Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

Paul S. Ray↗

Managing Lunar and Mars Mission Radiation Risks: Cancer Risks, Uncertainties, and Shielding Effectiveness - Part 1

This document addresses calculations of probability distribution functions (PDFs) representing uncertainties in projecting fatal cancer risk from galactic cosmic rays (GCR) and solar particle events (SPEs). PDFs are used to test the effectiveness of potential radiation shielding approaches. Monte-Carlo techniques are used to propagate uncertainties in risk coefficients determined from epidemiology data, dose and dose-rate reduction factors, quality factors, and physics models of radiation environments. Competing mortality risks and functional correlations in radiation quality factor uncertainties are treated in the calculations. The cancer risk uncertainty is about four-fold for lunar and Mars mission risk projections. For short-stay lunar missins (<180 d), SPEs present the most significant risk, but one effectively mitigated by shielding. For long-duration (>180 d) lunar or Mars missions, GCR risks may exceed radiation risk limits. While shielding materials are marginally effective in reducing GCR cancer risks because of the penetrating nature of GCR and secondary radiation produced in tissue by relativisitc particles, polyethylene or carbon composite shielding cannot be shown to significantly reduce risk compared to aluminum shielding. Therefore, improving our knowledge of space radiobiology to narrow uncertainties that lead to wide PDFs is the best approach to ensure radiation protection goals are met for space exploration.

Cucinotta, Francis A.↗

Risky Business: The Science and Art of Radiation Risk Communication in the High Risk Context of Space Travel

Successfully communicating the complex risks associated with radiation exposure is a difficult undertaking; communicating those risks within the high-risk context of space travel is uniquely challenging. Since the potential risks of space radiation exposure are not expected to be realized until much later in life, it is hard to draw comparisons between other spaceflight risks such as hypoxia and microgravity-induced bone loss. Additionally, unlike other spaceflight risks, there is currently no established mechanism to mitigate the risks of incurred radiation exposure such as carcinogenesis. Despite these challenges, it is the duty of the Space Radiation Analysis Group (SRAG) at NASA's Johnson Space Center to provide astronauts with the appropriate information to effectively convey the risks associated with exposure to the space radiation environment. To this end, astronauts and their flight surgeons are provided with an annual radiation risk report documenting the astronaut's individual radiation exposures from space travel, medical, and internal radiological procedures throughout the astronaut's career. In an effort to improve this communication and education tool, this paper critically reviews the current report style and explores alternative report styles to define best methods to appropriately communicate risk to astronauts, flight surgeons, and management.

Elgart, Shona Robin↗

Task 12 PV Sustainability - Human Health Risk Assessment Methods for PV, Part 3: Module Disposal Risks

End-of-life management is important for addressing large future photovoltaic (PV) waste volumes and conserving raw materials for use in new PV modules. In regions without regulatory mandates for PV recycling, end-of-life PV modules can be disposed in accordance with general waste laws. Given the use of various metals as raw materials in semiconductor compounds and electrical contacts in commercial PV modules, some stakeholders have raised concerns regarding potential environmental impacts if PV modules are subject to improper disposal instead of being recycled or disposed in sanitary landfills, as is required in most world regions. To evaluate these concerns, screening-level risk assessment methods are developed herein that evaluate potential human health risks from groundwater and surface (air, soil, surface water) exposure pathways. The methods estimate potential impacts from disposal of end-of-life (EOL) PV modules in non-sanitary landfills under the following worst-case conditions: no leachate collection or groundwater monitoring, no liner for preventing leachate migration, uncovered waste, and lack of stormwater management. Examining worst-case conditions allows the exploration of maximum potential risk to attempt to ensure disposal does not increase health risk above regulatory thresholds. Specifically, this report presents an analysis of potential human health risks associated with non-sanitary landfill disposal for three PV technologies, focusing on release of the highest-prioritized chemical element for each: lead (Pb) in crystalline-silicon (c-Si) PV modules, cadmium (Cd) in thin film cadmium telluride (CdTe) PV modules, and selenium (Se) in thin film copper indium selenide (CIS) PV modules. The prioritization of these chemical elements for analysis is based on stakeholder interest. Because the methodology is chemical-specific, the risk assessment results for these chemicals cannot be directly generalized to other chemicals, although the risk assessment methodology can be applied to other chemicals. If the chemicals chosen are indeed the ones presenting greatest risk, then the results herein should represent the upper bound of health risk from exposure to a single constituent.

14 SOLAR ENERGY↗

Program Risk Planning with Risk as a Resource

The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.

Ray, Paul S.↗

Assessing the Relative Risk of Aerocapture Using Probabalistic Risk Assessment

A recent study performed for the Aerocapture Technology Area in the In-Space Propulsion Technology Projects Office at the Marshall Space Flight Center investigated the relative risk of various capture techniques for Mars missions. Aerocapture has been proposed as a possible capture technique for future Mars missions but has been perceived by many in the community as a higher risk option as compared to aerobraking and propulsive capture. By performing a probabilistic risk assessment on aerocapture, aerobraking and propulsive capture, a comparison was made to uncover the projected relative risks of these three maneuvers. For mission planners, this knowledge will allow them to decide if the mass savings provided by aerocapture warrant any incremental risk exposure. The study focuses on a Mars Sample Return mission currently under investigation at the Jet Propulsion Laboratory (JPL). In each case (propulsive, aerobraking and aerocapture), the Earth return vehicle is inserted into Martian orbit by one of the three techniques being investigated. A baseline spacecraft was established through initial sizing exercises performed by JPL's Team X. While Team X design results provided the baseline and common thread between the spacecraft, in each case the Team X results were supplemented by historical data as needed. Propulsion, thermal protection, guidance, navigation and control, software, solar arrays, navigation and targeting and atmospheric prediction were investigated. A qualitative assessment of human reliability was also included. Results show that different risk drivers contribute significantly to each capture technique. For aerocapture, the significant drivers include propulsion system failures and atmospheric prediction errors. Software and guidance hardware contribute the most to aerobraking risk. Propulsive capture risk is mainly driven by anomalous solar array degradation and propulsion system failures. While each subsystem contributes differently to the risk of each technique, results show that there exists little relative difference in the reliability of these capture techniques although uncertainty for the aerocapture estimates remains high given the lack of in-space demonstration.

Percy, Thomas K.↗

Taking the Risk Out of Risk Assessment

The ability to understand risks and have the right strategies in place when risky events occur is essential in the workplace. More and more organizations are being confronted with concerns over how to measure their risks or what kind of risks they can take when certain events transpire that could have a negative impact. NASA is one organization that faces these challenges on a daily basis, as effective risk management is critical to the success of its missions especially the Space Shuttle missions. On July 29, 1996, former NASA Administrator Daniel Goldin charged NASA s Office of Safety and Mission Assurance with developing a probabilistic risk assessment (PRA) tool to support decisions on the funding of Space Shuttle upgrades. When issuing the directive, Goldin said, "Since I came to NASA [in 1992], we've spent billions of dollars on Shuttle upgrades without knowing how much they improve safety. I want a tool to help base upgrade decisions on risk." Work on the PRA tool began immediately. The resulting prototype, the Quantitative Risk Assessment System (QRAS) Version 1.0, was jointly developed by NASA s Marshall Space Flight Center, its Office of Safety and Mission Assurance, and researchers at the University of Maryland. QRAS software automatically expands the reliability logic models of systems to evaluate the probability of highly detrimental outcomes occurring in complex systems that are subject to potential accident scenarios. Even in its earliest forms, QRAS was used to begin PRA modeling of the Space Shuttle. In parallel, the development of QRAS continued, with the goal of making it a world-class tool, one that was especially suited to NASA s unique needs. From the beginning, an important conceptual goal in the development of QRAS was for it to help bridge the gap between the professional risk analyst and the design engineer. In the past, only the professional risk analyst could perform, modify, use, and perhaps even adequately understand PRA. NASA wanted to change this by developing a PRA tool that would be friendlier, more understandable, and more useful to the broader engineering community. This concept ultimately led to the look, feel, and functionality that QRAS has today.

Source record↗

Control of Risks Through the Use of Procedures: A Method for Evaluating the Change in Risk

This paper considers how procedures can be used to control risks faced by an organization and proposes a means of recognizing if a particular procedure reduces risk or contributes to the organization's exposure. The proposed method was developed out of the review of work documents and the governing procedures performed in the wake of the Columbia accident by NASA and the Space Shuttle prime contractor, United Space Alliance, LLC. A technique was needed to understand the rules, or procedural controls, in place at the time in the context of how important the role of each rule was. The proposed method assesses procedural risks, the residual risk associated with a hazard after a procedure's influence is accounted for, by considering each clause of a procedure as a unique procedural control that may be beneficial or harmful. For procedural risks with consequences severe enough to threaten the survival of the organization, the method measures the characteristics of each risk on a scale that is an alternative to the traditional consequence/likelihood couple. The dual benefits of the substitute scales are that they eliminate both the need to quantify a relationship between different consequence types and the need for the extensive history a probabilistic risk assessment would require. Control Value is used as an analog for the consequence, where the value of a rule is based on how well the control reduces the severity of the consequence when operating successfully. This value is composed of two parts: the inevitability of the consequence in the absence of the control, and the opportunity to intervene before the consequence is realized. High value controls will be ones where there is minimal need for intervention but maximum opportunity to actively prevent the outcome. Failure Likelihood is used as the substitute for the conventional likelihood of the outcome. For procedural controls, a failure is considered to be any non-malicious violation of the rule, whether intended or not. The model used for describing the Failure Likelihood considers how well a task was established by evaluating that task on five components. The components selected to define a well established task are: that it be defined, assigned to someone capable, that they be trained appropriately, that the actions be organized to enable proper completion and that some form of independent monitoring be performed. Validation of the method was based on the information provided by a group of experts in Space Shuttle ground processing when they were presented with 5 scenarios that identified a clause from a procedure. For each scenario, they recorded their perception of how important the associated rule was and how likely it was to fail. They then rated the components of Control Value and Failure Likelihood for all the scenarios. The order in which each reviewer ranked the scenarios Control Value and Failure Likelihood was compared to the order in which they ranked the scenarios for each of the associated components; inevitability and opportunity for Control Value and definition, assignment, training, organization and monitoring for Failure Likelihood. This order comparison showed how the components contributed to a relative relationship to the substitute risk element. With the relationship established for Space Shuttle ground processing, this method can be used to gauge if the introduction or removal of a particular rule will increase or decrease the .risk associated with the hazard it is intended to control.

Praino, Gregory T.↗

Integration of the Cardiovascular Clinical Risk Prediction Model Astro-CHARM Into the NASA Radiation Risk Model

Space radiation poses an increased risk for cardiovascular diseases (CVD) during and after spaceflight, that should be quantified to plan future space missions such as the flight to Mars. The radiation-induced CVD risk is evaluated using a linear no-threshold dose response excess relative risk (ERR) model, so that the risk is function of the radiation dose and of the background (i.e., non-exposed) incidence rate. The background CVD risk can be evaluated using clinical prediction models (CPMs). The first CPMs developed in the 1960’s have identified CVD risk factors such as blood pressure, diabetes, cholesterol, and smoking. In this work, the steps used to integrate the CVD risk provided by a CPM into the NASA Radiation Risk Model are described. Simulation results calculated using available data for relevant mission scenarios are also shown, and the challenges in CVD risk predictions are discussed.

I Plante↗

Integration of the Cardiovascular Risk Model Astro-CHARM in the NASA Radiation Risk Model

Space radiation poses an increased risk for cardiovascular diseases (CVD) during and after spaceflight, that should be quantified to plan future space missions such as the flight to Mars. The radiation-induced CVD risk is evaluated using a linear no-threshold dose response excess relative risk (ERR) model, so that the risk is function of the radiation dose and of the background (i.e., non-exposed) incidence rate. The background CVD risk can be evaluated using clinical prediction models (CPMs). The first CPMs developed in the 1960’s have identified CVD risk factors such as blood pressure, diabetes, cholesterol, and smoking. In this work, the steps used to integrate the CVD risk provided by a CPM into the NASA Radiation Risk Model are described. Simulation results calculated using available data for relevant mission scenarios are also shown, and the challenges in CVD risk predictions are discussed.

Space radiation↗

Validation of a Proteomic Signature of Lung Cancer Risk from Bronchial Specimens of Risk-Stratified Individuals

A major challenge in lung cancer prevention and cure hinges on identifying the at-risk population that ultimately develops lung cancer. Previously, we reported proteomic alterations in the cytologically normal bronchial epithelial cells collected from the bronchial brushings of individuals at risk for lung cancer. The purpose of this study is to validate, in an independent cohort, a selected list of 55 candidate proteins associated with risk for lung cancer with sensitive targeted proteomics using selected reaction monitoring (SRM). Bronchial brushings collected from individuals at low and high risk for developing lung cancer as well as patients with lung cancer, from both a subset of the original cohort (batch 1: n = 10 per group) and an independent cohort of 149 individuals (batch 2: low risk (n = 32), high risk (n = 34), and lung cancer (n = 83)), were analyzed using multiplexed SRM assays. ALDH3A1 and AKR1B10 were found to be consistently overexpressed in the high-risk group in both batch 1 and batch 2 brushing specimens as well as in the biopsies of batch 1. Validation of highly discriminatory proteins and metabolic enzymes by SRM in a larger independent cohort supported their use to identify patients at high risk for developing lung cancer.

60 APPLIED LIFE SCIENCES↗

The dynamic nature of risk in DOE facilities in the surveillance and maintenance program–with observations for risk communications

Here, we explore three case studies of facilities at two US Department of Energy (DOE) former nuclear weapons research and production sites—the Oak Ridge National Laboratory and the Hanford site—whose risk profiles have changed during their long-term management under the DOE's surveillance and maintenance (S&M) program. These case studies provide examples of the challenges faced in communicating to external stakeholders, such as federal and state regulators, local communities surrounding the site, as well as the general public, the circumstances surrounding unexpected events or the emergence/discovery of new risk-important information at historically high-risk sites. We identify common topics of importance from these case studies and suggest a taxonomy for risk communicators to use in informing the dialogues with individuals and organizations that may not be technically oriented or fully informed on the subject matter. The taxonomy is based on technical insights from the quintessential definition of risk known as the Kaplan–Garrick “risk triplet” as well as insights from regulatory guidance documents on risk communication with external stakeholders originally developed for the commercial nuclear power industry.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Risk-Averse Bi-Level Stochastic Network Interdiction Model for Cyber-Security Risk Management

Security of cyber networks is crucial; recent severe cyber-attacks have had a devastating effect on many large organizations. The attack graph, which maps the potential attack paths of a cyber network, is a popular tool for analyzing cyber system vulnerability. In this study, we propose a bi-level stochastic network interdiction model on an attack graph to enable a risk-averse, resource constrained cyber network defender to optimally deploy security countermeasures that protect against attackers with an uncertain budget. This risk- averse conditional-value-at-risk (CVaR) model minimizes a weighted sum of the expected maximum loss over all scenarios and the expected maximum loss from the most damaging attack scenarios. We develop a customized constraint and column generation algorithm to solve our model as well as several acceleration techniques to improve the computational efficiency. Numerical experiments demonstrate that the acceleration techniques enable the solution of relatively large problems within a reasonable amount of time: applying all the acceleration techniques also reduces the average computation time of the basic algorithm by 71% for 100-node graphs. Using metrics called mean-risk value of stochastic solution and value of risk-aversion, computational results suggest that our stochastic risk-averse model significantly outperforms deterministic and risk-neutral models when 1) the distribution of attacker budget is heavy-right-tailed and 2) the defender is highly risk-averse.

Bhuiyan, Tanveer H.↗

ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

Johnson, Paul W.↗

Risk Management and Risk Aversion, from Benefit to Impediment

Risk management is a critical tool for improving the probability of project success by identifying, assessing, prioritizing, and attempting to control threats to project realization. For industries that require high operational reliability due to the potential consequences of off-normal events, such as the nuclear, aerospace, and chemical sectors, a major focus of risk management is the preservation of process safety. Due to the nature of the processes or systems under consideration, the associated process safety analyses (such as risk and safety assessments) and safety features can require significant resources. These costs are typically tolerated either due to the need to satisfy regulatory requirements or based on the assumption that they generally decrease the occurrence of unwanted events and therefore improve the probability of project success. However, as the level of acceptable or tolerable risk from unwanted events decreases, the required resources necessary for ensuring and demonstrating satisfaction of these criteria can grow and in turn can become one of the dominant impediments to project success. This paper outlines a high-level theoretical framework for the consideration of dominant project risks, which includes potential project failure from both the occurrence of high consequence off-normal events and the inability to achieve project completion due to the resource needs and innovation losses associated with extreme risk aversion. Utilizing such an integrated approach permits an attempt to optimize the probability of successful project realization while also providing valuable insight into the proper level of acceptable risk. The work is presented as a first step, in hopes of spurring additional discussion and analysis regarding appropriate levels of risk tolerance and the balance of project benefits.

Grabaskas, David↗

Dynamic probabilistic risk assessment and game theory for cyber security risk analysis in nuclear power plants

Nuclear Power Plants and energy systems have become more prone to cyber-attacks with their digitalization and the increased use of smart equipment. Hence, it is important to quantify the risk associated with cyber-attacks in such systems. Dynamic Probabilistic Risk Assessment which involves studying the evolution of a system due to random events and operator and attacker actions during a cyber-attack by employing a physics-based model of the system is a suitable framework to quantify cybersecurity risk in nuclear power plants. In addition to the plant dynamics, it is also important to model the strategies of the attackers and plant operators for an effective cybersecurity risk assessment. Game theory provides a set of necessary tools to model such strategic interactions. In this research, a framework that integrates dynamic probabilistic risk assessment with game theory for cybersecurity risk analysis in nuclear power plants is presented. The mathematical formulation is derived based on the theory of continuous event trees. We propose a game theory based action model, that utilizes physics-based rewards to define the strategies of attackers and operators at every decision epoch. As a case study, the risk associated with cyber-attacks on the digital components in the secondary side of a pressurized water reactor is studied using a reduced order model. A set of attacker actions and a set of operator actions are defined for the system. The operator and attacker interactions were modelled using simultaneous game, their action policies were computed using the concept of mixed strategy Nash equilibrium and the evolution of the system was studied.

97 MATHEMATICS AND COMPUTING↗

Investigating Risks Due to Artemis EVA Tempo Via Probabilistic Risk Assessment

Spaceflight operations pose unique challenges to crew health, safety, and resource management. As space agencies and private companies continue to push the boundaries of human exploration, it is essential to understand the risks associated with Extravehicular Activities (EVAs) and develop strategies to mitigate them. The tempo at which EVAs are conducted – the total number and frequency of these activities – can have a profound impact on medical risks, resource consumption, and overall mission success. Probabilistic risk assessment (PRA) provides a powerful framework for evaluating complex systems and identifying potential hazards. Our work employs the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) [1] to simulate mission events, occurrence and treatment of medical conditions, and track the utilization of resources. Coupled with the Evidence Library [2], a medical evidence base for exploration-class missions developed by the Exploration Medical Capability within NASA’s Human Research Program, we can estimate these risks with increased fidelity and optimize medical kit contents to meet specific mission requirements. This presentation provides a detailed examination of how EVA tempo influences medical risk estimates for a lunar surface design reference mission. A comprehensive analysis is conducted to assess the additional mass and volume burden imposed on medical kits required to maintain adequate levels of risk mitigation. Furthermore, we estimate the distribution of the number of successful EVAs completed based on the level of task impairment imposed by medical events and flight rules related to specific medical events, such as decompression sickness.

Modeling↗