Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk-based assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session One - Abridged

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. This is Session 1 of 3.

25 - ENERGY STORAGE↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session Two

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. A comprehensive exploration of BESS cybersecurity supply chain risks, systematic vendor risk assessment through the BESS Procurement Guide, and practical application of the INL SCRM Chatbot for enhanced supply chain resilience. This is Session 2 of 3. (Full Version)

25 - ENERGY STORAGE↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session One

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. This is Session 1 of 3. (Full Version)

25 - ENERGY STORAGE↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL National Security Test Range

This assessment uses screening-level models to calculate potential environmental impacts from proposed tests at two locations at the Idaho National Laboratory (INL) National Security Test Range (NSTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K 2 O, LaBr 3 , KBr, Cu, Zr, F, Ga, Ga 2 O 3 , NaNO 2 , Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface-soil impacts were calculated with the computer program mixing-cell model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated based on the assumption that 12 tests are conducted annually using all 11 material types for 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer-code input, output, executable files, batch files, scripts, and spreadsheet files, are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS). It is highly unlikely the test scenarios evaluated in this ECAR will adversely impact human health based on comparisons of calculated dose and concentration against regulatory standards and risk-based screening levels. Conservative estimates of dose to workers and the public from atmospheric transport of possible radionuclide releases are far below federal radiation protection standards. Conservative estimates of potential contaminant concentrations in groundwater are less than federal drinking water standards or screening levels. Predicted radionuclide concentrations in surface soils are below risk-based screening levels, except for Ge-68 (material Ga-68) for the worker. The Ge-68 soil concentration can be made less than the worker PRG, if the number of annual tests using Ga-68 is reduced from 12 to 6. However, the sum of ratios still exceeds one because of the high K-40 ratio. If the EF of the worker (number of days the worker is in the contaminated testing area) is reduced from 225 days/yr (default value for full time worker) to 112 days/yr, the Ge-68 ratio is less than one and the sum of ratios is less than one. Actual radiation doses and groundwater and surface-soil concentrations are likely to be much less than those calculated because of the conservative assumptions and parameters employed in the modeling. For example, atmospheric-transport calculations assume the entire inventory of each material type is readily released to the atmosphere and no plume deposition, depletion, or radioactive decay occurs during transport. The calculations also assume the same meteorological conditions (e.g., wind velocity, wind direction, stability class) that produce the maximum 95th percentile concentration (i.e., concentration representing the 95th percentile of a distribution of concentrations derived from 3 years of hourly meteorological data) at each receptor location are the same for all 12 tests during the year, and each receptor is assumed to be present during all 12 tests. The surface-soil assessment assumes the entire inventory of each test is deposited in the top 5 cm of soil. No atmospheric dispersal is assumed, and the radionuclides are subject only to leaching and radioactive decay. The groundwater-pathway modeling is conservative in that it is one-dimensional in the unsaturated zone (no lateral spreading/dilution) and assumes the entire inventory of contaminants infiltrates into the ground at the same location for every test. This is especially conservative for particulate radionuclides because they would have to dissolve or corrode first and some would be dispersed into the atmosphere. The groundwater receptor is also assumed to consume water directly from a hypothetical well positioned in the location of maximum concentration. In addition, conservative degradation rates were used, and volatilization was not considered for the nonradradioactive chemicals modeled. And finally, the calculations assume all 12 tests will be performed at the same place at both locations, and all 11 radioactive material types will be used for each test. This is conservative because it is anticipated that no more than two material types will be used per test.

99 GENERAL AND MISCELLANEOUS↗

Climate Interventions Risk Framework White Paper

This work describes a structured, risk-based approach for analyzing questions related to the potential deployment of a climate intervention in any user-established future scenario, and further provides a structured means for considering what the potential consequences of such interventions may be. Because the climatological, technological, and geopolitical conditions are currently not believed to be supportive of climate intervention use, the framework establishes a three-pronged approach to frame key analytical questions predicated on future scenarios of interest to the user. These three pieces are: (1) Building a scenario. (2) Assessing the likelihood of that scenario based on assumptions about an actor and their motivations for deploying a climate intervention. (3) Analyzing the potential consequences of that climate intervention. Finally, results from this consequence analysis are compared against projected consequences of unabated climate change as a complete risk analysis of deploying a climate intervention.

54 ENVIRONMENTAL SCIENCES↗

Status Report on Regulatory Criteria Applicable to the Use of Artificial Intelligence (AI) and Machine Learning (ML)

Although the interest in the use of artificial intelligence (AI) and machine learning (ML) in nuclear energy is increasing rapidly, at present their implementation is limited. This rapid increase in interest is not surprising considering that implementing AI and ML technology would allow for continuous monitoring, facilitate the implementation of predictive maintenance with optimized staffing plans, enable automation and autonomy opportunities that could drastically reduce fixed operation and maintenance costs, and provide training for operations and maintenance. Other industries are using AI for construction, and in the nuclear arena AI could provide great benefit in decommissioning activities. The ability of AI and ML to operate in real time vastly increases their potential impact. Before AI can be used in design, operations, or as a regulatory tool, the specifics on the regulations applicable to the use of AI for nuclear power applications need to be established. The difficulty is that the specific use cases will dictate the applicability of regulations. For example, even within the application domain associated with operations, the regulations might vary if the AI is used to create a virtual reference for plant operations or is used for training, optimization of maintenance intervals, prioritization of maintenance activities, etc. Different still is if the AI is to be used for design or setting technical specifications, which will introduce additional requirements. US Nuclear Regulatory Commission (NRC) licensing reviews are based on an applicant’s design meeting its performance assessment based on (1) safety goals and objectives, (2) deterministic and/or probabilistic analysis of accident scenarios, and (3) quantitative assessment of design alternatives against the safety goals and objectives using accepted engineering tools, methodologies, and performance criteria. The current regulatory framework does not explicitly address AI or autonomous control. However, as implementing AI technology will require the use of a digital platform, it must meet the requirements of an instrumentation and control (I&C) system. The regulatory requirements for AI, which will be incorporated into the I&C system, will be very dependent on how it is used (i.e., its functionality, safety classification, etc.). The licensing process is primarily risk-based with the identification of components and systems as nonsafety, important to safety, or safety related. A risk-informed approach allows further gradation of components and systems based on risk metrics such as core damage frequency or large early release fractions. Thus, the use cases and the risk categorization of impacted systems and components will determine the regulatory requirements. Regardless of how AI is used it presents new opportunities for risk-informing operating, maintenance, and regulatory decisions. Trustworthiness, transparency, and the ability to validate and verify the results will be paramount in showing that the systems and plant still meet their performance requirements. This report describes the results of research to identify regulatory implications of AI technologies and their uses. Specifically, this report reviews current regulatory guidance relevant to the application of AI for design (including design changes or new designs including advanced reactors), construction, operations, training, maintenance, research, testing, and as a regulatory tool. AI can be automated at different levels from purely informative purposes to autonomous controls. The focus of this review included determination of constraints on the application of AI technology, identification of any regulatory gaps or uncertainties, and clarification of anticipated technical basis information likely to be important for regulatory acceptance of these technologies. Currently, any use of AI at nuclear power plants is focused on nonsafety-related applications. The NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than create new regulations to address the use of AI and ML. This approach seems to be the best to encourage AI development without adding regulatory uncertainty.

97 MATHEMATICS AND COMPUTING↗

Computational Tools and Workflows for Quantitative Risk Assessment and Decision Support for Geologic Carbon Storage Sites: Progress and Insights from the U.S. DOE’s National Risk Assessment Partnership

The 2005 Intergovernmental Panel on Climate Change (IPCC) Special Report on CCS raised the profile of CO2 capture and storage (CCS) as an important technology for reducing greenhouse gas (GHG) emissions. CCS is now recognized as a key component of most climate change mitigation scenarios. Since publication of that report the international research, development, and deployment (RD&D) community has advanced key technical aspects, clarified regulatory requirements, explored value chain and infrastructure solutions, and developed incentive paradigms to enable and promote large-scale deployment of CCS. These efforts have included research to better characterize geologic storage resources, to improve injection performance and storage efficiency, to assess and manage subsurface environmental risks, and to advance monitoring technologies to assure system conformance. These efforts have helped to build confidence in the viability of geologic carbon storage (GCS), but stakeholder concerns about long-term risks and liability associated with GCS remain a hurdle to broad acceptance and large-scale deployment of CCS. Since 2010, the U.S. DOE’s National Risk Assessment Partnership (NRAP) – a research collaboration between five contributing national laboratories – has worked to establish and demonstrate methods and tools to quantify and manage the subsurface environmental risks associated with GCS, amidst uncertainty. This work supports the Office of Fossil Energy and Carbon Management Carbon Transport and Storage Program’s goal of advancing safe and secure commercial-scale GCS deployment. To address the technical challenge of simulating the physical response of the GCS site to large-scale CO2 injection, NRAP has adopted an approach that relies on coupling computationally efficient reduced-order and/or data-driven proxy models of important system components (i.e., storage reservoir, sealing caprock, leakage pathways, intermediate formations, overlying groundwater aquifers, and the atmosphere) in integrated assessment framework. That integrated model of the physical system is complemented with fit-for purpose functionality to support site characterization and risk-related decisions. The recently released NRAP Phase II toolset includes the Open-Source Integrated Assessment Model (NRAP-Open-IAM) for evaluation of trends in leakage risk and potential impact, tools to support monitoring design optimization (Designs for Risk Evaluation and Management – DREAM v3.0 and Passive Seismic Monitoring Tool - PSMT), and tools for state of stress evaluation (State-of-Stress Analysis Tool - SOSAT) and forecasting induced seismicity risk. The NRAP team has also released a pair of reports describing conceptual workflows to incorporate physics-based, quantitative risk assessment into many of the design, planning, operation, and closure decisions for GCS projects. An online catalogue highlights published studies where these tools and methods are demonstrated. In this presentation, the utility of these products to assess risks and address key stakeholder questions will be highlighted through examples, and related insights about the safety and security of geologic carbon storage in qualified storage sites will be discussed. The prospect of rapid, large-scale deployment of GCS technology to aggressively reduce anthropogenic CO2 emissions requires careful consideration of interference between multiple commercial-scale storage projects within a basin. Going forward, NRAP is expanding and adapting site-scale risk quantification tools and methods to enable assessment of risks and inform management decisions for basin-scale deployment. Increasingly, this work will leverage next-generation approaches for surrogate modelling, fast prediction, and advanced visualization enabled by machine learning and artificial intelligence to promote virtual learning, scenario evaluation, and augment risk-based decision making.

quantitative risk assessment, geologic carbon stor↗

Microbiome dynamics in the congregate environment of U.S. Army Infantry training

Within military training and operational environments, individuals from diverse backgrounds share common spaces, follow structured routines and diets, and engage in physically demanding tasks. While there has been interest in leveraging microbiome features to predict and improve military health and performance, the longitudinal convergence of microbiomes in such constrained environments has not been established. To assess the degree of microbiome convergence, we performed shotgun metagenomic sequencing on swab samples from a military trainee cohort. Samples were taken across four different body sites, three timepoints, and two spatially distinct platoons. We observed evidence of convergence in one platoon, whereby similarity in microbiome composition increased over time, with numerous differentially abundant species. We found no indication of strain transfer between individuals, suggesting that convergence was influenced by external environmental factors, diet, and lifestyle. Microbial shifts observed in the convergence process included a decrease in fungal species, such as Malassezia restricta in nasal cavities, and a decrease in Prevotella species at inguinal regions across time. Shifts in multiple Corynebacterium species were also observed with varying magnitudes depending on the body site. Overall, we provide preliminary evidence of convergence of host microbial communities in military-associated environments that were distinguishable using shotgun metagenomic sequencing approaches. The data presented here on microbiome convergence, dynamics, and stability may inform risk-based mitigation in congregate military settings facilitating development of targeted microbial, dietary, or other interventions to optimize health and performance of military populations.

Biological and medical sciences↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL Radiological Response Training Range

This assessment uses screening level models to calculate potential environmental impacts from proposed tests at the Idaho National Laboratory (INL) Radiological Response Training Range (RRTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K 2 O, LaBr 3 , KBr, Cu, Zr, F, Ga, Ga 2 O 3 , NaNO 2 , Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface-soil impacts were calculated with the computer program Mixing-Cell Model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated based on the assumption that 12 tests are conducted annually using all 11 material types for a period of 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer code input, output, executable files, batch files, scripts, and spreadsheet files are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS).

99 GENERAL AND MISCELLANEOUS↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL National Security Test Range

This assessment uses screening level models to calculate potential environmental impacts from proposed tests at two locations at the Idaho National Laboratory (INL) National Security Test Range (NSTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K 2 O, LaBr 3 , KBr, Cu, Zr, F, Ga, Ga 2 O 3 , NaNO 2 , Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface soil impacts were calculated with the computer program Mixing-Cell Model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated based on the assumption that 12 tests are conducted annually using all 11 material types for 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer code input, output, executable files, batch files, scripts, and spreadsheet files, are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS).

99 GENERAL AND MISCELLANEOUS↗

Developing and Implementing Risk-Based Research Safety at Argonne National Laboratory

Facilities operated by the US Department of Energy (DOE) are required to have extensive worker safety and health programs by regulation. Here we describe how Argonne National Laboratory (ANL) has implemented the DOE requirements to bring the Laboratory’s multidisciplinary research risk to an acceptable level to safely execute ANL’s mission to perform cutting-edge research.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

NRAP Recommended Practices for Containment Assurance and Leakage Risk Quantification

This report presents recommendations for quantitatively assessing and managing leakage risk and effective containment assurance at geologic carbon storage (GCS) sites, amidst uncertainty in site characteristics and performance. These recommended practices are a product of the U.S. Department of Energy’s (DOE) Office of Fossil Energy and Carbon Management’s National Risk Assessment Partnership (NRAP)—a multi-year collaborative research effort of Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, National Energy Technology Laboratory, and Pacific Northwest National Laboratory. These recommended practices are organized as a set of conceptual workflows that correspond with the stages of the GCS project lifecycle. They consider aspects of site characterization, quantification of potential leakage, assessing the spatial extent of potential environmental impacts, optimizing monitoring design for detection of potential leakage, evaluation of concordance between monitored and forecasted reservoir response, assessing conformance with expected/accepted performance, and determination of the timeline over which risk of impactful leakage can be expected to abate. These conceptual workflows are intended to aid stakeholders in making risk management decisions at GCS sites and to support development of sound, risk-based justifications for characterizing the subsurface, defining area of potential leakage impact, designing site monitoring plans, selecting leakage risk management/mitigation alternatives, and estimating site closure timelines.

54 ENVIRONMENTAL SCIENCES↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Plant Disease Detection Technology Assessment

Visual inspections by US Customs and Border Protection agriculture specialists have identified approximately 20,000 regulated, quarantined pests each year in agricultural products entering the United States. Most of these pests identified in the Agriculture Quarantine and Inspection (AQI) program are insects. Many pathogens are difficult to detect in agricultural products, particularly in early stages of infection. New technologies can help to detect plant pathogens and the diseases that they cause. This technology assessment was performed for the US Department of Homeland Security Science and Technology Directorate (DHS S&T) through the Food, Agriculture, and Veterinary Defense (FAV-D) program to identify emerging technologies that could address this hard problem. These emerging technologies differ in their diagnostic sensitivities and specificities, as well as in their measurement time and training requirements. New instruments that detect volatile organic compounds characteristic of plant disease or pathogens could provide a less invasive inspection method. Dogs, which can successfully detect many concealed agricultural products, have also been trained to detect some plant pests and pathogens. Simple immunological tests offer sensitive and specific detection of many pathogens at the point of use. Advanced imaging methods that use AI to sort fruits and vegetables and recognize anomalies at high speeds could be used in cooperation with exporters to improve food quality and reduce pests. Advances in nucleic acid–based detection methods that have become gold standards for confirmatory diagnostics are now making those methods available for faster, point-of-use detection. These new methods should be developed in the context of AQI operational requirements, which apply risk-based sampling protocols to protect agriculture and facilitate commerce and passenger transit.

59 BASIC BIOLOGICAL SCIENCES↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

The Cybersecurity Value-at-Risk Framework: Informing Cybersecurity Decisions

The Cybersecurity Value-at-Risk Framework is a tool that can be used by hydropower plant manager to make more educated cybersecurity investments. Users can take a self guided assessment allowing the tools to generate risk, impact and cybersecurity scores and be given risk-based recommendations to enhance decision-making.

CVF↗