Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sedimentary Geothermal Resources in Nevada, Utah, Colorado, and Texas

The objectives of this project were to (1) perform a literature review of sedimentary geothermal resources, (2) identify data sources and develop data-collection methodologies that characterize selected resources, (3) screen sedimentary basins and formations for sedimentary geothermal potential, and (4) evaluate the technical feasibility of one or more selected locations. Numerous publications have characterized geothermal resources within sedimentary basins. A literature search reviewed publications describing resources located in Colorado, Louisiana, Nevada, Texas, Utah, and Wyoming. The most attractive resources have high temperature gradients, low drilling costs, and reservoir permeabilities greater than 10 millidarcies (mD). Prospects in Colorado, Nevada, Texas, and Utah exhibit attractive characteristics and were chosen for further analysis. Sedimentary resources in Nevada and Utah are most attractive, followed by tested resources in Texas and untested resources in Colorado. The identified resources in Wyoming and Louisiana had lower geothermal gradients and were not evaluated. Reservoir modeling and techno-economic analysis were performed at Marys River Basin–North in Nevada. Geothermal energy production at this location is expected to have a levelized cost of energy (LCOE) ranging between 10 and 20 cents/kWh. Additional work may result in lower LCOE estimates at this location and at other attractive prospects in these three regions. The Great Basin carbonate and alluvial aquifer system of eastern Nevada and western Utah includes a lower carbonate aquifer unit, which has the potential for hosting both conduction- and convection-dominated geothermal systems. Mapping has identified lateral thickness variability expressed as a roughly 120–150-km-wide central corridor, which hosts the thickest and most continuous formations and extends from near Las Vegas north to the Idaho border. Purchase and analysis of privately held legacy seismic data could potentially compensate for the lack of sufficient data documenting measured depth to the lower carbonate aquifer unit. Multiple orogenies, extension episodes, and intrusive events have deformed and displaced the target formations of the lower carbonate aquifer unit. This structural complexity and potential for dipping reservoirs emphasizes the need for detailed geological, geophysical, and reservoir modeling. Heat flow within three Colorado sedimentary basins reviewed as part of this study was calculated in targeted studies by the Colorado Geologic Survey and Colorado School of Mines. These calculations are based on bottom-hole temperature data sets with significant limitations and some variability but produce values consistently higher than the global continental average of 65 mW/m2 for all three basins. Heat flow in the Raton Basin is the highest; however, permeability measurements from specific sedimentary formations with high heat flow have not been obtained. Promising formations for sedimentary geothermal systems were found in all three regions studied—Nevada-Utah, Colorado, and Texas. The next steps for developing sedimentary geothermal resources vary due to differences in available data and resource uncertainties. Additional scopes of work are recommended for identified basins in these three regions.

15 GEOTHERMAL ENERGY↗

The sensitivity of the Fitch wind farm parameterization to a three-dimensional planetary boundary layer scheme

Abstract. Wind plant wake impacts can be estimated with a number of simulation methodologies, each with its own fidelity and sensitivity to model inputs. In turbine-free mesoscale simulations, hub-height wind speeds often significantly vary with the choice of a planetary boundary layer (PBL) scheme. However, the sensitivity of wind plant wakes to a PBL scheme has not been explored because, as of the Weather Research and Forecasting model v4.3.3, wake parameterizations were only compatible with one PBL scheme. We couple the Fitch wind farm parameterization with the new NCAR 3DPBL scheme and compare the resulting wakes to those simulated with a widely used PBL scheme. We simulate a wind plant in pseudo-steady states under idealized stable, neutral, and unstable conditions with matching hub-height wind speeds using two PBL schemes: MYNN and the NCAR 3DPBL. For these idealized scenarios, average hub-height wind speed losses within the plant differ between PBL schemes by between −0.20 and 0.22 m s−1, and correspondingly, capacity factors range between 39.5 %–53.8 %. These simulations suggest that PBL schemes represent a meaningful source of modeled wind resource uncertainty; therefore, we recommend incorporating PBL variability into future wind plant planning sensitivity studies as well as wind forecasting studies.

17 WIND ENERGY↗

Simulation Of Research And Development Projects

Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.

Miles, Ralph F.↗

Geothermal Drilling: A Baseline Study of Nonproductive Time Related to Lost Circulation

A single production geothermal well costs up to seven million dollars and a typical geothermal field contains 10 to 20 wells for a development cost of potentially $140 million according to a Geothermal Resources Group study. Capital cost coupled with exploration and resource uncertainty lead to high upfront project risk. This study analyzed the time and cost of detailed geothermal drilling operations. We found the largest cause of nonproductive time in geothermal wells is advancing through lost circulation zones, where drilling fluid is lost from the well. Mitigation measures implemented during lost circulation events can increase drilling time by a significant fraction of the drilling days. There is opportunity to reduce the drilling costs by addressing logistical inefficiencies and ineffective mitigation measures to minimize nonproductive time. This study reviewed daily drilling data for 38 geothermal wells drilled since 2009 in the U.S. The analysis presented here summarizes the lost circulation events identified in the available drilling data by assessing time per event, costs incurred, materials used, success of mitigation strategies, and resolution time. This study found that wells averaged over 100 hours of unprogrammed nonproductive time due to lost circulation, adding an estimated $185,000 to each well in rig costs. A plan for future research aimed at reducing lost circulation nonproductive time and cost is presented. operations. We found the largest cause of nonproductive time in geothermal wells is advancing through lost circulation zones, where drilling fluid is lost from the well. Mitigation measures implemented during lost circulation events can increase drilling time by a significant fraction of the drilling days. There is opportunity to reduce the drilling costs by addressing logistical inefficiencies and ineffective mitigation measures to minimize nonproductive time. This study reviewed daily drilling data for 38 geothermal wells drilled since 2009 in the U.S. The analysis presented here summarizes the lost circulation events identified in the available drilling data by assessing time per event, costs incurred, materials used, success of mitigation strategies, and resolution time. This study found that wells averaged over 100 hours of unprogrammed nonproductive time due to lost circulation, adding an estimated $185,000 to each well in rig costs. A plan for future research aimed at reducing lost circulation nonproductive time and cost is presented.

15 GEOTHERMAL ENERGY↗

OSW Consortium 2 - Validated National Offshore Wind Resource Dataset with Uncertainty Quantification (CRADA Report)

This research has led to the development of the 2023 National Offshore Wind data set (NOW-23), which offers the latest wind resource information for offshore regions in the United States. NOW-23 supersedes, for its offshore component, the Wind Integration National Dataset (WIND) Toolkit, which was published a decade ago and is currently a primary resource for wind resource assessments and grid integration studies in the contiguous United States. By incorporating advancements in the Weather Research and Forecasting (WRF) model, NOW-23 delivers an updated and cutting-edge product to stakeholders. As part of this project, we also developed a summary of the uncertainty quantification in NOW-23, along with NOW-WAKES, a 1-year post-construction data set that quantifies expected offshore wake effects in the US Mid-Atlantic lease areas. Stakeholders can access the NOW-23 data set at https://doi.org/10.25984/1821404.

17 WIND ENERGY↗

LCOE Uncertainty Analysis for Hydropower using Monte Carlo Simulations

Levelized Cost of Energy (LCOE) is an important metric to evaluate the cost and performance of electricity production generation alternatives, and combined with other measures, can be used to assess the economics of future hydropower development. Multiple assumptions on input parameters are required to calculate the LCOE, which each contain some level of uncertainty, in turn affecting the accuracy of LCOE results. This paper explores these uncertainties, their sources, and ultimately the level of variability they introduce at the screening level of project evaluation for non-powered dams (NPDs) across the U.S.Owing to site-specific differences in site design, the LCOE for hydropower varies significantly from project to project unlike technologies with more standardized configurations such as wind and gas. Therefore, to assess the impact of LCOE input uncertainty on the economics of U.S. hydropower resources, these uncertainties must be modeled across the population of potential opportunities. To demonstrate the impact of uncertainty, resource data from a recent nationwide non-powered dam (NPD) resource assessment (Hadjerioua et al., 2012) and screening-level predictive cost equations (O’Connor et al., 2015) are used to quantify and evaluate uncertainties in project capital and operations & maintenance costs, and generation potential at broad scale. LCOE dependence on financial assumptions is also evaluated on a sensitivity basis to explore ownership/investment implications on project economics for the U.S. hydropower fleet.The results indicate that the LCOE for U.S. NPDs varies substantially. The LCOE estimates for the potential NPD projects of capacity greater than 1 MW range from 40 to 182 $/MWh, with average of 106 $/MWh. 4,000 MW could be developed through projects with individual LCOE values below 100 $/MWh. The results also indicate that typically 90 % of LCOE uncertainty can be attributed to uncertainties in capital costs and energy production; however, for small projects (below 10 MW) O&M uncertainty plays an important role. The potential NPDs have costs with uncertainty bands extending well above 100 $/MWh in some cases. A truly representative evaluation should complement LCOE with an assessment of potential revenues from the provision of ancillary services. Moreover, hydroelectric production is often part of multipurpose water resource projects where other purposes (e.g., irrigation, flood control, navigation, recreation, etc.) also provide value. Neither of these considerations are accounted for LCOE.

Chalise, Dol Raj↗

Modeling Uncertainty in Large Natural Resource Allocation Problems

The productivity of the world's natural resources is critically dependent on a variety of highly uncertain factors, which obscure individual investors and governments that seek to make long-term, sometimes irreversible investments in their exploration and utilization. These dynamic considerations are poorly represented in disaggregated resource models, as incorporating uncertainty into large-dimensional problems presents a challenging computational task. This study introduces a novel numerical method to solve large-scale dynamic stochastic natural resource allocation problems that cannot be addressed by conventional methods. The method is illustrated with an application focusing on the allocation of global land resource use under stochastic crop yields due to adverse climate impacts and limits on further technological progress. For the same model parameters, the range of land conversion is considerably smaller for the dynamic stochastic model as compared to deterministic scenario analysis. The scenario analysis can thus significantly overstate the magnitude of expected land conversion under uncertain crop yields.

Cai, Yongyang↗

Assessing Effects of Climate and Technology Uncertainties in Large Natural Resource Allocation Problems

The productivity of the world's natural resources is critically dependent on a variety of highly uncertain factors, which obscure individual investors and governments that seek to make long-term, sometimes irreversible, investments in their exploration and utilization. These dynamic considerations are poorly represented in disaggregated resource models, as incorporating uncertainty into large-dimensional problems presents a challenging computational task. In this paper, we apply the SCEQ algorithm (Cai and Judd, 2023) to solve a large-scale dynamic stochastic global land resource use problem with stochastic crop yields due to adverse climate impacts and limits on further technological progress. For the same model parameters and bounded shocks, the range of land conversion is considerably smaller for the dynamic stochastic model than for deterministic scenario analysis.

numerical methods↗

Calculating Individual Resources Variability and Uncertainty Factors Based on Their Contributions to the Overall System Balancing Needs

The variability and uncertainty of wind power production requires increased flexibility in power systems, or more operational reserves to main a satisfactory level of reliability. The incremental increase in reserve requirement caused by wind power is often studied separately from the effects of loads. Accordingly, the cost in procuring reserves is allocated based on this simplification rather than a fair and transparent calculation of the different resources’ contribution to the reserve requirement. This work proposes a new allocation mechanism for intermittency and variability of resources regardless of their type. It is based on a new formula, called grid balancing metric (GBM). The proposed GBM has several distinct features: 1) it is directly linked to the control performance standard (CPS) scores and interconnection frequency performance, 2) it provides scientifically defined allocation factors for individual resources, 3) the sum of allocation factors within any group of resources is equal to the groups’ collective allocation factor (linearity), and 4) it distinguishes helpers and harmers. The paper illustrates and provides results of the new approach based on actual transmission system operator (TSO) data.

Makarov, Yuri V.↗

Stochastic Programming Approach for Resource Selection under Demand Uncertainty

Cost-efficient selection and scheduling of a subset of geographically distributed resources to meet the demands of a scientific workflow is a challenging problem. The problem is exacerbated by uncertainties in demand and availability of resources. In this paper, we present a stochastic optimization based framework for robust decision making in the selection of distributed resources over a planning horizon under demand uncertainty. We present a novel two-stage stochastic programming model for resource selection, and implement an L-shaped decomposition algorithm to solve this model. A Sample Average Approximation algorithm is integrated to enable stochastic optimization to solve problems with a large number of scenarios. Using the metric of stochastic solution, we demonstrate up to 30% cost reduction relative to solutions without explicit consideration of demand uncertainty for a 24-month problem. We also demonstrate up to 54% cost reduction relative to a previously developed solution for a 36-month problem. We further argue that the composition of resources selected is superior to solutions computed without explicit consideration of uncertainties. Given the importance of resource selection and scheduling of complex scientific workflows, especially in the context of commercial cloud computing, we believe that our novel stochastic programming framework will benefit many researchers as well as users of distributed computing resources.

scientific workflows, task scheduling, optimizatio↗

Quantifying Uncertainties in Modeling Wind Resource Data from Different PBL Schemes in the WRF Model: A Case Study Over the Puerto Rico Region

This study examines the modeling uncertainty of wind resource data stemming from the use of various planetary boundary layer (PBL) parameterizations available in the Weather Research and Forecasting (WRF) model. WRF-based wind simulations spanning 20 years at 3-km resolution using 11 different PBL schemes are used to objectively investigate the uncertainty in modeling wind speed for land-based wind (LBW) and offshore wind (OSW) locations in Puerto Rico. The uncertainty in the wind modeling for the 20-year dataset is quantified using the spread index (SI) and standard deviation (SD). For virtual LBW and OSW sites, the SI and SD values are analyzed as calculated across various spatial and temporal scales. Because the PBL's atmospheric stability conditions can be characterized into two dominant categories, the study focuses on analyzing the SI and SD for daytime (mainly unstable PBL conditions) and nighttime (mainly stable PBL conditions). For wind shear (10 m-200 m) at the OSW and LBW sites, WRF-based numerical experiments indicate the following SI (or SD) ranges: 39%-94% (0.74 m/s-1.44 m/s) during the daytime for OSW, 50%-75% (0.68 m/s-1.19 m/s) during the daytime for LBW, 37%-60% (0.73 m/s-1.12 m/s) during the nighttime for OSW, and 57%-143 % (0.65 m/s-1.43 m/s) during the nighttime for LBW. While a high SI is observed when modeling LBW during the nighttime, there are notable modeling uncertainties during the daytime on the leeward side of the orographic barriers for Puerto Rico.

17 WIND ENERGY↗

Mid-Atlantic Wind - Overcoming the Challenges

This study, supported by the US Department of Energy, Wind Powering America Program, Maryland Department of Natural Resources and Chesapeake Bay Foundation, analyzed barriers to wind energy development in the Mid-Atlantic region along with options for overcoming or mitigating them. The Mid-Atlantic States including Delaware, Maryland, North Carolina and Virginia, have excellent wind energy potential and growing demand for electricity, but only two utility-scale projects have been installed to date. Reasons for this apathetic development of wind resources were analyzed and quantified for four markets. Specific applications are: 1) Appalachian mountain ridgeline sites, 2) on coastal plains and peninsulas, 3) at shallow water sites in Delaware and Chesapeake Bays, Albemarle and Pamlico Sounds, and 4) at deeper water sites off the Atlantic coast. Each market has distinctly different opportunities and barriers. The primary barriers to wind development described in this report can be grouped into four categories; state policy and regulatory issues, wind resource technical uncertainty, economic viability, and public interest in environmental issues. The properties of these typologies are not mutually independent and do interact. The report concluded that there are no insurmountable barriers to land-based wind energy projects and they could be economically viable today. Likewise potential sites in sheltered shallow waters in regional bay and sounds have been largely overlooked but could be viable currently. Offshore ocean-based applications face higher costs and technical and wind resource uncertainties. The ongoing research and development program, revision of state incentive policies, additional wind measurement efforts, transmission system expansion, environmental baseline studies and outreach to private developers and stakeholders are needed to reduce barriers to wind energy development.

17 WIND ENERGY↗

Mid-Atlantic Wind - Overcoming the Challenges

This study, supported by the US Department of Energy, Wind Powering America Program, Maryland Department of Natural Resources and Chesapeake Bay Foundation, analyzed barriers to wind energy development in the Mid-Atlantic region along with options for overcoming or mitigating them. The Mid-Atlantic States including Delaware, Maryland, North Carolina and Virginia, have excellent wind energy potential and growing demand for electricity, but only two utility-scale projects have been installed to date. Reasons for this apathetic development of wind resources were analyzed and quantified for four markets. Specific applications are: 1) Appalachian mountain ridgeline sites, 2) on coastal plains and peninsulas, 3) at shallow water sites in Delaware and Chesapeake Bays, Albemarle and Pamlico Sounds, and 4) at deeper water sites off the Atlantic coast. Each market has distinctly different opportunities and barriers. The primary barriers to wind development described in this report can be grouped into four categories; state policy and regulatory issues, wind resource technical uncertainty, economic viability, and public interest in environmental issues. The properties of these typologies are not mutually independent and do interact. The report concluded that there are no insurmountable barriers to land-based wind energy projects and they could be economically viable today. Likewise potential sites in sheltered shallow waters in regional bay and sounds have been largely overlooked but could be viable currently. Offshore ocean-based applications face higher costs and technical and wind resource uncertainties. The ongoing research and development program, revision of state incentive policies, additional wind measurement efforts, transmission system expansion, environmental baseline studies and outreach to private developers and stakeholders are needed to reduce barriers to wind energy development.

17 WIND ENERGY↗

MULTI-FIDELITY MODELING AND UNCERTAINTY QUANTIFICATION OF INVERTER BASED RESOURCES IN INTEGRATED T&D SYSTEMS

Uncertainty quantification plays a pivotal role in improving the accuracy and reliability of inverter operation within modern power systems that are increasingly dominated by inverter-based resources (IBRs). IBRs, especially those operating under grid forming (GFM) control, rely heavily on a complex set of control parameters and system measurements to maintain voltage, frequency, and power balance. Traditional deterministic modeling approaches often fail to capture these parameter deviations, potentially resulting in suboptimal control actions, reduced system stability, or even instability under high penetration of IBRs. In this paper, we demonstrate the application of model calibration and uncertainty quantification (UQ) principles to an integrated transmission and distribution (T&D) model involving a GFM converter and provide a framework for prioritizing control improvements, guiding robust design, and informing adaptive strategies that can accommodate real-time variability in system conditions. The proposed approach could be valuable in enhancing the robustness of current and future power systems under increased IBR penetrations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Occlusion-Perturbed Deep Learning for Probabilistic Solar Forecasting via Sky Images

Solar forecasting is shifting to the probabilistic paradigm due to the inherent uncertainty within the solar resource. Input uncertainty quantification is one of the widely used and best-performing ways to model solar uncertainty. However, compared to other sources of inputs, such as numerical weather prediction models, pure sky image-based probabilistic solar forecasting lags behind. In this research, an occlusion-perturbed convolutional neural network, named the PSolarNet, is developed. The PSolarNet provides very short-term deterministic forecasts, forecast scenarios, and probabilistic forecasts of the global horizontal irradiance from sky image sequences. Case studies based on 6 years of open-source data show that the developed PSolarNet is able to generate accurate 10-minute ahead deterministic forecasts with a 5.62% normalized root mean square error, realistic and diverse forecast scenarios with a 0.966 average correlation with the actual time series, and reliable and sharp probabilistic forecasts with a 2.77% normalized continuous ranked probability score.

Bayesian model averaging↗

Uncertainty Analysis Framework for the Hospital Resource Supply Model for Covid-19

In March and April of 2020 there was widespread concern about availability of medical resources required to treat Covid-19 patients who become seriously ill. A simulation model of supply management was developed to aid understanding of how to best manage available supplies and channel new production. Forecasted demands for critical therapeutic resources have tremendous uncertainty, largely due to uncertainties about the number and timing of patient arrivals. It is therefore essential to evaluate any process for managing supplies in view of this uncertainty. To support such evaluations, we developed a modeling framework that would allow an integrated assessment in the context of uncertainty quantification. At the time of writing there has been no need to execute this framework because adaptations of the medical system have been able to respond effectively to the outbreak. This report documents the framework and its implemented components should need later arise for its application.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗