Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk reduction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Expected individual benefit of prophylactic platelet transfusions in hemato‐oncology patients based on bleeding risks

Abstract Background Prophylactic platelet transfusions prevent bleeding in hemato‐oncology patients, but it is unclear how any benefit varies between patients. Our aim was to assess if patients with different baseline risks for bleeding benefit differently from a prophylactic platelet transfusion strategy. Study design and methods Using the data from the randomized controlled TOPPS trial (Trial of Platelet Prophylaxis), we developed a prediction model for World Health Organization grades 2, 3, and 4 bleeding risk (defined as at least one bleeding episode in a 30 days period) and grouped patients in four risk‐quartiles based on this predicted baseline risk. Predictors in the model were baseline platelet count, age, diagnosis, disease modifying treatment, disease status, previous stem cell transplantation, and the randomization arm. Results The model had a c‐statistic of 0.58 (95% confidence interval [CI] 0.54–0.64). There was little variation in predicted risks (quartiles 46%, 47%, and 51%), but prophylactic platelet transfusions gave a risk reduction in all risk quartiles. The absolute risk difference (ARD) was 3.4% (CI −12.2 to 18.9) in the lowest risk quartile (quartile 1), 7.4% (95% CI −8.4 to 23.3) in quartile 2, 6.8% (95% CI −9.1 to 22.9) in quartile 3, and 12.8% (CI −3.1 to 28.7) in the highest risk quartile (quartile 4). Conclusion In our study, generally accepted bleeding risk predictors had limited predictive power (expressed by the low c‐statistic), and, given the wide confidence intervals of predicted ARD, could not aid in identifying subgroups of patients who might benefit more (or less) from prophylactic platelet transfusion.

Cornelissen, Loes L.↗

Integration of sensors through additive manufacturing leading to increased efficiencies of gas turbines for power generation and propulsion

To realize the full capability of additively manufactured components in complex energy systems, it is imperative to minimize early component failures during development phases and during operation. Traditional field feedback timelines and offline inspection protocols significantly reduce the design-manufacturing iteration times. To address this specific question, the project developed and demonstrated a method for the integration of sensors into complex components through additive manufacturing. The team used gas turbine engines as a platform, which meets the need of both power generation and propulsion and offer opportunities for cost reductions and efficiency increases. The innovation of this intelligent integration of sensors into complex components uniquely customized to address questions of integrity and durability for additively manufactured components. With real-time sensing data from additively manufactured components, turbine manufacturers will realize higher efficiencies, reduced component failures, and a 30-50% acceleration in product deployment of high efficiency gas turbine components due to a faster reduction in component risk assessment under actual operating conditions. This is a transformative shift towards a data-driven design and qualification of additively manufactured gas turbine components. To directly integrate sensors into additively manufactured components with all the complexities of actual hardware, powder bed fusion (direct metal laser sintering) and laser metal deposition technologies was developed. Validation took take place in two university laboratories both of which contain actual engine hardware and closely simulate a gas turbine prior to demonstrating the technology in a turbine development test. Indeed, two major technologies from this research cold impact turbine systems in the near future: (1) higher efficiency materials and designs enabled by additive manufacturing with 50% faster design to manufacturing cycle time, to enable faster time-to-market targets; and (2) integration of sensors into additively manufactured components enabling broad health and condition based prognostics for faster component and engine risk reduction.

33 ADVANCED PROPULSION SYSTEMS↗

Quantitative Risk Assessment for Hydrogen-Powered Locomotive Refueling

Hydrogen powered locomotives are being explored to reduce emissions in rail applications. The risks of operations like refueling should be understood to ensure safe environments for workers and members of the public. Sensitivity analyses were conducted using HyRAM+ to identify major drivers of risk and compare effects of system parameters on individual risk. The consequences of jet fires from full-bore leaks dominated the risk, compared to explosions or smaller leaks. Pipe size, leak detection capability, and leak frequencies of system components greatly affected risk while overpressure modeling parameters and ambient conditions had little effect. The effects of personal protective equipment (PPE) materials on individual risk were quantified by reducing the individual’s exposure time or absorbed thermal dose. PPE only showed a risk reduction in low-risk cases. This study highlighted target areas for risk mitigation, including leak detection equipment and component maintenance, and indicated that the minimal effects of other parameters on risk may not justify prescriptive requirements for refueling operators.

08 HYDROGEN↗

The distributional impact of FEMA’s community rating system

Community Rating System (CRS) incentivizes investments in risk reduction above NFIP standards using discounts on insurance premiums. These discounts are cross-subsidized by increasing premiums in non-CRS communities. We examine the distribution of these subsidies and find that redistribution does occur, but the gains and losses are not economically large with 95% of households gaining or losing no more than 0.3% of household income. We also examine their relationship with other community characteristics and find that the strongest predictor of premium reductions is the underlying flood risk level within the community. Thus, CRS appears to reduce the cost of living in the riskier communities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SMART Subsea Cables for Observing the Earth and Ocean, Mitigating Environmental Hazards, and Supporting the Blue Economy

The Joint Task Force, Science Monitoring And Reliable Telecommunications (JTF SMART) Subsea Cables, is working to integrate environmental sensors for ocean bottom temperature, pressure, and seismic acceleration into submarine telecommunications cables. The purpose of SMART Cables is to support climate and ocean observation, sea level monitoring, observations of Earth structure, and tsunami and earthquake early warning and disaster risk reduction, including hazard quantification. Recent advances include regional SMART pilot systems that are the first steps to trans-ocean and global implementation. Examples of pilots include: InSEA wet demonstration project off Sicily at the European Multidisciplinary Seafloor and water column Observatory Western Ionian Facility; New Caledonia and Vanuatu; French Polynesia Natitua South system connecting Tahiti to Tubaui to the south; Indonesia starting with short pilot systems working toward systems for the Sumatra-Java megathrust zone; and the CAM-2 ring system connecting Lisbon, Azores, and Madeira. This paper describes observing system simulations for these and other regions. Funding reflects a blend of government, development bank, philanthropic foundation, and commercial contributions. In addition to notable scientific and societal benefits, the telecommunications enterprise’s mission of global connectivity will benefit directly, as environmental awareness improves both the integrity of individual cable systems as well as the resilience of the overall global communications network. SMART cables support the outcomes of a predicted, safe, and transparent ocean as envisioned by the UN Decade of Ocean Science for Sustainable Development and the Blue Economy. As a continuation of the OceanObs’19 conference and community white paper (Howe et al., 2019, 10.3389/fmars.2019.00424), an overview of the SMART programme and a description of the status of ongoing projects are given.

54 ENVIRONMENTAL SCIENCES↗

DisasterAWARE – A Global Alerting Platform for Flood Events

The rising number of flooding events combined with increased urbanization is contributing to significant economic losses due to damages to structures and infrastructures. From a risk reduction and resilience perspective, it is not only essential to forecast flood risk and potential impacts, but also to disseminate the information to stakeholders on the ground for rapid implementation of mitigation and response measures. This paper provides (i) an introduction to DisasterAWARE®, a global alerting system, that is used to disseminate flood risk information to stakeholders across the globe, and (ii) a discussion of the models implemented using earth observation data (Synthetic Aperture Radar and optical imagery) for near real-time assessment of flood severity and potential flood impacts to infrastructures. While the models are still in their nascent stage, a case study implementation of the models for the 2020 flooding event in Africa is presented to showcase the model integration with DisasterAWARE®.

54 ENVIRONMENTAL SCIENCES↗

Development of risk mitigation guidance for sensor placement inside mechanically ventilated enclosures – Phase 1

Guidance on Sensor Placement was identified as the top research priority for hydrogen sensors at the 2018 HySafe Research Priority Workshop on hydrogen safety in the category Mitigation, Sensors, Hazard Prevention, and Risk Reduction. This paper discusses the initial steps (Phase 1) to develop such guidance for mechanically ventilated enclosures. This work was initiated as an international collaborative effort to respond to emerging market needs related to the design and deployment equipment for hydrogen infrastructure that is often installed in individual equipment cabinets or ventilated enclosures. The ultimate objective of this effort is to develop guidance for an optimal sensor placement such that, when integrated into a facility design and operation, will allow earlier detection at lower levels of incipient leaks, leading to significant hazard reduction. Reliable and consistent early warning of hydrogen leaks will allow for the risk mitigation by reducing or even eliminating the probability of escalation of small leaks into large and uncontrolled events. To address this issue, a study of a real-world mechanically ventilated enclosure containing GH2 equipment was conducted, where CFD modeling of the hydrogen dispersion (performed by AVT and UQTR, and independently by the JRC) was validated by the NREL Sensor laboratory using a Hydrogen Wide Area Monitor (HyWAM) consisting of a 10-point gas and temperature measurement analyzer. In the release test, helium was used as a hydrogen surrogate. Expansion of indoor releases to other larger facilities (including parking structures, vehicle maintenance facilities and potentially tunnels) and incorporation into QRA tools, such as HyRAM is planned for Phase 2. It is anticipated that results of this work will be used to inform national and international standards such as NFPA 2 Hydrogen Technologies Code, Canadian Hydrogen Installation Code (CHIC) and relevant ISO/TC 197 and CEN documents.

08 HYDROGEN↗

Optimizing quantification of MK6240 tau PET in unimpaired older adults

Accurate measurement of Alzheimer's disease (AD) pathology in older adults without significant clinical impairment is critical to assessing intervention strategies aimed at slowing AD-related cognitive decline. The U.S. Study to Protect Brain Health Through Lifestyle Intervention to Reduce Risk (POINTER) is a 2-year randomized controlled trial to evaluate the effect of multicomponent risk reduction strategies in older adults (60-79 years) who are cognitively unimpaired but at increased risk for cognitive decline/dementia due to factors such as cardiovascular disease and family history. The POINTER Imaging ancillary study is collecting tau-PET ([ 18 F]MK6240), beta-amyloid (Aβ)-PET ([ 18 F]florbetaben [FBB]) and MRI data to evaluate neuroimaging biomarkers of AD and cerebrovascular pathophysiology in this at-risk sample. Here 481 participants (70.0±5.0; 66% F) with baseline MK6240, FBB and structural MRI scans were included. PET scans were coregistered to the structural MRI which was used to create FreeSurfer-defined reference regions and target regions of interest (ROIs). We also created off-target signal (OTS) ROIs to examine the magnitude and distribution of MK6240 OTS across the brain as well as relationships between OTS and age, sex, and race. OTS was unimodally distributed, highly correlated across OTS ROIs and related to younger age and sex but not race. Aiming to identify an optimal processing approach for MK6240 that would reduce the influence of OTS, we compared our previously validated MRI-guided standard PET processing and 6 alternative approaches. The alternate approaches included combinations of reference region erosion and meningeal OTS masking before spatial smoothing as well as partial volume correction. To compare processing approaches we examined relationships between target ROIs (entorhinal cortex (ERC), hippocampus or a temporal meta-ROI (MetaROI)) SUVR and age, sex, race, Aβ and a general cognitive status measure, the Modified Telephone Interview for Cognitive Status (TICSm). Overall, the processing approaches performed similarly, and none showed a meaningful improvement over standard processing. Across processing approaches we observed previously reported relationships with MK6240 target ROIs including positive associations with age, an Aβ+> Aβ- effect and negative associations with cognition. In sum, we demonstrated that different methods for minimizing effects of OTS, which is highly correlated across the brain within subject, produced no substantive change in our performance metrics. This is likely because OTS contaminates both reference and target regions and this contamination largely cancels out in SUVR data. Caution should be used when efforts to reduce OTS focus on target or reference regions in isolation as this may exacerbate OTS contamination in SUVR data.

60 APPLIED LIFE SCIENCES↗

EHS Health Assessment & Health Action Plan Report (CY 2020)

Sandia National Laboratories (SNL) Employee Health Services (EHS) program believes that good health is essential to getting the most out of life, which is why we offer a variety of worksite wellness programs that put employees in control of their own health. These programs are based on current research and strategies that are proven to minimize risk and decrease the impact of illness through early detection and treatment. Services includes Health Assessments, the Virgin Pulse (VP) online wellness platform, and Health Action Plans (HAP) which include one-on-one education, organizational health initiatives, a video library, an events calendar, onsite fitness facilities, and group fitness classes. Participation in these programs help employees and their spouses earn funding for their Health Reimbursement Accounts (HRAs). The EHS Health Action Plan (HAP) initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. EHS identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans (HAPs). The 2020 Health Action Plans addressed improving upon inadequate sleep, lack of energy, stress, weight, physical inactivity, cardiometabolic issues (hypertension, high cholesterol, diabetes), low back pain, allergies, asthma, digestive health, tobacco use, and living well to maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists, and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months. Just one risk reduction or behavior change can make an impact on the health of the participant’s Division as well as Sandia’s overall risk levels and ultimately its healthcare costs. Sandia employees achieved an Overall Wellness Score of 69 based on the WellSource Health Assessment (the same as last year). A score of 70-100 is considered “Doing Well”, and a score of 40-69 is in the “Caution” category. Overall in CY 2019, Sandia saw a 34% participation rate in Health Action Plan (HAP) programs (up from 33% in CY 2019) with an 89% completion rate (4% lower than CY 2019). Overall, 5,039 (347 more than CY 2019) individuals participated in 8,329 HAPs, which is 1,005 more than the last calendar year (7,324).

59 BASIC BIOLOGICAL SCIENCES↗

Optimizing fluvial flood mitigation strategies: A multi-objective approach for cost-effective and socially-aware infrastructure feasibility analysis

Effective levee planning must balance capital cost, risk reduction, and community priorities. These objectives are rarely optimized together. This study presents a feasibility phase, simulationin-the-loop framework that couples terrain-based flood modeling with a socially aware multiobjective optimizer. Flood risk is measured as Expected Annual Exposed Population (EAEP), obtained by integrating exposure over Annual Exceedance Probability (AEP) nodes, mirroring the Hydrologic Engineering Center's Flood Damage Reduction Analysis (HEC-FDA) expected-annual formulation but with people rather than dollars. Exposure per scenario is computed by overlaying binary inundation masks with a population surface at the tract level. Distributional fairness is encoded through a Group Benefit Share (GBS) constraint that requires high-SVI tracts to receive at least a baseline share of annualized benefits. Capital cost is represented by a height-dependent unit-cost model suitable for screening. This study addresses the two-objective problem, minimize cost and expected annual exposure subject to the GBS constraint, using Non-Dominated Sorting Genetic Algorithm II (NSGA-II) and leveraging Pareto front for feasibility phase decision making. Implemented with terrain-based flood modeling, GeoFlood, for rapid scenario evaluation, the framework is demonstrated in Southeast Texas. The results reveal clear trade-offs among cost, risk, and social benefits and identify non-dominated levee height configurations that satisfy the benefit-share floor. The contributions are a scalable decision support method that operationalizes expected annual population-based risk, embeds enforceable benefit-sharing guarantees, and uses lightweight simulation to explore large design spaces before higher fidelity design stages.

Flood mitigation↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Improved Risk Priority Measure for the Management of Project Risk

Monte Carlo-based project risk models are essential tools in project risk management, particularly for large, complex projects in which it is difficult to glean intuitively the importance of individual risks to the overall project. Conventional correlation-based methods for measuring the importance of contributing risks in such models are argued here to be both statistically flawed and unintuitive in the importance metrics they produce. Drawing on and adapting methods more traditionally associated with engineering risk models, Risk Reduction Worth (RRW) is introduced as an importance measure. RRW is shown to be statistically robust and provide an easily interpretable, quantitative measure of the importance of a risk to the overall performance of a project; specifically, measuring the extent to which removal of a risk would improve confidence in project outcomes. To ensure practicality of the method, an approach is described in which RRWs can be produced for all contributing risks based on a single Monte Carlo sample. This is demonstrated through application to a large, complex project risk model from which intuitive risk importance insights provide a robust, transparent basis for the allocation of risk management resources.

Risk↗

Evaluation of the Los Alamos Nuclear Material Packaging Risk Ranking Method

Repackaging nuclear material into robust containers to protect workers and the public has been ongoing at LANL and around the DOE complex for nearly two decades. The number of containers at LANL is around 5,000; limited resources for repackaging material has led to extended repackaging campaigns and the need to prioritize repackaging. Various methodologies have been used to prioritize the repackaging efforts and to demonstrate progress in risk reduction over time (e.g., Boerigter, 1997). The 2000-1 DNFSB recommendation recognized the limited DOE resources for repackaging, and acknowledged the need to “prioritize and schedule tasks to be undertaken with available funds according to consideration of risks.” Later, in DNFSB recommendation 2005-1, in addition to recommending that DOE develop a packaging standard, the Board recommended that “Characterization information should also be used to develop a surveillance program prioritized according to expected material and container risk (including, for example, material type, material form, and the age and type of container).” In response to requests and recommendations from the DOE and DNSFB to prioritize according to worker risk, a risk ranking method based on the potential consequence of dropping a container from 3 meters was developed in 2007 (Smith, 2007) and updated in 2014 (Hoffman, 2014). Various LANL implementation plans for repackaging were developed over the years using this methodology (Stone, 2014). Currently, this method is utilized in conjunction with an algorithm to mitigate programmatic risk to prioritize container repackaging and material processing (Prochnow, 2015). The purpose of this study is to document how the current risk ranking method works, how it is used and potential limitations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quantitative Risk Assessment for Fuel Cell Electric Bus Hydrogen Storage and Refueling Facility

It is necessary to understand the safety implications and risk mitigation options for fuel cell electric bus fleet deployment, especially for related facilities responsible for operations such as production, storage, compression, and dispensing of hydrogen for use by the buses. In this report, we present a quantitative risk assessment for a potential fuel cell electric bus fleet that was motivated by efforts to improve resilience at the Portland International Airport but can be applicable to a range of hydrogen case studies and use cases. We estimated risk for a facility that produces, stores, compresses, and dispenses hydrogen for the fleet of buses, with a focus on individual risk to people in terms of annual frequency of fatality. We considered the frequency of hydrogen leaks that could result in harmful physical outcomes like jet fires or explosions, and the consequences of those outcomes for people. We created customized fault trees to calculate the frequencies of different sizes of leaks and event sequence diagrams to calculate ignition probabilities for the various leak sizes. We also leveraged the HyRAM+ toolkit to use these inputs to calculate overall risk for the facility, which we separated into one section responsible for producing, storing, and compressing hydrogen, and one section responsible for dispensing the hydrogen to the buses. We found that the dispensing area seemed to have a higher risk than the production/storage/compression area of the facility, largely because of the inclusion of a component with a high leak frequency (the heat exchanger used to cool the hydrogen before entering the vehicle, to prevent overheating and expansion of hydrogen in the onboard tank). For the example production and refueling facility we evaluated and the data we used for the analysis, the leak frequency had a larger impact on the risk differences between the two sections on the facility, compared to the physical outcome consequence, which was slightly different due to the varying fuel conditions, but not substantially different. Actions can be taken to prevent these hazards (e.g., lowering leak frequencies in system components) or to mitigate the consequences if they do occur (e.g., installing barriers to protect people if ignition events occur). The choice of which actions to take depends not only on safety considerations but also on space, time, staffing, feasibility, and financial constraints. Therefore, the quantitative risk assessment approach can help understand relative risk contributions from different components, leak sizes, consequences, and human actions, to prioritize risk reduction strategies and balance these parameters. The outcomes of this report may be useful for a variety of stakeholders working in the hydrogen, transportation, vehicle, and aviation sector, including those responsible for aspects like facility design, operations, and regulations. There is not a single value of risk that determines whether a hypothetical system is “safe” or not. The insights about risk mitigations may be leveraged, and the quantitative risk assessment approach can be applied to other case studies to understand risk priorities and contributions specific to different FCEB and hydrogen facility uses.

08 HYDROGEN↗

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

Geothermal District Heating in the United States: 2021 Update

As of 2021, there are 23 geothermal district heating (GDH) systems in the United States. Most are over 30 years old. This paper presents an overview of GDH development in the United States and the performance of GDH systems over time. Calculations of the estimated levelized cost of heat (LCOH) for existing U.S. GDH systems were made using NREL's GEOPHIRES tool. Estimated LCOH for existing U.S. GDH systems ranges from $15 to $105/MWhth. This paper explores other factors in GDH development such as resource and system size, capacity factor, and the role of policy. U.S. GDH utilization and deployment are compared to worldwide trends. Results show that the market for GDH in the United States has been weak over the past 40 years due to the combination of inexpensive fossil fuel alternatives (mostly natural gas), lack of incentives focused on heating/cooling, and other factors. Future opportunities for increased GDH deployment in the United States related to increased demand for low-carbon heating and cooling solutions (driven by decarbonization goals in the residential, commercial and industrial heating/cooling sectors, and particularly aggressive ones on college campuses) are outlined. Lastly, this paper identifies policy mechanisms that have been implemented in other countries to incentivize GDH (such as financial incentives targeting GDH, geothermal risk reduction mechanisms, carbon prices benefiting low-carbon heat production, and others).

geothermal district heating↗

Increasing Reliability and Safety of Hydrogen Components - Reliability Data Collection

Come learn about the new Hydrogen Component Reliability Database (HyCReD) and participate in discussions on hydrogen component reliability data collection, collaboration, and analysis. Funded by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy under the Hydrogen and Fuel Cell Technologies Office, HyCReD is a collaborative project between the National Renewable Energy Laboratory, the University of Maryland, and hydrogen stakeholders to improve safety reliability for hydrogen facilities by integrating risk reduction methodologies and component reliability data taxonomies that support hydrogen infrastructure failure rate analysis.

component↗

Hydrogen Component Reliability Database (HyCReD)

The Hydrogen Component Reliability Database (HyCReD) is a collaborative project between the National Renewable Energy Laboratory, the University of Maryland, and hydrogen stakeholders to improve safety reliability for hydrogen facilities by integrating risk reduction methodologies and component reliability data taxonomies that support hydrogen infrastructure failure rate analysis.

availability↗