DOE OSTI2021
Gas Technology Institute (GTI) has completed a $1.815M (plus $500K cost share), 54-month Co-operative agreement with the Department of Energy’s National Energy Technology Laboratory to develop a Methane Mitigation Thermoelectric Generator (MMTEG) system for gas field applications. This novel system uses fugitive gas to produce electrical power and consists of Thermoelectric Generators (TEG) driven by a linear burner, an air compressor, an accumulator, valves, batteries, and power electronics. The electrical power generated by the system is used to compress air and, in turn, the air is used to operate the pneumatic valves at the well site instead of using natural gas (NG) which would then be vented. The team completed the project objectives which included (1) Design, fabricate and test an integrated 6We nominal MMTEG prototype system, (2) Design a “retrofit kit” MMTEG system capable of being field tested at a gas well production site, and (3) build and test the field MMTEG system in a laboratory environment. Multiple system options were developed prior to selecting a “Passive” system which meets cost, NG savings, and greenhouse gas (GHG) reduction targets although not as efficient as initially planned. The MMTEG system is built primarily from commercial off-the-shelf parts (in some cases re-purposed) including the heat exchanger, heat rejection, electronic components, and also the TEGs. The team developed and implemented a novel system including the control system developed by Morrison Applied Sciences (MAS). The team completed incremental demonstrations of the hardware prior to the MMTEG system demonstration. A one-year simulation of the air delivery and battery charging subsystems was completed prior to the integration into the MMTEG system. In addition, the team simulated two-years of thermal cycles for integrated Burner/TEG/heat rejection subsystem. Finally, the entire MMTEG system was assembled, and troubleshooting was completed over a two-week period. Next, the MMTEG system was tested to simulate over 15 weeks of entire system operation over approximately four weeks in an accelerated test fashion with minimal intervention (such as changing fuel tanks). The MMTEG system met the key goals of a unit cost of under $1500 while saving 97% of NG expended today (including leakage) on average by pneumatic systems venting to the atmosphere. The MMTEG system reduced GHG emissions by 1000X (using the methane intensification factor of 28 relative to CO2). GTI is currently pursuing a field test of the MMTEG system. Interfacing with producers has provided additional insight into system improvements. Planned improvements include additional weather protection and control system improvements including the implementation of a long- range radio capability to notify operators if there is a fault.