Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Application of ecological, geological and oceanographic ERTS-1 imagery to Delaware's coastal resources planning

The author has identified the following significant results. Coastal vegetation species appearing in the ERTS-1 images taken of Delaware Bay have been correlated with ground truth vegetation maps and imagery obtained from high altitude overflights. Multispectral analysis of the high altitude photographs indicated that four major vegetation communities could be clearly discriminated from 60,000 feet altitude including: (1) salt marsh cord grass; (2) salt marsh hay and spike grass; (3) reed grass; and (4) high tide bush and sea myrtle. In addition, human impact can be detected in the form of fresh water impoundments built to attract water fowl, dredge-fill operations and other alterations of the coastal environment. Overlay maps matching the USGS topographic map size of 1:24,000 have been prepared showing the four wetland vegetation communities, fresh water impoundments, and alteration of wetlands by mosquito control ditching and dredge-fill operations. Using these maps, ERTS-1 images were examined by human interpreters and automated multispectral analyzers. Major plant communities of (1) Spartina alterniflora, (2) Spartina patens and Distichlis spicata, and (3) Iva frutescens and Baccharis halimifolia can be distinguished from each other and from surrounding uplands in ERTS-1 scanner bands 6 and 7.

Klemas, V.↗

Application of ecological, geological and oceanographic ERTS-1 imagery to Delaware's coastal resources planning

The author has identified the following significant results. Communities containing five different coastal vegetation species, developed marshlands, and fresh water impoundments have been identified in ERTS-1 images. Suspended sediment and circulation patterns in imagery from five ERTS-1 passes over Delaware Bay have been enhanced and correlated with predicted current patterns. Conclusions reached are: (1) ERTS-1 is suitable platform for observing suspended sediment patterns and water masses synoptically over large areas. (2) Suspended sediment acts as a natural tracer allowing photointerpreters to deduce gross current circulation patterns from ERTS-1 imagery. (3) Under atmospheric conditions encountered along the East Coast of the United States MSS band 5 seems to give the best representation of sediment load in upper one meter of water column. (4) In the ERTS-1 imagery the sediment patterns are delineated by three to four neighboring shades of grey. (5) Negative transparencies of the ERTS-1 images give better contrast whenever the suspended sediment tones fall within the first few steps of the grey scale. (6) Color density slicing helps delineate the suspended sediment patterns more clearly and differentiate turbidity levels.

Klemas, V.↗

Application of ecological geological and oceanographic ERTS-1 imagery to Delaware's coastal resources planning

The Author has identified the following significant results. Significant results obtained by analysis of digital ERTS-1 data are: (1) Statistical outputs indicating the reliability of discriminating eight coastal vegetation and land use classes on a given group of training sets included: (a) mean and standard deviation of response in each class chosen; (b) contribution tables indicating importance of each channel in discriminating each thematic class from the background; (c) scatter diagrams showing relationships of thematic spectral signatures in spectral space; and (d) classification table showing reliability (in percent) of identification of each thematic class. (2) Thematic color maps at a scale of 1:1,000,000 showing vegetation and land use categories for Delaware's entire coastal zone. (3) Thematic computer plots at specified smaller (i.e. 1:24,000) scales for comparison with existing map data such as U.S.G.S. topographic maps.

Klemas, V.↗

Water resources planning for rivers draining into Mobile Bay. Part 2: Non-conservative species transport models

Total coliform group bacteria were selected to expand the mathematical modeling capabilities of the hydrodynamic and salinity models to understand their relationship to commercial fishing ventures within bay waters and to gain a clear insight into the effect that rivers draining into the bay have on water quality conditions. Parametric observations revealed that temperature factors and river flow rate have a pronounced effect on the concentration profiles, while wind conditions showed only slight effects. An examination of coliform group loading concentrations at constant river flow rates and temperature shows these loading changes have an appreciable influence on total coliform distribution within Mobile Bay.

April, G. C.↗

Water resources planning for rivers draining into mobile bay

A hydrodynamic model describing water movement and tidal elevation is formulated, computed, and used to provide basic data about water quality in natural systems. The hydrodynamic model is based on two-dimensional, unsteady flow equations. The water mass is considered to be reasonably mixed such that integration (averaging) in the depth direction is a valid restriction. Convective acceleration, the Coriolis force, wind and bottom interactions are included as contributing terms in the momentum equations. The solution of the equations is applied to Mobile Bay, and used to investigate the influence that river discharge rate, wind direction and speed, and tidal condition have on water circulation and holdup within the bay. Storm surge conditions, oil spill transport, artificial island construction, dredging, and areas subject to flooding are other topics which could be investigated using the mathematical modeling approach.

Ng, S.↗

Image applications for coastal resource planning: Elkhorn Slough Pilot Project

The purpose of this project has been to evaluate the utility of digital spectral imagery at two levels of resolution for large scale, accurate, auto-classification of land cover along the Central California Coast. Although remote sensing technology offers obvious advantages over on-the-ground mapping, there are substantial trade-offs that must be made between resolving power and costs. Higher resolution images can theoretically be used to identify smaller habitat patches, but they usually require more scenes to cover a given area and processing these images is computationally intense requiring much more computer time and memory. Lower resolution images can cover much larger areas, are less costly to store, process, and manipulate, but due to their larger pixel size can lack the resolving power of the denser images. This lack of resolving power can be critical in regions such as the Central California Coast where important habitat change often occurs on a scale of 10 meters. Our approach has been to compare vegetation and habitat classification results from two aircraft-based spectral scenes covering the same study area but at different levels of resolution with a previously produced ground-truthed land cover base map of the area. Both of the spectral images used for this project were of significantly higher resolution than the satellite-based LandSat scenes used in the C-CAP program. The lower reaches of the Elkhorn Slough watershed was chosen as an ideal study site because it encompasses a suite of important vegetation types and habitat loss processes characteristic of the central coast region. Dramatic habitat alterations have and are occurring within the Elkhorn Slough drainage area, including erosion and sedimentation, land use conversion, wetland loss, and incremental loss due to development and encroachnnent by agriculture. Additonally, much attention has already been focused on the Elkhorn Slough due to its status as a National Marine Education and Research Reserve and as part of the Monterey Bay National Marine Sanctuary. These destinations have resulted in a rich collection of prior spatial and temporal habitat data.

Kvitek, Rikk G.↗

Requirements, Resource Planning and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44P on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the ISS ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment replanning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28S, the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority, with the Increment pairs 29 and 30, and 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Requirements, Resource Planning, and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44 Progress (44P) on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the International Space Station (ISS) ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment re-planning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28 Soyuz (28S), the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority; both Increment pairs 29 and 30, and Increment 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Peru Water Resources: Integrating NASA Earth Observations into Water Resource Planning and Management in Perus La Libertad Region

Developing countries often struggle with providing water security and sanitation services to their populations. An important aspect of improving security and sanitation is developing a comprehensive understanding of the country's water budget. Water For People, a non-profit organization dedicated to providing clean drinking water, is working with the Peruvian government to develop a water budget for the La Libertad region of Peru which includes the creation of an extensive watershed management plan. Currently, the data archive of the necessary variables to create the water management plan is extremely limited. Implementing NASA Earth observations has bolstered the dataset being used by Water For People, and the METRIC (Mapping EvapoTranspiration at High Resolution and Internalized Calibration) model has allowed for the estimation of the evapotranspiration values for the region. Landsat 8 imagery and the DEM (Digital Elevation Model) from the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) sensor onboard Terra were used to derive the land cover information, and were used in conjunction with local weather data of Cascas from Peru's National Meteorological and Hydrological Service (SENAMHI). Python was used to combine input variables and METRIC model calculations to approximate the evapotranspiration values for the Ochape sub-basin of the Chicama River watershed. Once calculated, the evapotranspiration values and methodology were shared Water For People to help supplement their decision support tools in the La Libertad region of Peru and potentially apply the methodology in other areas of need.

Padgett-Vasquez, Steve↗

PST and PARR: Plan specification tools and a planning and resource reasoning shell for use in satellite mission planning

Plan Specification Tools (PST) are tools that allow the user to specify satellite mission plans in terms of satellite activities, relevent orbital events, and targets for observation. The output of these tools is a set of knowledge bases and environmental events which can then be used by a Planning And Resource Reasoning (PARR) shell to build a schedule. PARR is a reactive planning shell which is capable of reasoning about actions in the satellite mission planning domain. Each of the PST tools and PARR are described as well as the use of PARR for scheduling computer usage in the multisatellite operations control center at Goddard Space Flight Center.

Mclean, David↗

Exploiting map plans as resources for action

When plans are used as programs for controlling the action of autonomous or teleoperated robots, their abstract representation can easily obscure a great deal of the critical knowledge that originally led to the planned course of action. An autonomous vehicle experiment is highlighted which illustrates how the information barriers created by abstraction can result in undesirable action. It is then shown how the same task can be performed correctly using plans as a resource for action. As a result of this simple change in outlook, problems requiring opportunistic reaction to unexpected changes in the environment can be solved.

Payton, David↗

Applications of multispectral imagery to water resources development planning in the lower Mekong Basin (Khmer Republic, Laos, Thailand and Viet-Nam)

The use of ERTS imagery for water resources planning in the lower Mekong Basin relates to three major issues: (1) it complements data from areas, which have been inaccessible in the past because of security; this concerns mainly forest cover of the watersheds, and geological features, (2) it refines ground surveys; this concerns mainly land forms, and soils of existing and planned irrigation perimeters, and (3) it provides new information, which would be almost or entirely impossible to detect with ground surveys or conventional photography; this concerns the mechanism of flooding and drainage of the delta; siltation of the Great Lake and mapping of acidity, possibly also of salinity, in the lower delta; sedimentation and fisheries in the Mekong Delta estuarine areas.

Vankiere, W. J.↗

The JPL Resource Allocation Planning and Scheduling Office (RAPSO) process

The Jet Propulsion Laboratory's Resource Allocation Planning and Scheduling Office is chartered to divide the limited amount of tracking hours of the Deep Space Network amongst the various missions in as equitable allotment as can be achieved. To best deal with this division of assets and time, an interactive process has evolved that promotes discussion with agreement by consensus between all of the customers that use the Deep Space Network (DSN). Aided by a suite of tools, the task of division of asset time is then performed in three stages of granularity. Using this approach, DSN loads are either forecasted or scheduled throughout a moving 10-year window.

RAPSO Resource Allocation Planning and Scheduling ↗