Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resume”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Resume of Present Data on Load Distribution on Slots and Flaps, Special Report

This report covers a study of the generally available data on load distribution on slots and flaps. The study was made by the National Advisory Committee for Aeronautics at the request of the Material Division, Army Air Corps to furnish information applicable to design criteria for slots and flaps of various types. The data are presented in three main sections: slots (Handley page type), auxiliary airfoils (fixed), and flaps.

Wenzinger, Carl J.↗

Resume of Data for Internally Balanced Ailerons

The available test results of internally balanced ailerons have been correlated and summarized herein. Although several variables have yet to-be-investigated, the results presented will be useful in the preliminary design of internally balanced ailerons and in the determination of the most promising modifications to unsatisfactory ailerons.

Rogallo, F. M.↗

Space applications instrumentation systems

A compendium of resumes of 158 instrument systems or experiments, of particular interest to space applications, is presented. Each resume exists in a standardized format, permitting entries for 26 administrative items and 39 scientific or engineering items. The resumes are organized into forty groups determined by the forty spacecraft with which the instruments are associated. The resumes are followed by six different cross indexes, each organized alphabetically according to one of the following catagories: instrument name, acronym, name of principal investigator, name of organization employing the principal investigator, assigned experiment number, and spacecraft name. The resumes are associated with a computerized instrument resume search and retrieval system.

Minzner, R. A.↗

The Effect of Interruptions on Part 121 Air Carrier Operations

The primary purpose of this study was to determine the relative priorities of various events and activities by examining the probability that a given activity was interrupted by a given event. The analysis will begin by providing frequency of interruption data by crew position (captain versus first officer) and event type. Any differences in the pattern of interruptions between the first officers and the captains will be explored and interpreted in terms of standard operating procedures. Subsequent data analyses will focus on comparing the frequency of interruptions for different types of activities and for the same activities under normal versus emergency conditions. Briefings and checklists will receive particular attention. The frequency with which specific activities are interrupted under multiple- versus single-task conditions also will be examined; because the majority of multiple-task data were obtained under laboratory conditions, LOFT-type tapes offer a unique opportunity to examine concurrent task performance under 'real-world' conditions. A second purpose of this study is to examine the effects of the interruptions on performance. More specifically, when possible, the time to resume specific activities will be compared to determine if pilots are slower to resume certain types of activities. Errors in resumption or failures to resume specific activities will be noted and any patterns in these errors will be identified. Again, particular attention will be given to the effects of interruptions on the completion of checklists and briefings. Other types of errors and missed events (i.e., the crew should have responded to the event but did not) will be examined. Any methodology using interruptions to examine task prioritization must be able to identify when an interruption has occurred and describe the ongoing activities that were interrupted. Both of these methodological problems are discussed In detail in the following section,

Damos, Diane L.↗

Alterations of Body Mass Gain of Neonates (P7&P14) During Certrifugation AT 2G

Previous research has shown animal body mass to be significantly affected by centrifugation. At the onset of centrifugation, animals have a selective loss of fat, causing an initial body mass loss. Body mass gain will resume at the same rate as uncentrifuged animals, but this subsequent gain will be lower. For this study, two different ages of Sprague Hawley neonate families were observed during centrifugation. Eight litters (dam with eight neonates) of postnatal day (PN) seven and four litters (dam with ten neonates) of PN 14 were separated into two separate groups each, centrifuge (+2G(sub z)) and environmental controls (EC) and placed into either the centrifuge or an animal holding unit in the centrifuge rotunda for a total of 16 days. P7: Total litter start mass of +2G(sub z) litter = 138.90 g/end = 311.0 g EC litter = 150.85 g/end = 516.9 g. P14: Total litter start mass of +2G(sub z) litter = 287.70 g/end = 762.5g; EC litter = 245 g/end = 942.9 g. An initial body mass loss was observed in both groups of +2G(sub z) animals for two days after the onset of centrifugation, but then an increase began to occur. Literature suggests adult animals at +2G(sub z), will have an initial loss, but will resume similar growth rates over time as compared to control animals. The P7 +2G(sub z) animals began to gain body mass, but showed a significantly slower growth rate than their EC animals for the duration of the test (pace). The P14 +2G(sub z) animals began to show similar growth rates to their EC after day nine. At day 16, both groups of +2Gz animals were significantly smaller than the EC animals (pace). At +2Gz, animals experience an initial body mass loss. Older animals are able to resume similar growth rates as their controls, but younger animals showed growth rates to be significantly reduced.

Baer, L. A.↗

Lessons Learned During the Transition of SORCE Science Operations to Daylight Only Operations

In July 2013, NASA's Solar Radiation and Climate Experiment experienced a battery anomaly which placed it into safemode halting all science observations. Initial attempts to recover the spacecraft to an operational configuration failed due to the reduced capacity of the battery. As the keystone mission for measuring total solar irradiance, and the cornerstone mission for measuring the solar spectral irradiance there was a strong motivation for developing a new operations concept that would allow SORCE to resume daily measurements of the Sun. The operations team faced many challenges over the next several months. For a five-day period in late 2013 the operations team was able resume science observations to cross-calibrate SORCE data with a new instrument launched in November 2013. After the cross-calibration campaign was completed a new operations concept was deployed which allowed SORCE to perform daylight only operations. In this mode of operations all non-essential components are powered off at each eclipse entry and then turned back on at sunrise. In March 2014 SORCE resumed making daily measurements of the Sun. This paper will review the events and lessons learned from the six-month recovery effort.

Spacecraft Anomaly↗

Multiple gravity-wave breaking levels

Gravity waves for which the expression /u(bar)-c/, where u(bar) = mean flow speed and c = wave phase speed, exhibits a sharp minimum in the upper troposphere or lower stratosphere, have decaying amplitudes above this level despite their exponentially decreasing mean density; this decay then ceases and growth resumes. If a gravity wave breaks below the level of /u(bar)-c/min, it will cease breaking above this level, while resuming breaking at some higher, second level which is a lower bound for the level of breaking in the mesosphere. Explicit calculations show the second breaking levels to be close to observed levels of mesospheric gravity wave breaking.

Lindzen, R. S.↗

Cell cycle arrest by prostaglandin A1 at the G1/S phase interface with up-regulation of oncogenes in S-49 cyc- cells

Our previous studies have implied that prostaglandins inhibit cell growth independent of cAMP. Recent reports, however, have suggested that prostaglandin arrest of the cell cycle may be mediated through protein kinase A. In this report, in order to eliminate the role of c-AMP in prostaglandin mediated cell cycle arrest, we use the -49 lymphoma variant (cyc-) cells that lack adenylate cyclase activity. We demonstrate that dimethyl prostaglandin A1 (dmPGA1) inhibits DNA synthesis and cell growth in cyc- cells. DNA synthesis is inhibited 42% by dmPGA1 (50 microM) despite the fact that this cell line lacks cellular components needed for cAMP generation. The ability to decrease DNA synthesis depends upon the specific prostaglandin structure with the most effective form possessing the alpha, beta unsaturated ketone ring. Dimethyl PGA1 is most effective in inhibiting DNA synthesis in cyc- cells, with prostaglandins PGE1 and PGB1 being less potent inhibitors of DNA synthesis. DmPGE2 caused a significant stimulation of DNA synthesis. S-49 cyc- variant cells exposed to (30-50 microns) dmPGA1, arrested in the G1 phase of the cell cycle within 24 h. This growth arrest was reversed when the prostaglandin was removed from the cultured cells; growth resumed within hours showing that this treatment is not toxic. The S-49 cyc- cells were chosen not only for their lack of adenylate cyclase activity, but also because their cell cycle has been extensively studied and time requirements for G1, S, G2, and M phases are known. Within hours after prostaglandin removal the cells resume active DNA synthesis, and cell number doubles within 15 h suggesting rapid entry into S-phase DNA synthesis from the G1 cell cycle block.(ABSTRACT TRUNCATED AT 250 WORDS).

NASA Discipline Cell Biology↗

A Year in the Life of International Space Station

The past twelve months (October 2005 to September 2006) have been among the busiest in the life of the International Space Station (ISS), both in terms of on-orbit operations as well as future planning, for both ISS systems and research. The Expedition 12 and 13 crews completed their missions successfully, carrying out research for Russia, the United States, Europe and Japan, and bringing continuous ISS occupancy to nearly six years. The European Space Agency's (ESA) first Long Duration Mission on ISS is underway, involving significant international research. The Expedition 14 crew completed its training and is embarking on its own 6-month mission with a full slate of international research. Future crews are in training for their respective assembly and research missions. Shuttle flights resumed after a 10-month hiatus, delivering new research facilities and resuming assembly of ISS. ESA's Columbus research module was delivered to the Kennedy Space Center, joining Japan's Kibo research module already there. Following preflight testing, the two modules will launch in 2007 and 2008, respectively, joining Destiny as ISS's research infrastructure. A revised ISS configuration and assembly sequence were endorsed by all the Partners, with a reduced number of Shuttle flights, but for the first time including plans for post-Shuttle ISS operations after 2010. The new plan will pose significant challenges to the ISS research community. As Europe and Japan build their on-orbit research infrastructure, and long-term plans become firmer, the next 12 months should prove to be equally challenging and exciting.

Uri, John J.↗

Rotary Percussive Auto-Gopher for Deep Drilling and Sampling

The term "rotary percussive auto-gopher" denotes a proposed addition to a family of apparatuses, based on ultrasonic/ sonic drill corers (USDCs), that have been described in numerous previous NASA Tech Briefs articles. These apparatuses have been designed, variously, for boring into, and/or acquiring samples of, rock or other hard, brittle materials of geological interest. In the case of the rotary percussive autogopher, the emphasis would be on developing an apparatus capable of penetrating to, and acquiring samples at, depths that could otherwise be reached only by use of much longer, heavier, conventional drilling-and-sampling apparatuses. To recapitulate from the prior articles about USDCs: A USDC can be characterized as a lightweight, low-power jackhammer in which a piezoelectrically driven actuator generates ultrasonic vibrations and is coupled to a tool bit through a free mass. The bouncing of the free mass between the actuator horn and the drill bit converts the actuator ultrasonic vibrations into sonic hammering of the drill bit. The combination of ultrasonic and sonic vibrations gives rise to a hammering action (and a resulting chiseling action at the tip of the tool bit) that is more effective for drilling than is the microhammering action of ultrasonic vibrations alone. The hammering and chiseling actions are so effective that the size of the axial force needed to make the tool bit advance into soil, rock, or another material of interest is much smaller than in ordinary rotary drilling, ordinary hammering, or ordinary steady pushing. The predecessor of the rotary percussive auto-gopher is an apparatus, now denoted an ultrasonic/sonic gopher and previously denoted an ultrasonic gopher, described in "Ultrasonic/ Sonic Mechanism for Drilling and Coring" (NPO-30291), NASA Tech Briefs Vol. 27, No. 9 (September 2003), page 65. The ultrasonic/sonic gopher is intended for use mainly in acquiring cores. The name of the apparatus reflects the fact that, like a gopher, it periodically stops advancing at the end of the hole to bring excavated material (in this case, a core sample) to the surface, then re-enters the hole to resume the advance of the end of the hole. By use of a cable suspended from a reel on the surface, the gopher is lifted from the hole to remove a core sample, then lowered into the hole to resume the advance and acquire the next core sample.

Bar-Cohen, Yoseph↗

Ares V Overview and Status

As part of NASA s Constellation Program to resume exploration beyond low Earth orbit (LEO), the Ares V heavy-lift cargo launch vehicle as currently conceived will be able to send more crew and cargo to more places on the Moon than the Apollo Program Saturn V. (Figure 1) It also has unprecedented cargo mass and volume capabilities that will be a national asset for science, commerce, and national defense applications. Compared to current systems, it will offer approximately five times the mass and volume to most orbits and locations. The Columbia space shuttle accident, the resulting investigation, the Vision for Space Exploration, and the Exploration Systems Architecture Study (ESAS) broadly shaped the Constellation architecture. Out of those events and initiatives emerged an architecture intended to replace the space shuttle, complete the International Space Station (ISS), resume a much more ambitious plan to explore the moon as a stepping stone to other destinations in the solar system. The Ares I was NASA s main priority because of the goal to retire the Shuttle. Ares V remains in a concept development phase, evolving through hundreds of configurations. The current reference design was approved during the Lunar Capabilities Concept Review/Ares V Mission Concept Review (LCCR/MCR) in June 2008. This reference concept serves as a starting point for a renewed set of design trades and detailed analysis into its interaction with the other components of the Constellation architecture and existing launch infrastructure. In 2009, the Ares V team was heavily involved in supporting the Review of U.S. Human Space Flight Plans Committee. Several alternative designs for Ares V have been supplied to the committee. This paper will discuss the origins of the Ares V design, the evolution to the current reference configuration, and the options provided to the review committee.

Creech, Steve↗

Current Status of NASA's Heavy Lift Plans

Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of - and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA's most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA's Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA's priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA s most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA s Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA s priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch successfully demonstrated in suborbital flighhe ability to assemble, prepare, launch, control and recover the Ares I configuration and compare performance to computer models. Component tests continue on the J-2X engine, which will put both the Ares I and Ares V upper stages into orbit. In addition, more than 100,000 parts have been manufactured or on the assembly line for the first J-2X powerpack and the first two development engines, with hot fire tests to begin in 2011. This paper will further detail the progress to date on the Ares V and planned activities for the remainder of 2010. In addition, the Ares V team has continued its outreach to potential user communities in science and national security. Through the Constellation Program, NASA has amassed an enormous knowledge base in the design, technologies, and operations of heavy lift launch vehicles that will be a national asset for any future launch vehicle decision. This early phase of the design presents the best opportunity to incorporate where possible the insights and needs of other users.

Creech, Steve↗

Educational Experiences of Embry-Riddle Students through NASA Research Collaboration

NASA's educational. programs benefit students and faculty while increasing the overall productivity of the organization. The NASA Graduate Student Research Program (GSRP) awards fellowships for graduate study leading to both masters and doctoral degrees in several technical fields. GSRP participants have the option to utilize NASA Centers andlor university research facilities. In addition, GSRP students can serve as mentors for undergrad students to provide a truly unique learning experience. NASA's Cooperative Education Program allows undergraduate students the chance to gain "real-world" work experience in the field. It also gives NASA a no risk capability to evaluate the true performance of a prospective new hire without relying solely on a "paper resume" while providing the students with a greater hiring potential upon graduation, at NASA or elsewhere. University faculty can also benefit by participating in the NASA Faculty Fellowship Program (NFFP). This program gives the faculty an opportunity to work with NASA peers. The Mission Analysis Branch of the Expendable Launch Vehicles Division at NASA Kennedy Space Center has utilized these two programs with students from Embry-Riddle Aeronautical University (ERAU) to conduct research in modeling and developing a parameter estimation method for spacecraft fuel slosh using simple pendulum analogs. Simple pendulum models are used to understand complicated spacecraft fuel slosh behavior. A robust parameter estimation process will help to identif' the parameters that will predict the response fairly accurately during the initial stages of design. These programs provide students with a unique opportunity to work on "real-world" aerospace problems, like spacecraft fuel slosh,. This in turn reinforces their problem solving abilities and their communication skills such as interviewing, resume writing, technical writing, and presentation. Faculty benefits by applying what they have learned to the classroom. Through university collaborations with NASA and industry help students to acquire skills that are vital for their success upon entering the workforce.

Schlee, Keith↗

Educational Experiences of Embry-Riddle Students through NASA Research Collaboration

NASA's educational programs benefit students while increasing the overall productivity of the organization. The NASA Graduate Student Research Program (GSRP) awards fellowships for graduate study leading to both masters and doctoral degrees in several technical fields, while the Cooperative Education program allows undergraduate and graduate students the chance to gain work experience in the field. The Mission Analysis Branch of the Expendable Launch Vehicles Division at NASA Kennedy Space Center has utilized these two programs with students from Embry-Riddle Aeronautical University to conduct research in modeling and developing a parameter estimation method for spacecraft fuel slosh using simple pendulum analogs. Simple pendulum models are used to understand complicated spacecraft fuel slosh behavior. A robust parameter estimation process will help to identiFy the parameters that will predict the response fairly accurately during the initial stages of design. NASA's Cooperative Education Program trains the next wave of new hires while allowing graduate and undergraduate college students to gain valuable "real-world" work experience. It gives NASA a no risk capability to evaluate the true performance of a prospective new hire without relying solely on a paper resume, while providing the students with a greater hiring potential upon graduation, at NASA or elsewhere. In addition, graduate students serve as mentors for undergrad students and provide a unique learning environment. Providing students with a unique opportunity to work on "real-world" aerospace problems ultimately reinforces their problem solving abilities and their communication skills (in terms of interviewing, resume writing, technical writing, presentation, and peer review) that are vital for the workforce to succeed.

Schlee, Keith↗

The Dawn of Vesta Science

The Dawn mission is part of NASA's Discovery Program and has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total ?V of 11.3 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Fullpower thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ?V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. An additional 210 hours of IPS thrusting was used to enter the first Vesta science orbit, called Survey orbit, on August 3, 2011 at an altitude of approximately 2,735 km. To date the IPS has been operated for 23,621 hours, consumed approximately 252 kg of xenon, and provided a delta-V of approximately 6.7 km/s. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. The only significant issue in over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in the Digital Control and Interface Unit-1 (DCIU-1), resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture restored DCIU-1 to full functionality. After about three weeks of Survey orbit operations the IPS will be used to transfer the spacecraft to the other planned science orbit altitudes. After approximately one year of science operations the IPS will be used for escape from Vesta and then for thrusting to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of science operations at Vesta.

electric propulsion↗