Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk objectives”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Risk Management of Jettisoned Objects in LEO

The construction and maintenance of the International Space Station (ISS) has led to the release of many objects into its orbital plane, usually during the course of an extra-vehicular activity (EVA). Such releases are often unintentional, but in a growing number of cases, the jettison has been intentional, conducted after a careful assessment of the net risk to the partnership and to other objects in space. Since its launch in 1998 the ISS has contributed on average at least one additional debris object that is simultaneously in orbit with the station, although the number varies widely from zero to eight at any one moment. All of these objects present potential risks to other objects in orbit. Whether it comes from known and tracked orbiting objects or from unknown or untrackable objects, collision with orbital debris can have disastrous consequences. Objects greater than 10cm are generally well documented and tracked, allowing orbiting spacecraft or satellites opportunities to perform evasive maneuvers (commonly known as Debris Avoidance Maneuvers, or DAMs) in the event that imminent collision is predicted. The issue with smaller debris; however, is that it is too numerous to be tracked effectively and yet still poses disastrous consequences if it intercepts a larger object. Due to the immense kinetic energy of any item in orbit, collision with debris as small as 1cm can have catastrophic consequences for many orbiting satellites or spacecraft. Faced with the growing orbital debris threat and the potentially catastrophic consequences of a collision-generated debris shower originating in an orbit crossing the ISS altitude band, in 2007 the ISS program manger asked program specialists to coordinate a multilateral jettison policy amongst the ISS partners. This policy would define the acceptable risk trade rationale for intentional release of a debris object, and other mandatory constraints on such jettisons to minimize the residual risks whenever a jettison was accepted. Although ISS-related debris often presents untenable risks to the EVA crew, IVA crew, or to a departing cargo vehicle for a controlled disposal, such released objects also present a ballistic nuisance to the visiting vehicle traffic, and a potential fragmentation threat to the hundreds of other functional and debris objects whose perigees lie below the ISS orbital altitude. Thus, every such jettison decision is a conscious risk trade.

Bacon, John B.↗

Predictors of Recurrent Biliary Obstruction Following Percutaneous Uncovered Metal Stent Insertion in Patients with Distal Malignant Biliary Obstruction: An Analysis Using a Competing Risk Model

Objective: To evaluate predictive factors of recurrent biliary obstruction (RBO) following percutaneous uncovered metal stent placement for unresectable distal malignant biliary obstruction (MBO) by using a competing risk model. Materials and Methods: Between March 2012 and March 2016, 119 patients underwent percutaneous uncovered metal stent placement with distal MBO at our institution. Univariate and multivariate analyses were conducted to identify the prognostic factors for RBO using a competing risk model. Results: The median overall survival period was 170 days (range 19–775 days). Recurrent biliary obstruction before death was observed in 34 patients (28.6%). The 3-, 6-, and 12-month cumulative incidences of RBO were 14.3%, 21.0%, and 27.7%, respectively. A multivariate analysis indicated that ampullary carcinoma compared with metastatic carcinoma (hazard ratio [HR] = 4.86; 95% confidence interval [CI], 1.74–13.54; P = 0.003) and a stent insertion above the sphincter of Oddi (HR 2.49; 95% CI, 1.11–5.62; P = 0.028) were the independent risk factors for RBO when we considered death to be a competing risk. Conclusion: Ampullary carcinoma and stent insertion above the sphincter of Oddi were risk factors for RBO in these patients who received percutaneous transhepatic stent placement.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Managing Risk for Cassini During Mission Operations and Data Analysis (MOandDA)

A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working put into place will become visible and will be illusmted in future papers.

risk management↗

Analytical Framework for Rodent/NHP Data Set Utilization to Inform Human CNS Risk Estimation

Objectives Review and inform on tactics to analyze & communicate data from animal research (e.g., rodents, mini-pigs, NHPs, et al) exposed to single and combinations of spaceflight hazards, using NASA’s Human System Risk Board (HSRB) process for the Behavioral Medicine Risk - To quantitatively inform Behavioral Medicine Risk posture - i.e., likelihood (L) and consequence (C) - To help inform estimation of crew health standards for operational task performance (i.e., Fitness For Duty, Space Permissible Exposure Levels, Permissible Operational Limits).

Brain↗

Patterns of Recurrence After Low-Dose-Rate Prostate Brachytherapy: A Population-Based Study of 2223 Consecutive Low- and Intermediate-Risk Patients

Objectives: This study examined patterns of recurrence after low–dose-rate prostate brachytherapy (LDR-PB), estimated local recurrence rate and compared that rate to the estimated local recurrence rate after radical prostatectomy (RP). Methods and Materials: A prospective database was maintained with clinical, dosimetric, and outcome data for all LDR-PB implantation procedures performed at our institution. From 1998 to 2008, 2223 patients with prostate cancer received LDR-PB without supplemental external beam radiation therapy. Patients who developed Phoenix-defined biochemical failure were reviewed for sites of relapse and investigations completed. Results: At a median follow-up of 5 years, 108 of 2223 patients (4.8%) developed biochemical relapse. In 1 additional patient, local relapse was found on transurethral prostate resection, but his prostate-specific antigen concentration was well short of triggering Phoenix-defined failure. Of the 109 patients with disease relapse, 18 of 2223 (0.8%) had a proven local recurrence, and 30 of 2223 (1.3%) had a proven distant recurrence. The remaining 61 of 2223 patients (2.7%) had unidentified sites of recurrence; of these, 57 patients (93%) had digital rectal examinations (DREs), 18 (30%) had post-treatment biopsies, 45 (74%) had bone scans, and 34 (56%) had computed tomography imaging of the abdomen and pelvis. If every biochemical failure were local, the local recurrence rate would be as high as 4.9%; however, by excluding those with proven distant failure and those with both a negative DRE and biopsy, we estimate that the local recurrence rate is 2.7% or less. Conclusions: In the context of limitations of the study design, our population-based analysis indicates that the local recurrence rate after LDR-PB is as low or lower than that after RP in our jurisdiction.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The Sensor Test for Orion RelNav Risk Mitigation (STORRM) Development Test Objective

The Sensor Test for Orion Relative-Navigation Risk Mitigation (STORRM) Development Test Objective (DTO) flew aboard the Space Shuttle Endeavour on STS-134 in May- June 2011, and was designed to characterize the performance of the flash LIDAR and docking camera being developed for the Orion Multi-Purpose Crew Vehicle. The flash LIDAR, called the Vision Navigation Sensor (VNS), will be the primary navigation instrument used by the Orion vehicle during rendezvous, proximity operations, and docking. The DC will be used by the Orion crew for piloting cues during docking. This paper provides an overview of the STORRM test objectives and the concept of operations. It continues with a description of STORRM's major hardware components, which include the VNS, docking camera, and supporting avionics. Next, an overview of crew and analyst training activities will describe how the STORRM team prepared for flight. Then an overview of in-flight data collection and analysis is presented. Key findings and results from this project are summarized. Finally, the paper concludes with lessons learned from the STORRM DTO.

Christian, John A.↗

Approach to proliferation risk assessment based on multiple objective analysis framework

The approach to the assessment of proliferation risk using the methods of multi-criteria decision making and multi-objective optimization is presented. The approach allows the taking into account of the specifics features of the national nuclear infrastructure, and possible proliferation strategies (motivations, intentions, and capabilities). 3 examples of applying the approach are shown. First, the approach has been used to evaluate the attractiveness of HEU (high enriched uranium)production scenarios at a clandestine enrichment facility using centrifuge enrichment technology. Secondly, the approach has been applied to assess the attractiveness of scenarios for undeclared production of plutonium or HEU by theft of materials circulating in nuclear fuel cycle facilities and thermal reactors. Thirdly, the approach has been used to perform a comparative analysis of the structures of developing nuclear power systems based on different types of nuclear fuel cycles, the analysis being based on indicators of proliferation risk.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Improving Estimation of Ground Casualty Risk From Reentering Space Objects

A recent improvement to the long-term estimation of ground casualties from reentering space debris is the further refinement and update to the human population distribution. Previous human population distributions were based on global totals with simple scaling factors for future years, or a coarse grid of population counts in a subset of the world's countries, each cell having its own projected growth rate. The newest population model includes a 5-fold refinement in both latitude and longitude resolution. All areas along a single latitude are combined to form a global population distribution as a function of latitude, creating a more accurate population estimation based on non-uniform growth at the country and area levels. Previous risk probability calculations used simplifying assumptions that did not account for the ellipsoidal nature of the Earth. The new method uses first, a simple analytical method to estimate the amount of time spent above each latitude band for a debris object with a given orbit inclination and second, a more complex numerical method that incorporates the effects of a non-spherical Earth. These new results are compared with the prior models to assess the magnitude of the effects on reentry casualty risk.

Ostrom, Chris L.↗

Improving Estimation of Ground Casualty Risk from Reentering Space Objects

A recent improvement to the long-term estimation of ground casualties from reentering space debris is the further refinement and update to the human population distribution. Previous human population distributions were based on global totals with simple scaling factors for future years, or a coarse grid of population counts in a subset of the world's countries, each cell having its own projected growth rate. The newest population model includes a 5-fold refinement in both latitude and longitude resolution. All areas along a single latitude are combined to form a global population distribution as a function of latitude, creating a more accurate population estimation based on non-uniform growth at the country and area levels. Previous risk probability calculations used simplifying assumptions that did not account for the ellipsoidal nature of the earth. The new method uses first, a simple analytical method to estimate the amount of time spent above each latitude band for a debris object with a given orbit inclination, and second, a more complex numerical method that incorporates the effects of a non-spherical Earth. These new results are compared with the prior models to assess the magnitude of the effects on reentry casualty risk.

Ostrom, C.↗

Constellation Program Flight Test Methodology and Strategy

Main projects elements: a) Orion & Ares b) New & Modified heritage hardware. c) Shuttle retirement in 2010. Methodology: a) Flight test objectives. b) Risk reduction. Strategy a) Mapping Flight Test Objectives. b) Build incremental capability.

Vigil, Art↗

RISK-INFORMED BALANCING OF SAFETY, NONPROLIFERATION, AND ECONOMICS FOR THE SFR

A substantial barrier to the implementation of Sodium-cooled Fast Reactor (SFR) technology in the short term is the perception that they would not be economically competitive with advanced light water reactors. With increased acceptance of risk-informed regulation, the opportunity exists to reduce the costs of a nuclear power plant at the design stage without applying excessive conservatism that is not needed in treating low risk events. In the report, NUREG-1860, the U.S. Nuclear Regulatory Commission describes developmental activities associated with a risk-informed, scenario-based technology neutral framework (TNF) for regulation. It provides quantitative yardsticks against which the adequacy of safety risks can be judged. We extend these concepts to treatment of proliferation risks. The objective of our project is to develop a risk-informed design process for minimizing the cost of electricity generation within constraints of adequate safety and proliferation risks. This report describes the design and use of this design optimization process within the context of reducing the capital cost and levelized cost of electricity production for a small (possibly modular) SFR. Our project provides not only an evaluation of the feasibility of a risk-informed design process but also a practical test of the applicability of the TNF to an actual advanced, non-LWR design. The report provides results of five safety related and one proliferation related case studies of innovative design alternatives. Applied to previously proposed SFR nuclear energy system concepts We find that the TNF provides a feasible initial basis for licensing new reactors. However, it is incomplete. We recommend improvements in terms of requiring acceptance standards for total safety risks, and we propose a framework for regulation of proliferation risks. We also demonstrate methods for evaluation of proliferation risks. We also suggest revisions to scenario-specific safety risk acceptance standards, particularly concerning seismic and aircraft impactrelated risks. Most importantly, within the context of the TNF historical SFR safety concerns about energetic core disruptive accidents are seen to be unimportant, but those of rare scenarios mentioned above are seen to be of dominant concern. In terms of proliferation risks the SFR energy system is seen not to be of considerably greater concern than with other nuclear power technologies, providing that highly effective safeguards are employed. We find the economic performance of proposed SFRs likely, due to the problems of using sodium as a coolant, to be inferior to those of LWRs unless they can be credited for services to improve nuclear waste disposal, nuclear fuel utilization and proliferation risk reductions. None of the design innovations investigated offers the promise to reverse this conclusion. The most promising innovation investigated is that of improving the plant's thermodynamic efficiency via use of the supercritical CO{sub 2} (rather than steam Rankine) power conversion system. We were unable to reach conclusions about the economic and proliferation risk implications of competing nuclear fuel processing methods, as available designs are too little developed to justify any such results. Overall, we find the SFR to be a promising alternative to LWRs should the conditions governing the valuation change substantially from current ones.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the moon and eventually enable a human Mars mission. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the crew health and performance (CHP) research and technology development (R&D) necessary to enable these future missions. These organizations include flight programs as well as other organizations such as the Health and Medical Technical Authority (HMTA), Human Research Program, Space Technology Mission Directorate, and System Capability Leadership Teams, each of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for the management of risks and strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA for identifying and prioritizing R&D needs. Alignment and evolution of these strategic planning constructs is ongoing and will allow for alignment and traceability between M2M objectives and R&D investments at a detailed level. While this reorganization is ongoing, and even after it is established, there is a recognized need among stakeholder organizations to identify and communicate the highest CHP R&D priorities in a unified and digestible way that synthesizes the considerations and perspectives of the CHP community across NASA. To achieve this, the HMTA facilitated a series of group discussions with representatives of NASA’s CHP community, which culminated in a product identifying the eight highest priority mission-enabling CHP capabilities for human missions to Mars, referred to as the “Top Human System Capability Needs for Mars”. The list includes Earth-Independent Human Operations; Mars Duration Food System; Mars Duration Effects on Human Physiology; Risks Mitigations for Vehicle Atmospheres; Computational Injury & Anthropometric Models; Exploration Exercise Countermeasures; Individual Variability in Responses to Spaceflight; and Sensorimotor Countermeasures. Existing strategic planning and risk management tools and processes were considered, as well as practicalities of technical, cost, and schedule feasibility associated with potential R&D risk mitigations and technology solutions. The product is not owned by any one organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. It is anticipated that this list will be re-evaluated periodically based on R&D progress and the evolving M2M architecture.

Life Support↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

Space Station crew safety alternatives study. Volume 5: Space Station safety plan

The Space Station Safety Plan has been prepared as an adjunct to the subject contract final report, suggesting the tasks and implementation procedures to ensure that threats are addressed and resolution strategy options identified and incorporated into the space station program. The safety program's approach is to realize minimum risk exposure without levying undue design and operational constraints. Safety objectives and risk acceptances are discussed.

Mead, G. H.↗

Got risk? risk-centric perspective for spacecraft technology decision-making

A risk-based decision-making methodology conceived and developed at JPL and NASA has been used to aid in decision making for spacecraft technology assessment, adoption, development and operation. It takes a risk-centric perspective, through which risks are used as a reasoning step to interpose between mission objectives and risk mitigation measures.

risk↗

Uncertainties in Estimates of the Risks of Late Effects from Space Radiation

The health risks faced by astronauts from space radiation include cancer, cataracts, hereditary effects, and non-cancer morbidity and mortality risks related to the diseases of the old age. Methods used to project risks in low-Earth orbit are of questionable merit for exploration missions because of the limited radiobiology data and knowledge of galactic cosmic ray (GCR) heavy ions, which causes estimates of the risk of late effects to be highly uncertain. Risk projections involve a product of many biological and physical factors, each of which has a differential range of uncertainty due to lack of data and knowledge. Within the linear-additivity model, we use Monte-Carlo sampling from subjective uncertainty distributions in each factor to obtain a Maximum Likelihood estimate of the overall uncertainty in risk projections. The resulting methodology is applied to several human space exploration mission scenarios including ISS, lunar station, deep space outpost, and Mar's missions of duration of 360, 660, and 1000 days. The major results are the quantification of the uncertainties in current risk estimates, the identification of factors that dominate risk projection uncertainties, and the development of a method to quantify candidate approaches to reduce uncertainties or mitigate risks. The large uncertainties in GCR risk projections lead to probability distributions of risk that mask any potential risk reduction using the "optimization" of shielding materials or configurations. In contrast, the design of shielding optimization approaches for solar particle events and trapped protons can be made at this time, and promising technologies can be shown to have merit using our approach. The methods used also make it possible to express risk management objectives in terms of quantitative objective's, i.e., the number of days in space without exceeding a given risk level within well defined confidence limits.

Cucinotta, F. A.↗

Risk-based Prioritization of Facility Decommissioning and Environmental Restoration Projects in the National Nuclear Legacy Liabilities Program at the Chalk River Laboratory - 13564

Chalk River Laboratory (CRL), located in Ontario Canada, has a large number of remediation projects currently in the Nuclear Legacy Liabilities Program (NLLP), including hundreds of facility decommissioning projects and over one hundred environmental remediation projects, all to be executed over the next 70 years. Atomic Energy of Canada Limited (AECL) utilized WorleyParsons to prioritize the NLLP projects at the CRL through a risk-based prioritization and ranking process, using the WorleyParsons Sequencing Unit Prioritization and Estimating Risk Model (SUPERmodel). The prioritization project made use of the SUPERmodel which has been previously used for other large-scale site prioritization and sequencing of facilities at nuclear laboratories in the United States. The process included development and vetting of risk parameter matrices as well as confirmation/validation of project risks. Detailed sensitivity studies were also conducted to understand the impacts that risk parameter weighting and scoring had on prioritization. The repeatable prioritization process yielded an objective, risk-based and technically defendable process for prioritization that gained concurrence from all stakeholders, including Natural Resources Canada (NRCan) who is responsible for the oversight of the NLLP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗