Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedules”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Scheduling strategies for the ESPRESSO follow-up of TESS targets

ABSTRACT Radial-velocity follow-up of stars harbouring transiting planets detected by TESS is expected to require very large amounts of expensive telescope time in the next few years. Therefore, scheduling strategies should be implemented to maximize the amount of information gathered about the target planetary systems. We consider myopic and non-myopic versions of a novel uniform-in-phase scheduler, as well as a random scheduler, and compare these scheduling strategies with respect to the bias, accuracy and precision achieved in recovering the mass and orbital parameters of transiting and non-transiting planets. This comparison is carried out based on realistic simulations of radial-velocity follow-up with ESPRESSO of a sample of 50 TESS target stars, with simulated planetary systems containing at least one transiting planet with a radius below 4R⊕. Radial-velocity data sets were generated under reasonable assumptions about their noise component, including that resulting from stellar activity, and analysed using a fully Bayesian methodology. We find the random scheduler leads to a more biased, less accurate, and less precise, estimation of the mass of the transiting exoplanets. No significant differences are found between the results of the myopic and non-myopic implementations of the uniform-in-phase scheduler. With only about 22 radial velocity measurements per data set, our novel uniform-in-phase scheduler enables an unbiased (at the level of 1 per cent) measurement of the masses of the transiting planets, while keeping the average relative accuracy and precision around 16 per cent and 23 per cent, respectively. The number of non-transiting planets detected is similar for all the scheduling strategies considered, as well as the bias, accuracy and precision with which their masses and orbital parameters are recovered.

Cabona, L.↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

US 2023/0182605 A1 Network constraint energy management system for electric vehicle depot charging and scheduling

Network constraint energy management system for electric vehicle (EV) depot charging and scheduling. In an embodiment, a power schedule is received from an economic dispatch application for a charging depot comprising EV charging station(s) and distributed energy resource(s). The power schedule may be simulated on a distribution network model of the charging depot, according to load flow analysis, to determine whether any grid-code violations occur. In response to the detection of violation(s), a constraint may be generated for each violating node, and the economic dispatch application may be re-executed with the constraint(s) to produce a new power schedule, until no violations are detected. When not all load demand can be satisfied by the power schedule, a charging schedule may be adjusted to ensure that critical energy requirements are satisfied. The final power and charging schedules may be used to schedule and control power generation and charging in the charging depot.

Hafiz, Faeza↗

End-Use Savings Shapes Measure Documentation: Dispatch Schedule Generation for Demand Flexibility Measures

This supplemental document describes the methodology used for determining the dispatch timing of various EUSS demand flexibility measures. Demand flexibility measures are designed to reduce/dispatch electricity demand in buildings during especially beneficial/critical times. The method used in this work utilizes predictions of building loads to generate a schedule that reflects the periods when the building's daily peak load occurs to support decision making in demand flexibility measures. The dispatch schedule generation method described in this document creates an hourly schedule that includes a load dispatch (peak) window for each day for a whole year based on load prediction, with options using different prediction methods: perfect prediction, bin-sampling method, fixed schedule, and outdoor air temperature (OAT)-based prediction method. The perfect prediction method performs a simulation to obtain the annual load profile as predicted load, representing the scenario of perfect load prediction. The bin-sampling method (1) categorizes days into representative bins by temperature characteristics, (2) performs simulations on sample days from each of those bins to create representative (or predicted) load, and (3) assigns representative loads for all days in a year based on the bin categorization. The fixed schedule method defines uniform start and end time of peak window with assumed fixed daily peak time, for all days in a season or a year. The OAT-based prediction method uses the statistics of OAT (minimum and maximum) as the indicators of peak load, with specified delay response time from building loads to temperature. Given the load prediction, daily peak periods are determined as a time window with specified length in each day that include the predicted daily peak load and with a secondary rule such as maximizing energy saving potential. The dispatch schedule generation method is not a standalone measure and is intended to be combined with other demand flexibility measures that could leverage the peak schedule and apply demand controls on specific systems or devices for demand response, such as measures described in "Measure Documentation - Thermostat Control for Load Shedding" and "Measure Documentation - Thermostat Control for Load Shifting".

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

OctoFAS: A Two-Level Fair Scheduler That Increases Fairness in Network-Based Key-Value Storage

We identified a fairness problem in a network-based key-value storage system using Intel Storage Performance Development Kit (SPDK) in a multitenant environment. In such an environment, each tenant’s I/O service rate is not fairly guaranteed compared to that of other tenants. To address the fairness problem, we propose OctoFAS, a two-level fair scheduler designed to improve overall throughput and fairness among tenants. The two-level scheduler of OctoFAS consists of (i) inter-core scheduling and (ii) intra-core scheduling. Through inter-core scheduling, OctoFAS addresses the load imbalance problem that is inherent in SPDK on the storage server by dynamically migrating I/O requests from overloaded cores to underloaded cores, thereby increasing overall throughput. Intra-core scheduling prioritizes handling requests from starving tenants over well-fed tenants within core-specific event queues to ensure fair I/O services among multiple tenants. OctoFAS is deployed on a Linux cluster with SPDK. Through extensive evaluations, we found that OctoFAS ensures that the total system throughput remains high and balanced, while enhancing fairness by approximately 10% compared to the baseline, when both scheduling levels operate in a hybrid fashion.

97 MATHEMATICS AND COMPUTING↗

Job Scheduler-Driven Power Gateway for High Performance Computing

Power gateways in the form of a microgrid can incorporate multiple distributed energy resources (DER) in either grid forming or grid following mode and support high performance computing (HPC) power profiles including the large load-follow requirements observed in multi-user HPC systems. The microgrid’s flexibility to operate in either grid forming or grid following mode and to actively switch between these modes enables baseline power from multiple non-baseline DER while maintaining high power quality metrics for the HPC system. But this enormous flexibility in demand response and time of use shifting is generally programmed independently of any integration with an HPC job scheduler which can better inform the load shaping by the microgrid. While there are many existing approaches where the HPC job scheduler takes in information from the grid to make queue scheduling decisions, this work takes the opposite view and explores a scheduler where the jobs in the queue can directly impact the settings of the grid. Several HPC scheduler strategies are tested where the jobs in the queue directly impact the settings of a microgrid designed for HPC operation which is driving a datacenter with three classes of HPC architectures. The scheduler operation is shown using a microgrid with 64 kW of solar capacity and 320 kWh of battery over a period of 21 days operating with significant low-follow swings, a throttled grid, cloudy conditions, switching between grid following and grid forming modes, and a wide range of battery states-of-charge all while maintaining high quality power metrics. The scheduler provides a mechanism for the job queue to directly impact a power gateway like a microgrid and to improve HPC power outcomes such as maximizing renewable energy usage

microgrid↗

HPC Digital Twins for Evaluating Scheduling Policies, Incentive Structures and their Impact on Power and Cooling

Schedulers are critical for optimal resource utilization in high-performance computing. Traditional methods to evaluate sched- ulers are limited to post-deployment analysis, or simulators, which do not model associated infrastructure. In this work, we present the first-of-its-kind integration of scheduling and digital twins in HPC. This enables what-if studies to understand the impact of parameter configurations and scheduling decisions on the physical assets, even before deployment, or regarching changes not easily realizable in production. We (1) provide the first digital twin framework extended with scheduling capabilities, (2) integrate various top-tier HPC systems given their publicly available datasets, (3) implement extensions to integrate external scheduling simulators. Finally, we show how to (4) implement and evaluate incentive structures, as- well-as (5) evaluate machine learning based scheduling, in such novel digital-twin based meta-framework to prototype scheduling. Our work enables what-if scenarios of HPC systems to evaluate sustainability, and the impact on the simulated system.

Maiterth, Matthias [ORNL] (ORCID:000000018698460X)↗

Energy-efficient cooperative resource allocation and task scheduling for Internet of Things environments

Offloading Internet of Things (IoT) tasks to the cloud for further processing might not always lead to an optimal execution time, particularly in situations such as resource contention, under-provisioning, over-provisioning, and fragmentation. In addition, dynamically optimizing the number of Virtual Machines (VMs) for resource scheduling in order to meet application requirements remains a major research challenge. Further, existing resource scheduling algorithms focus primarily on minimizing operational costs while maximizing resource sharing and utilization. Considering energy utilization as part of the resource allocation and scheduling process as an optimization objective for maintaining load balancing has often been neglected. To address these challenges and more, we propose a cooperative energy-aware resource allocation and scheduling strategy based on a Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) multi-criteria decision-making method. Here we used the Grid Workloads Archive dataset to evaluate our proposed approach named TOPREAL. Experimental results with respect to the allocation of VM resources when considering processing a large segment of tasks indicate that TOPREAL outperforms existing algorithms in terms of energy savings, with an average improvement of 40.25%, while maintaining an average improvement of 16.21% when it comes to execution time. Results also demonstrate that our method can save an average of 78.06 processing hours and 63,215kJ of energy when compared to existing scheduling algorithms. These results demonstrate the effectiveness of our proposed model and the viability of using multi-criteria decision-making techniques such as TOPSIS to solve the resource allocation and scheduling problem in edge environments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The relative influences of hydrologic information and dams’ hydropower scheduling decisions on electricity price forecasts

Price dynamics in wholesale electricity markets are driven by supply and demand. In markets with hydroelectric dams, the timing and amount of hydropower offered can influence prices in similar ways to wind and solar power. Unlike variable renewable energy, however, the supply of hydropower in wholesale markets is a function of both water availability and operational decisions at dams. Dam operators maximize revenues in wholesale markets by aligning generation with the periods of highest expected prices, and these scheduling decisions may in turn influence prices. Here, we examine the relative importance of two types of information in predicting forward electricity prices: a) water availability at dams, in the form of short-to-medium-range hydrological forecasts; and b) hourly scheduling decisions at dams. Using softly coupled hydrologic, hydropower scheduling, and power systems models spanning the U.S. Western Interconnection, we quantify the importance of hydrologic forecast accuracy in correctly predicting wholesale electricity prices and compare this with the influence of dam operators’ own hourly scheduling decisions on realized market prices. We find that aligning hydropower generation schedules with the periods of high forecasted prices causes larger, inadvertent price forecast errors than imperfect hydrologic forecasts. This suggests that knowledge of how water is managed by dam operators within the week is more important than weekly inflow forecast errors when predicting forward electricity prices. Our findings have implications for optimal hydropower scheduling by region. Specifically, accounting for price effects is critical in markets dominated by hydropower capacity.

Electricity markets↗

Multi-Time Scale Coordinated Control and Scheduling of Inverter-Based TCLs With Variable Wind Generation

To address microgrid tie flow errors caused by wind generation variability, here we propose and develop a multi-time scale coordinated control and scheduling strategy for inverter-based thermostatically controlled loads (TCLs). First, in hour-time scale, inverter-based TCLs with adjusting temperature set-point are modeled as virtual generators to compensate tie flow deviations in the day-ahead plan. Next, in minute-time scale, virtual batteries representing operating behaviors of inverter-based TCLs with frequency control are scheduled determined by the control of virtual generators in hour-time scale. The virtual batteries are scheduled to smooth out tie flow errors corresponding to day-ahead plan and hour-time scale schedules. The multi-time scale control methods are coordinated to employ the response potential of inverter-based TCLs and response curve-based methods are proposed to control inverter-based TCLs considering the customer privacy. The multi-time scale stochastic schedules which are based on response curves of inverter-based TCLs are coordinated to accommodate wind generation variability. Simulation results demonstrate that the microgrid tie flow errors are effectively mitigated by the proposed multi-time scale coordinated control and scheduling of inverter-based TCLs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Compressing micro-operations in scheduler entries in a processor

An electronic device includes a processor having a micro-operation queue, multiple scheduler entries, and scheduler compression logic. When a pair of micro-operations in the micro-operation queue is compressible in accordance with one or more compressibility rules, the scheduler compression logic acquires the pair of micro-operations from the micro-operation queue and stores information from both micro-operations of the pair of micro-operations into different portions in a single scheduler entry. In this way, the scheduler compression logic compresses the pair of micro-operations into the single scheduler entry.

Boyer, Michael W.↗

Three practical workflow schedulers for easy maximum parallelism

Runtime scheduling and workflow systems are an increasingly popular algorithmic component in HPC because they allow full system utilization with relaxed synchronization requirements. There are so many special-purpose tools for task scheduling, one might wonder why more are needed. Use cases seen on the Summit supercomputer needed better integration with MPI and greater flexibility in job launch configurations. Preparation, execution, and analysis of computational chemistry simulations at the scale of tens of thousands of processors revealed three distinct workflow patterns. A separate job scheduler was implemented for each one using extremely simple and robust designs: file-based, task-list based, and bulk-synchronous. Comparing to existing methods shows unique benefits of this work, including simplicity of design, suitability for HPC centers, short startup time, and well-understood per-task overhead. All three new tools have been shown to scale to full utilization of Summit, and have been made publicly available with tests and documentation. This work presents a complete characterization of the minimum effective task granularity for efficient scheduler usage scenarios. Here, these schedulers have the same bottlenecks, and hence similar task granularities as those reported for existing tools following comparable paradigms.

97 MATHEMATICS AND COMPUTING↗

An exploration of online-simulation-driven portfolio scheduling in Workflow Management Systems

Workflow Management Systems used to automate the execution of scientific workflow applications on parallel and distributed computing platforms must make scheduling decisions at runtime. A large number of workflow scheduling algorithms have been proposed in the literature, but often these algorithms are evaluated based on simplifying assumptions that may not hold in practice. Furthermore, published algorithm evaluation and/or comparison results are necessarily only for a subset of all possible scenarios, and thus may not include scenarios relevant to particular use-cases. Consequently, it is difficult for Workflow Management Systems (WMSs) developers to decide which scheduling algorithm should be implemented. To obviate this difficulty, one possible approach is to implement a portfolio of scheduling algorithms and select the most effective algorithm at runtime. One method for performing this selection is to run an online simulation for each algorithm in the portfolio. The algorithm that leads to the best performance, in simulation, is selected for future use. The above simulation-driven portfolio scheduling (SDPS) approach has been proposed in a few parallel and distributed computing contexts. The main objective of this work is to evaluate the feasibility and potential merit of SDPS if implemented in WMSs. Here we perform this evaluation using simulated WMS executions, where the simulations are instantiated from real-world platform and workflow configurations. Our main finding is that SDPS is on par with or outperforms an approach in which a single algorithm is used, where this algorithm is the one that performs best on average across all our experimental scenarios. Furthermore, we find that SDPS remains an attractive proposition even in the presence of high levels of simulation error and for simulators with relatively low levels of sophistication. In many of our experimental scenarios we find that mitigating simulation error at runtime can further improve performance. Finally, we show that simulation overhead can be made sufficiently low for SDPS to be feasible in practice.

97 MATHEMATICS AND COMPUTING↗

Integrated charging infrastructure planning and charging scheduling for battery electric bus systems

We report studies on the electric bus system planning problem have typically focused exclusively on either the deployment of charging infrastructure or the scheduling of charging events; few have examined the impact of charging facility deployment on charging activities. Considering the interdependence of system design and operational strategies, this study proposes a two-phase optimization framework for charging infrastructure planning and charging scheduling for battery electric bus systems. An integrated optimization model is first developed to simultaneously optimize charger deployment, on-board battery capacity, and charging schedules. A charging scheduling model is further proposed and a rolling horizon approach is utilized in the second phase to optimize the real-time charging scheduling of electric buses. Compared to existing electric bus system planning methods, the proposed integrated model can reduce the total system cost by 19.5%. In addition, compared to uncontrolled charging, the proposed rolling horizon-based charging strategy can reduce the total charging cost by 68.3%.

25 ENERGY STORAGE↗

Hydropower Scheduling Toolchains: Comparing Experiences in Brazil, Norway, and USA and Implications for Synergistic Research

While hydropower scheduling is a well-defined problem, there are institutional differences that need to be identified to promote constructive and synergistic research. We study how established toolchains of computer models are organized to assist operational hydropower scheduling in Brazil, Norway, and the United States’ Colorado River System (CRS). These three systems have vast hydropower resources, with numerous, geographically widespread, and complex reservoir systems. Although the underlying objective of hydropower scheduling is essentially the same, the systems are operated in different market contexts and with different alternative uses of water, where the stakeholders’ objectives clearly differ. This in turn leads to different approaches when it comes to the scope, organization, and use of models for operational hydropower scheduling and the information flow between the models. Here, we describe these hydropower scheduling toolchains, identify the similarities and differences, and shed light on the original ideas that motivated their creation. We then discuss the need to improve and extend the current toolchains and the opportunities to synergistic research that embrace those contextual differences.

13 HYDRO ENERGY↗

Link Scheduling in Satellite Networks via Machine Learning Over Riemannian Manifolds

Low Earth Orbit (LEO) satellites play a crucial role in enhancing global connectivity, serving a complementary solution to existing terrestrial systems. In wireless networks, scheduling is a vital process that allocates time-frequency resources to users for interference management. However, LEO satellite networks face significant challenges in scheduling their links towards ground users due to the satellites’ mobility and overlapping coverage. This paper addresses the dynamic link scheduling problem in LEO satellite networks by considering spatio-temporal correlations introduced by the satellites’ movements. The first step in the proposed solution involves modeling the network over Riemannian manifolds, thanks to their representation as symmetric positive definite matrices. We introduce two machine learning (ML)-based link scheduling techniques that model the dynamic evolution of satellite positions and link conditions over time and space. To accurately predict satellite link states, we present a recurrent neural network (RNN) over Riemannian manifolds, which captures spatio-temporal characteristics over time. Furthermore, we introduce a separate model, the convolutional neural network (CNN) over Riemannian manifolds, which captures geometric relationships between satellites and users by extracting spatial features from the network topology across all links. Simulation results demonstrate that both RNN and CNN over Riemannian manifolds deliver comparable performance to the fractional programming-based link scheduling (FPLinQ) benchmark. Remarkably, unlike other ML-based models that require extensive training data, both models only need 30 training samples to achieve over 99% of the sum rate while maintaining similar computational complexity relative to the benchmark.

42 ENGINEERING↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

On the Feasibility of Simulation-Driven Portfolio Scheduling for Cyberinfrastructure Runtime Systems

Runtime systems that automate the execution of applications on distributed cyberinfrastructures need to make scheduling decisions. Researchers have proposed many scheduling algorithms, but most of them are designed based on analytical models and assumptions that may not hold in practice. The literature is thus rife with algorithms that have been evaluated only within the scope of their underlying assumptions but whose practical effectiveness is unclear. It is thus difficult for developers to decide which algorithm to implement in their runtime systems.To obviate the above difficulty, we propose an approach by which the runtime system executes, throughout application execution, simulations of this very execution. Each simulation is for a different algorithm in a scheduling algorithm portfolio, and the best algorithm is selected based on simulation results. The main objective of this work is to evaluate the feasibility and potential merit of this portfolio scheduling approach, even in the presence of simulation inaccuracy, when compared to the traditional one-algorithm approach. We perform this evaluation via a case study in the context of scientific workflows. Our main finding is that portfolio scheduling can outperform the best one-algorithm approach even in the presence of relatively large simulation inaccuracies.

Casanova, Henri↗