Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedules”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

Happell, Nadine↗

Crew Autonomy Scheduling: Scheduling Performance Pilot Study

The purpose of this pilot study is to quantify crew performance in self-scheduling through Playbook, a mobile-based scheduling and planning tool. By investigating human performance within the task of self-scheduling, we can further develop countermeasures that can mitigate deficient scheduling performance, and evaluate changes as a result of these countermeasures. Moreover, this research can advise the development of standards and guidelines for autonomous crews in future missions. In human spaceflight today, the task of planning crew member’s schedules falls to Ops Planners. It takes many weeks to plan due to the complex impact each day-to-day activity can have on other activities, crew members, and resources. These impacts are measured as constraints, and these constraints can result in temporal, ordering, or resource requirements. As future spaceflight missions span longer distances and the latency of communication between the crew and Mission Control Center (MCC) increases, the need for crew members to work independently from MCC will also increase. This results in a need for crew members to be able to autonomously plan and adjust their own schedules.

planning↗

State-based scheduling: An architecture for telescope observation scheduling

The applicability of constraint-based scheduling, a methodology previously developed and validated in the domain of factory scheduling, is extended to problem domains that require attendance to a wider range of state-dependent constraints. The problem of constructing and maintaining a short-term observation schedule for the Hubble Space Telescope (HST), which typifies this type of domain is the focus of interest. The nature of the constraints encountered in the HST domain is examined, system requirements are discussed with respect to utilization of a constraint-based scheduling methodology in such domains, and a general framework for state-based scheduling is presented.

Muscettola, Nicola↗

Polynomial optimization techniques for activity scheduling. Optimization based prototype scheduler

Polynomial optimization techniques for activity scheduling (optimization based prototype scheduler) are presented in the form of the viewgraphs. The following subject areas are covered: agenda; need and viability of polynomial time techniques for SNC (Space Network Control); an intrinsic characteristic of SN scheduling problem; expected characteristics of the schedule; optimization based scheduling approach; single resource algorithms; decomposition of multiple resource problems; prototype capabilities, characteristics, and test results; computational characteristics; some features of prototyped algorithms; and some related GSFC references.

Reddy, Surender↗

A Generic Expert Scheduling System Architecture and Toolkit: GUESS (Generically Used Expert Scheduling System)

Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).

Liebowitz, Jay↗

Scheduling Results for the THEMIS Observation Scheduling Tool

We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.

Thermal Emission Imaging System (THEMIS)↗

An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

Moore, J. E.↗

Crew Autonomy through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

Future long duration exploration missions (LDEMs) bring new challenges to astronaut crews in deep space, one of which is increased communication latencies with ground stations. As a result, crews will have to behave more autonomously by self-scheduling their own operational timelines in an efficient and effective manner. To support crew autonomy, our team has spent the last few years developing Playbook, a mission planning and scheduling tool. Our research focuses on investigating scheduling performance using Playbook to inform the deployment of novel aids that streamline the timeline creation process and proposing relevant standards and guidelines for autonomous crews in LDEMs. Summarizing yearly progress of research analysis and experiment in HERA.

user experience↗

Crew Autonomy Through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

NASA’s future long duration exploration missions (LDEMs) will encounter increasing communication transmission delays as they move farther from Earth-based ground stations. Because crews can no longer rely on real-time support from ground planners, they will have to self-schedule their own operational timelines effectively and efficiently. To enable this, our team develops Playbook, a mission planning and scheduling tool. Our research focuses on quantifying scheduling performance using Playbook to inform the design and development of future features aimed at streamlining timeline creation. We also aim to propose standards and guidelines for autonomous crews in LDEMs. This year, we discuss preliminary results from HERA Campaign 6.

self-scheduling↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

Zoch, David R.↗

Requirements for the implementation of schedule repair technology in the Experiment Scheduling Program

The following list of requirements specifies the proposed revisions to the Experiment Scheduling Program (ESP2) which deal with schedule repair. These requirements are divided into those which are general in nature, those which relate to measurement and analysis functions of the software, those which relate specifically to conflict resolution, and those relating directly to the user interface. (This list is not a complete list of requirements for the user interface, but only a list of those schedule repair requirements which relate to the interface.) Some of the requirements relate only to uses of the software in real-time operations. Others are clearly for future versions of the software, beyond the upcoming revision. In either case, the fact will be clearly stated.

Bullington, Stanley F.↗

Utilizing Schedule Constraints to Improve Automated Scheduling in NASA's Deep Space Network

NASA’s Deep Space Network (DSN) is a mission critical facility that supports many different space missions,from LEO to deep space exploration. In recent years, as the network has suffered from increasing oversubscription, more restrictions have been added to reduce the amount of manual scheduling labor necessary to come to consensus. In this paper, we describe a new auto-mated scheduling tool which takes advantage of these restrictions to bring the scheduling problem closer to feasibility. In addition, we describe an algorithm to reduce problem inputs given a partially-solved problem,thereby bringing the problem even closer to feasibility

Johnston, Mark↗

Crew Autonomy through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

As NASA considers long-duration exploration missions, it is envisioned that crews will behave more autonomously as compared to low-Earth orbit missions. When considering long duration exploration missions, Flight Operations Directorate (FOD) identified the following benefits and challenges presented on this slide. As missions operate further from Earth, the communication latency between the spacecraft and Mission Control Center will increase requiring the crew to take a more active role in reacting to daily planning. However, one of the key challenges for crew self-scheduling is that we do not want to overwhelm astronauts who are not expert mission planners. This leads to our primary research objective: to first, characterize the human performance envelope for the task of planning and scheduling in the context of human spaceflight operations, then, develop countermeasure aids to mitigate adverse performance effects due to plan complexity, and finally, inform performance standards and guidelines based on research results. Our next steps are to finish summarizing our findings from the experiment in conference papers and our upcoming yearly report. In the upcoming year, we will continue to collect data in analog missions and begin summarizing our recommended standards and guidelines.

user experience↗