spacecraft on August 21, 1993, performing flight operations with greater efficiency and speed than any previous JPL mission of its size. This level of through-put was made possible by a Mission Operations System which was composed of skilled personnel using sophisticated sequencing and commanding tools. During cruise flight operations, however, it was realized by the project that this commanding level was not going to be sufficient to support the activities planned for the mapping operations. The project had committed to providing the science instrument principle investigators with a much higher level of commanding during mapping. Thus, the project began taking steps to enhance the capabilities of the flight team. One mechanism used by project management was a tool available from Total Quality Management (TQM). This tool is known as a Process Action Team (PAT). The Mars Observer PAT was tasked to increase the capacity of the flight team's non-stored commanding process by fifty percent with no increase in staffing and a minimal increase in risk. The outcome of this effort was to, in fact, increase the capacity by a factor of 2.5 rather than the desired fifty percent and actually reduce risk. The majority of these improvements came from the automation of the existing command process. The results required very few changes to the existing mission operations system. Rather, the PAT was able to take advantage of automation capabilities inherent in the existing system and make changes to the existing flight team procedures. This paper will describe in detail the enhancements recommended by the PAT for the non-stored command generation process on Mars Observer. This will be contrasted with the process used by the flight team prior to implementation of these improvements. Finally, there will be a discussion of the applicability of the techniques devised by the PAT for enhancement of the non-stored command process to present and future projects.

Process↗

Increases in efficiency and enhancements to the Mars Observer non-stored commanding process

The Mars Observer team was, until the untimely loss of the spacecraft on August 21, 1993, performing flight operations with greater efficiency and speed than any previous JPL mission of its size. This level of through-put was made possible by a mission operations system which was composed of skilled personnel using sophisticated sequencing and commanding tools. During cruise flight operations, however, it was realized by the project that this commanding level was not going to be sufficient to support the activities planned for mapping operations. The project had committed to providing the science instrument principle investigators with a much higher level of commanding during mapping. Thus, the project began taking steps to enhance the capabilities of the flight team. One mechanism used by project management was a tool available from total quality management (TQM). This tool is known as a process action team (PAT). The Mars Observer PAT was tasked to increase the capacity of the flight team's nonstored commanding process by fifty percent with no increase in staffing and a minimal increase in risk. The outcome of this effort was, in fact, to increase the capacity by a factor of 2.5 rather than the desired fifty percent and actually reduce risk. The majority of these improvements came from the automation of the existing command process. These results required very few changes to the existing mission operations system. Rather, the PAT was able to take advantage of automation capabilities inherent in the existing system and make changes to the existing flight team procedures.

Brooks, Robert N., Jr.↗

Automated Planning and Scheduling for Planetary Rover Distributed Operations

Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

Backes, Paul G.↗

Telescope protection algorithm for the Space Infrared Telescope Facility

This paper presents a proposed on-board Telescope Protection Algorithm (TPA) for the Space Infrared Telescope Facility (SIRTF). This TPA consists of hardware and software capable of performing both fail-operational and fail-safe modes of operation. In the fail-operational mode, each ephemeris load and slew/dwell command sequence is checked on-board before use. The slew command monitor detects unallowable slew/dwell commands and transfers control to an algorithm which slews to and maintains a safe telescope orientation while preserving precise attitude determination and control. This fail-operational mode is also given the authority to autonomously restart the slew/dwell sequence at a point beyond the faulty command. The fail-safe system consists of software and hardware which detects impending earth, moon, or sun avoidance zone violations and activates a backup hardware safe hold mode. The subject TPA and relevant sensor complement were designed for the SIRTF mission; however, this system can easily be used as a basis for failure detection and correction in a wide range of other missions.

Class, B. F.↗

Baseline tests of an autonomous telerobotic system for assembly of space truss structures

Several proposed space missions include precision reflectors that are larger in diameter than any current or proposed launch vehicle. Most of these reflectors will require a truss structure to accurately position the reflector panels and these reflectors will likely require assembly in orbit. A research program has been conducted at the NASA Langley Research Center to develop the technology required for the robotic assembly of truss structures. The focus of this research has been on hardware concepts, computer software control systems, and operator interfaces necessary to perform supervised autonomous assembly. A special facility was developed and four assembly and disassembly tests of a 102-strut tetrahedral truss have been conducted. The test procedures were developed around traditional 'pick-and-place' robotic techniques that rely on positioning repeatability for successful operation. The data from two of the four tests were evaluated and are presented in this report. All operations in the tests were controlled by predefined sequences stored in a command file, and the operator intervened only when the system paused because of the failure of an actuator command. The tests were successful in identifying potential pitfalls in a telerobotic system, many of which would not have been readily anticipated or incurred through simulation studies. Addressing the total integrated task, instead of bench testing the component parts, forced all aspects of the task to be evaluated. Although the test results indicate that additional developments should be pursued, no problems were encountered that would preclude automated assembly in space as a viable construction method.

Rhodes, Marvin D.↗

Developing and Implementing a Process to Verify and Validate the NASA InSight Mission’s Instrument Command Products

The NASA InSight Mars lander is a roboticspacecraft which is investigating the interior structure of Marsthrough a series of seismological measurements andexperiments. Much of the commanding of activities performedby the instruments was done using ‘blocks’ – reusable functionswritten in Virtual Machine Language stored onboard thespacecraft– and sequences (series of commands) that werecreated by teams to operate their instruments. It was vital thatthese blocks and sequences (collectively called commandproducts) be thoroughly examined prior to onboard executionusing a comprehensive test program to reduce risk to thespacecraft and instruments and ensure smooth operations onthe surface of Mars. The Verification and Validation (V&V)process that was designed and implemented during the monthsleading up to InSight’s launch and landing successfullyuncovered a number of issues that could have causedoperational delays or impacted hardware. The process alsohelped adapt ground tools to better model onboard activities,create operational principles to avoid unintended consequencesduring flight, and generate a reference database for commandproduct use during operations. This allowed InSight to meet itssurface operations goals in the desired timeframe. This paperdescribes the development, implementation and results ofInSight’s command product V&V process, its contribution tomission success, and challenges faced.

Cloutier, Kyle↗

Radio-hosted Flight / Ground Interface for Operations Standardization

The interface between a spacecraft and its ground operations segment includes the flow of commands, configuration, and sequencing elements to the spacecraft, and the flow of telemetry and data products from the spacecraft. Creating and implementing a complete definition of this interface simplifies and standardizes mission operations, allowing easy sharing of operations personnel across missions. Early spacecraft featured a simple flight / ground interface (FGI) using hardware command decoding in the radio, driven by technological limitations of the time. Modern spacecraft use command and data handling (CDH) avionics on which flight software executes, which in turn controls and configures the mission, executes subsystem and instrument instructions, and implements critical fault protection actions. Deep space missions feature advanced operations software for running sequenced activities over a period of weeks, which allows them to function with only infrequent ground contact. This approach comes at the cost of increased complexity in the FGI, requiring expensive modifications to heritage flight software and ground systems. By hosting the interface in the radio instead of the CDH avionics, modern missions can approximate the FGI design simplicity of early spacecraft, with significant advantages for vendor competition, lowered costs, standardization of operations, and reduction of implementation risk.

Lock, Patricia D.↗

Irreducible Tests for Space Mission Sequencing Software

As missions extend further into space, the modeling and simulation of their every action and instruction becomes critical. The greater the distance between Earth and the spacecraft, the smaller the window for communication becomes. Therefore, through modeling and simulating the planned operations, the most efficient sequence of commands can be sent to the spacecraft. The Space Mission Sequencing Software is being developed as the next generation of sequencing software to ensure the most efficient communication to interplanetary and deep space mission spacecraft. Aside from efficiency, the software also checks to make sure that communication during a specified time is even possible, meaning that there is not a planet or moon preventing reception of a signal from Earth or that two opposing commands are being given simultaneously. In this way, the software not only models the proposed instructions to the spacecraft, but also validates the commands as well.To ensure that all spacecraft communications are sequenced properly, a timeline is used to structure the data. The created timelines are immutable and once data is as-signed to a timeline, it shall never be deleted nor renamed. This is to prevent the need for storing and filing the timelines for use by other programs. Several types of timelines can be created to accommodate different types of communications (activities, measurements, commands, states, events). Each of these timeline types requires specific parameters and all have options for additional parameters if needed. With so many combinations of parameters available, the robustness and stability of the software is a necessity. Therefore a baseline must be established to ensure the full functionality of the software and it is here where the irreducible tests come into use.

sequencing test↗

Preparing Cassini Uplink Operations for Extended Mission

The Cassini-Huygens Mission to Saturn and Titan, a joint venture between the National Aeronautics and Space Administration, the European Space Agency, and the Italian Space Agency, is conducting a four-year, prime mission exploring the Saturnian system, including its atmosphere, rings, magnetosphere, moons and icy satellites. Launched in 1997, Cassini began its prime mission in 2004. Cassini is now preparing for a new era, a two-year extended mission to revisit many of the highlights and new discoveries made during the prime mission. Because of the light time delay from Earth to Saturn, and the time needed to coordinate the complicated science and engineering activities that take place on the spacecraft, commanding on Cassini is done in approximately 40-day intervals known as sequences. The Cassini Uplink Operations team is responsible for the final development and validation of the pointing profile and instrument and spacecraft commands that are contained in a sequence. During this final analysis prior to uplink to the spacecraft, thorough and exact evaluation is necessary to ensure there are no mistakes during commanding. In order to perform this evaluation, complete and refined processes and procedures are fundamental. The Uplink Operations team is also responsible for anomaly response during sequence execution, a process in which critical decisions often are made in real-time. Recent anomalies on other spacecraft missions have highlighted two major risks in the operations process: (1) personnel turnover and the retirement of critical knowledge and (2) aging, outdated operations procedures. If other missions are a good barometer, the Cassini extended mission will be presented with a high personnel turnover of the Cassini flight team, which could lead to a loss of expertise that has been essential to the success of the prime mission. In order to prepare the Cassini Uplink Operations Team for this possibility and to continue to develop and operate safe science and engineering sequences, a review and major update of the current documentation and operations procedures was needed. This paper will address the changes made to extended mission sequence generation processes primarily due to new restrictions in spacecraft operating capability and lessons learned from prime mission. In addition, it will address the state of the prime mission operations procedures, the philosophy changes and updates that were made to those procedures in response to process improvement, and the validation of those new procedures through the training of current and new personnel. And lastly, it will address the lessons learned throughout prime mission and how the Uplink Operations team chose to incorporate those lessons into the working documentation and team knowledge. This incorporation was necessary to facilitate the success of the extended mission with potentially all new personnel at some point prior to the end of the mission.

Maxwell, Jennifer L.↗

Attitude Design for the LADEE Mission

The Lunar Atmosphere and Dust Environment Explorer (LADEE) satellite successfully completed its 148-day science investigation in a low-altitude, near-equatorial lunar orbit on April 18, 2014. The LADEE spacecraft was built, managed and operated by NASA's Ames Research Center (ARC). The Mission Operations Center (MOC) was located at Ames and was responsible for activity planning, command sequencing, trajectory and attitude design, orbit determination, and spacecraft operations. The Science Operations Center (SOC) was located at Goddard Space Flight Center and was responsible for science planning, data archiving and distribution. This paper details attitude design and operations support for the LADEE mission. LADEE's attitude design was shaped by a wide range of instrument pointing requirements that necessitated regular excursions from the baseline one revolution per orbit "Ram" attitude. Such attitude excursions were constrained by a number of flight rules levied to protect instruments from the Sun, avoid geometries that would result in simultaneous occlusion of LADEE's two star tracker heads, and maintain the spacecraft within its thermal and power operating limits. To satisfy LADEE's many attitude requirements and constraints, a set of rules and conventions was adopted to manage the complexity of this design challenge and facilitate the automation of ground software that generated pointing commands spanning multiple days of operations at a time. The resulting LADEE Flight Dynamics System (FDS) that was developed used Visual Basic scripts that generated instructions to AGI's Satellite Tool Kit (STK) in order to derive quaternion commands at regular intervals that satisfied LADEE's pointing requirements. These scripts relied heavily on the powerful "align and constrain" capability of STK's attitude module to construct LADEE's attitude profiles and the slews to get there. A description of the scripts and the attitude modeling they embodied is provided. One particular challenge analysts faced was in the design of LADEE maneuver attitudes. A flight rule requiring pre-maneuver verification of in-flight maneuver conditions by ground operators prior to burn execution resulted in the need to accommodate long periods in the maneuver attitude. This in turn complicated efforts to satisfy star tracker interference and communication constraints in lunar orbit. In response to this challenge, a graphical method was developed and used to survey candidate rotation angles about the thrust vector. This survey method is described and an example of its use on a particular LADEE maneuver is discussed. Finally, the software and methodology used to satisfy LADEE's attitude requirements are also discussed in the context of LADEE's overall activity planning effort. In particular, the way in which strategic schedules of instrument and engineering activities were translated into actual attitude profiles at the tactical level, then converted into precise quaternion commands to achieve those pointing goals is explained. In order to reduce the risk of time-consuming re-planning efforts, this process included the generation of long-term projections of constraint violation predictions for individual attitude profiles that could be used to establish keep-out time-frames for particular attitude profiles. The challenges experienced and overall efficacy of both the overall LADEE ground system and the attitude components of the Flight Dynamics System in meeting LADEE's varied pointing requirements are discussed.

LADEE↗

ATHLETE's Feet: Mu1ti-Resolution Planning for a Hexapod Robot

ATHLETE is a large six-legged tele-operated robot. Each foot is a wheel; travel can be achieved by walking, rolling, or some combination of the two. Operators control ATHLETE by selecting parameterized commands from a command dictionary. While rolling can be done efficiently with a single command, any motion involving steps is cumbersome - walking a few meters through difficult terrain can take hours. Our goal is to improve operator efficiency by automatically generating sequences of motion commands. There is increasing uncertainty regarding ATHLETE s actual configuration over time and decreasing quality of terrain data farther away from the current position. This, combined with the complexity that results from 36 degrees of kinematic freedom, led to an architecture that interleaves planning and execution at multiple levels, ranging from traditional configuration space motion planning algorithms for immediate moves to higher level task and path planning algorithms for overall travel. The modularity of the architecture also simplifies the development process and allows the operator to interact with and control the system at varying levels of autonomy depending on terrain and need.

Smith, Tristan B.↗

LADEE Simulation for Mission Operations

The Lunar Atmosphere Dust Environment Explorer (LADEE) model-based spacecraft simulator has been discussed previously at the Workshop on Spacecraft Flight Software including the verification and validation of the flight software, hardware integration of payloads, and multi-domain simulation. In addition to flight software development and testing the LADEE simulator was used by Mission Operations to develop and test spacecraft command scripts, train operators during mission simulations, verification of all tactical command sequence files uploaded to spacecraft during flight.This presentation will discuss the experience of the LADEE operations team using the spacecraft simulator including implementation, processes and lessons learned. We will also discuss a specific instance where the simulator was used in operations to debug and design a software fix for a spacecraft anomaly experienced with the star tracker.

Operations↗

AERCam Autonomy: Intelligent Software Architecture for Robotic Free Flying Nanosatellite Inspection Vehicles

The NASA Johnson Space Center has developed a nanosatellite-class Free Flyer intended for future external inspection and remote viewing of human spacecraft. The Miniature Autonomous Extravehicular Robotic Camera (Mini AERCam) technology demonstration unit has been integrated into the approximate form and function of a flight system. The spherical Mini AERCam Free Flyer is 7.5 inches in diameter and weighs approximately 10 pounds, yet it incorporates significant additional capabilities compared to the 35-pound, 14-inch diameter AERCam Sprint that flew as a Shuttle flight experiment in 1997. Mini AERCam hosts a full suite of miniaturized avionics, instrumentation, communications, navigation, power, propulsion, and imaging subsystems, including digital video cameras and a high resolution still image camera. The vehicle is designed for either remotely piloted operations or supervised autonomous operations, including automatic stationkeeping, point-to-point maneuvering, and waypoint tracking. The Mini AERCam Free Flyer is accompanied by a sophisticated control station for command and control, as well as a docking system for automated deployment, docking, and recharge at a parent spacecraft. Free Flyer functional testing has been conducted successfully on both an airbearing table and in a six-degree-of-freedom closed-loop orbital simulation with avionics hardware in the loop. Mini AERCam aims to provide beneficial on-orbit views that cannot be obtained from fixed cameras, cameras on robotic manipulators, or cameras carried by crewmembers during extravehicular activities (EVA s). On Shuttle or International Space Station (ISS), for example, Mini AERCam could support external robotic operations by supplying orthogonal views to the intravehicular activity (IVA) robotic operator, supply views of EVA operations to IVA and/or ground crews monitoring the EVA, and carry out independent visual inspections of areas of interest around the spacecraft. To enable these future benefits with minimal impact on IVA operators and ground controllers, the Mini AERCam system architecture incorporates intelligent systems attributes that support various autonomous capabilities. 1) A robust command sequencer enables task-level command scripting. Command scripting is employed for operations such as automatic inspection scans over a region of interest, and operator-hands-off automated docking. 2) A system manager built on the same expert-system software as the command sequencer provides detection and smart-response capability for potential system-level anomalies, like loss of communications between the Free Flyer and control station. 3) An AERCam dynamics manager provides nominal and off-nominal management of guidance, navigation, and control (GN&C) functions. It is employed for safe trajectory monitoring, contingency maneuvering, and related roles. This paper will describe these architectural components of Mini AERCam autonomy, as well as the interaction of these elements with a human operator during supervised autonomous control.

Fredrickson, Steven E.↗

Automatic Command Sequence Generation

Automatic Sequence Generator (Autogen) Version 3.0 software automatically generates command sequences for the Mars Reconnaissance Orbiter (MRO) and several other JPL spacecraft operated by the multi-mission support team. Autogen uses standard JPL sequencing tools like APGEN, ASP, SEQGEN, and the DOM database to automate the generation of uplink command products, Spacecraft Command Message Format (SCMF) files, and the corresponding ground command products, DSN Keywords Files (DKF). Autogen supports all the major multi-mission mission phases including the cruise, aerobraking, mapping/science, and relay mission phases. Autogen is a Perl script, which functions within the mission operations UNIX environment. It consists of two parts: a set of model files and the autogen Perl script. Autogen encodes the behaviors of the system into a model and encodes algorithms for context sensitive customizations of the modeled behaviors. The model includes knowledge of different mission phases and how the resultant command products must differ for these phases. The executable software portion of Autogen, automates the setup and use of APGEN for constructing a spacecraft activity sequence file (SASF). The setup includes file retrieval through the DOM (Distributed Object Manager), an object database used to store project files. This step retrieves all the needed input files for generating the command products. Depending on the mission phase, Autogen also uses the ASP (Automated Sequence Processor) and SEQGEN to generate the command product sent to the spacecraft. Autogen also provides the means for customizing sequences through the use of configuration files. By automating the majority of the sequencing generation process, Autogen eliminates many sequence generation errors commonly introduced by manually constructing spacecraft command sequences. Through the layering of commands into the sequence by a series of scheduling algorithms, users are able to rapidly and reliably construct the desired uplink command products. With the aid of Autogen, sequences may be produced in a matter of hours instead of weeks, with a significant reduction in the number of people on the sequence team. As a result, the uplink product generation process is significantly streamlined and mission risk is significantly reduced. Autogen is used for operations of MRO, Mars Global Surveyor (MGS), Mars Exploration Rover (MER), Mars Odyssey, and will be used for operations of Phoenix. Autogen Version 3.0 is the operational version of Autogen including the MRO adaptation for the cruise mission phase, and was also used for development of the aerobraking and mapping mission phases for MRO.

Fisher, Forest↗

Multimission high speed spacecraft simulation for the Galileo and Cassini missions

A simulation system has been developed which is capable of bit level simulation of spacecraft data systems. Object oriented techniques and an embedded interpreted language have been employed to produce a highly configurable tool for control and viewing of spacecraft states. Parallel processing computers have been used for running simulations to achieve execution performance of up to ten times real time, which allows for effective utilization of the simulator in testing spacecraft command sequences before they are committed to operation. Elements of simulations can be reused as-is in the construction of new simulators.