Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

arco (Assembled Resource-Constrained Optimization) [SWR-26-030]

Arco (Assembled Resource-Constrained Optimization) is a memory-smart optimization DSL and solver for LP and MIP problems on constrained hardware. The software is an optimization framework built around a KDL-based domain-specific language and a CLI compiler/solver. You write optimization models in .kdl files, and the arco CLI compiles, validates, inspects, and solves them. Language bindings (Python today, more planned) provide programmatic access to the same engine. Built for harder optimization problems on constrained resources, Arco is intentional about every allocation, careful with stack and heap behavior, and relentless about minimizing memory usage so more systems can run real workloads. Arco is built primarily for internal use within our organization. You are welcome to try it, but we make no guarantees about API stability or robustness at this stage

Sanchez Perez, Pedro Andres [National Laboratory o↗

Framework For Optimization Of Resources And Economics Ecosystem

The Framework for Optimization of ResourCes and Economics is a collection of software tools, models, and datasets acquired and developed under the Integrated Energy Systems (IES) program to enable analysis of technical and economic viability of myriad IES configurations. FORCE is the consolidating interface and data repository for all the IES toolsets ranging from macro technoeconomic analysis to transient process modeling and experimental validation for integrated energy systems.

Frick, KonorL↗

Introducing the GeoRePORT Resource Size Tool: Reporting on Geothermal Resource Size Estimations Using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT): Preprint

The Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) was developed with funding from the U.S. Department of Energy Geothermal Technologies Office to assist in identifying and pursuing long-term investment strategies through the development of a resource reporting protocol. The assessment protocols used in GeoRePORT allow for comparison of project attributes across locations and geological settings to understand the feasibility of geothermal development. This work introduces the Resource Size Tool, a new feature within the GeoRePORT package that compiles two independent methods for estimating geothermal resource size in terms of energy capacity in MW. Energy production potential for twenty-three case studies was estimated with the Resource Size Tool in order to 1) generate a reasonable range of resource size estimates for a particular geothermal field; 2) illustrate the advantages and limitations of each methodology (such as data input requirements, estimate accuracy and precision, and the appropriate circumstances of use); and 3) test the ability of the resource size tool to provide useful and accurate information for geothermal stakeholders. The tool employs two methods widely used in the geothermal industry: (1) USGS Volumetric and (2) Power Density. Results from our case studies show general overlap between these two methods in terms of resource size estimates; however, they also reveal key differences between the two approaches that should be considered when using such estimates to drive development. First, the two methods rely on different input parameters and therefore one method may be more appropriate and/or accurate for a given project than the other. Second, the Power Density method was found to generate wider ranges of resource size predictions, more consistently aligning with actual power production of the field but with larger scales of error; whereas the USGS Volumetric method predicts narrower ranges but tends to overestimate when compared to current MW production. Future work will refine variables used in the methods with input data from other sections of GeoRePORT and modify uncertainty levels based on the particular datasets used for a given project.

geological↗

Powering Data Centers with Clean Energy: A Techno-Economic Case Study of Nuclear and Renewable Energy Dependability

Rising data demands from artificial intelligence (AI) and large language models (LLMs) generating images, videos, and text have prompted increased need for larger and more robust data centers in the United States. Major companies interested in these larger data centers face the choice of linking them to existing regional grids, building stand-alone power supplies onsite, or a combination of both. The request, review, and approval process for new transmission lines to grids in the United States, however, has grown in recent years to times spans rivaling those of new construction for nuclear power plants. Building an islanded power supply for each data center is therefore becoming a prominent option. In this case study, several technologies are modeled in techno-economic simulations for long-term system costs subject to fixed electricity demand from a singular data center. A 250 MWe data center is assumed with additional 50 MWe for resiliency. Techno-economic simulations are conducted using the Holistic Energy Resource Optimization Network (HERON) software, which is a part of the Framework for Optimization of Resources and Economics (FORCE) tool suite. Technologies considered include solar, wind, lithium-ion batteries, and several types of nuclear reactors: large-scale reactors, small modular reactors, and microreactors. A low- and high-cost estimate for each technology is assumed to develop a range of expected economic performance. Low-cost estimates included several clean energy production tax credits. Different combinations of renewable energy generators with nuclear reactors are considered, ranging from a fully renewable-powered data center to a fully nuclear-powered data center. Historic time series of wind and solar availability from the Texas grid are used to train a reduced order model; this model then generates unique time series with similar characteristics of the training dataset. Multiple scenarios of weather and subsequent operations are simulated for each renewable-nuclear combination to determine total costs throughout the project lifetime. Fully renewable-powered configurations required large amounts of installed capacity (GW scale) in the simulations to meet the fixed demand of the data center. This is due to some scenarios in the historical dataset which captured low-wind and low-solar days, requiring over-building of these technologies as well as batteries to compensate for the low amounts of electricity generation. Fully nuclear-powered configurations outperformed the fully renewable and mixed renewable-nuclear configurations in terms of cost, with ranges between $1B and $10B in 2023 USDs compared to $40B+ for fully renewable configurations. Of the nuclear technologies, small modular reactors performed better economically than large-scale nuclear models due to lower projected capital costs, and both performed better than the microreactor models. These results demonstrate the applicability of firm, dispatchable electricity resources from baseload generators like nuclear power plants for operating facilities that run at constant power without daily variability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bridging Equipment Reliability Data and Robust Decisions in a Plant Operation Context

In order to reduce operation and maintenance (O&M) costs, nuclear power plants (NPPs) are moving from corrective and periodic maintenance to predictive maintenance strategies. Such transition requires changes on the data that needs to be retrieved and on the type of decision processes to be employed. Advanced monitoring and data analysis technologies are essential to support predictive strategies. They can in fact provide precise information about health of a component, track its degradation trends, and provide information of its expected failure time. With such information, maintenance operations for a component can be performed right before its expected failure time. This dynamic context of O&M operations requires new methods to analyze data, propagate component health information from the component to the system level, and optimize plant resources. In this respect, the risk informed asset management (RIAM) project has been tasked to develop and test this new class of methods into a risk analytics toolset. This toolset consists of data analytics tools coupled with reliability methods designed to manage plant assets and performances in a predictive maintenance context. This report shows the latest improvements on such development and the initial testing of our methods on the three main research areas that the RIAM project is focusing on. These areas are the following: equipment reliability data analytics, system reliability modeling, and plant resources optimization methods. We show how the methods developed in these areas can support predictive maintenance strategies by: 1) analyzing equipment reliability data (either in numeric and textual form), 2) assessing component and system health through an innovative margin-based reliability approach, and 3) identifying the most critical components and set optimal maintenance schedule based on plant economic and operational constraints.

97 MATHEMATICS AND COMPUTING↗

Complete Demonstration of a Prototype Version of FORCE User Interface and Conduct Analyst Survey Collecting Feedback on Interface Features and Usability

In 2024 the US Department of Energy (DOE) Office of Nuclear Energy (NE) Integrated Energy System (IES) program continued to develop the Framework for Optimization of Resources and Economics (FORCE) analysis ecosystem into a more traditional toolset with simplified software installation, automated workflows, and interactive results visualization. The DOE-NE Nuclear Energy Advanced Modeling and Simulation (NEAMS) Workbench continued to be leveraged for user input, application workflow and runtime environment, and interactive results visualization capabilities. This report documents the demonstration of a FORCE User Interface (UI) prototype and the results of a survey of analysts’ using the Holistic Energy Resource Optimization Network (HERON) tool in FORCE with the prototype UI.

97 MATHEMATICS AND COMPUTING↗

FORCE Development Status Update: Vertical Integration and Benchmarking of System Dynamics

Recent efforts to establish effective models for grid energy analysis, especially given the increase in variable renewable energy (VRE) sources and the economic challenges faced by traditional nuclear energy, have generated new technological considerations. One effort to improve the economic viability of nuclear power involves investigating integrated energy systems (IES) which include secondary energy systems that introduce flexibility and secondary market possibilities to existing and perceived future nuclear energy generation technologies. To analyze the technical and economic potential of IES, the Framework for Optimization of Resources and Economics (FORCE) tool suite was developed through a collaboration among national laboratories. Within the FORCE tool suite, the Holistic Energy Resource Optimization Network (HERON) provides algorithms for analyzing the long-term viability of potential IES technologies, while HYBRID provides algorithms and models to achieve high-resolution analysis of coupling physics over a short time period. Continued maturing of the FORCE tool suite requires further interconnections between the various tools in the suite in order to ensure consistent analysis. Analyses performed by applying HYBRID to transient process modeling should be easily harvestable as inputs to HERON analyses. The first item in this status update is a demonstration of an automated data pipeline for loading data from HYBRID into HERON analyses. Application of HYBRID results to HERON, as part of using the FORCE tool suite, relies on robust modeling assumptions for the various models included in HYBRID. The second result of this status update is the benchmarking and validation of cost and operational data, with a particular focus on natural gas energy generators. These generators are benchmarked with a focus on contrasting them with proposed thermal energy storage (TES) technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FORCE Regression Testing

Via programs including the Light Water Reactor Sustainability and Integrated Energy Systems, the U.S. Department of Energy has invested in the Framework for Optimization of ResourCes and Economics (FORCE) software framework (Idaho National Laboratory 2024a) for the technical and economic analysis of nuclear-integrated energy systems (IES). Nuclear IES expand the use of nuclear from traditional baseload electricity generation to a flexible and adaptive source of combined heat and power. Nuclear heat can be used in the production of a variety of energy currencies such as hydrogen and ammonia as well as other heat applications including water desalination and district heating. FORCE is designed with the intent to provide interconnected analysis tools that enable the accurate technical and economic assessment of specific nuclear IES configurations for individual energy markets. FORCE consists of three main analysis pathways: HYBRID (Idaho National Laboratory 2024b), which contains high-resolution physical models for IES; Holistic Energy Resource Optimization Network (HERON) (Idaho National Laboratory 2024c), which analyzes IES long-term economic viability; and Optimization of Real-time Capacity Allocation (ORCA) (Idaho National Laboratory 2024d), designed for real-time control of IES via digital twins and optimal decision making, including autonomous and remote operation research. Development of the FORCE ecosystem is guided by three pillars: capability, which assures that the computational requirements of IES analysis are met by the software tools; reliability, which provides for consistent code performance and expected behaviors; and accessibility, which lowers the barrier to entry for using the software and accelerates analysis by users beyond the FORCE primary developers. Reliability of the FORCE ecosystem is established according to the American Nuclear Society?s Nuclear Quality Assurance (NQA-1) program [American Society of Mechanical Engineers 1982], with specific levels of software quality assurance (SQA) within NQA-1 applied to each software tool in FORCE. As the tools within FORCE have matured, some integration algorithms to accurately connect the software tools for holistic analysis have been developed and deployed within the FORCE software repository. In accordance with NQA-1 standards, regression tests are required to guarantee the software performs consistently even when new capabilities are added to the software. In this report, we document the deployment of both unit tests, which test the consistent behavior of small pieces of the FORCE code base, as well as integration tests, which test the consistent performance of full use cases for the FORCE integration algorithms. We further document the encapsulation of these tests within a test harness, which collectively checks for each successful test completion on demand. Finally, we document the automation of the test harness using GitHub Actions [GitHub 2024], which require all tests succeed before any new capability or other changes can be added to the FORCE integration software

97 MATHEMATICS AND COMPUTING↗

Optimal Renewable Resource Allocation and Load Scheduling of Resilient Communities

This paper presents a methodology for enhancing community resilience through optimal renewable resource allocation and load scheduling in order to minimize unserved load and thermal discomfort. The proposed control architecture distributes the computational effort and is easier to be scaled up than traditional centralized control. The decentralized control architecture consists of two layers: The community operator layer (COL) allocates the limited amount of renewable energy resource according to the power flexibility of each building. The building agent layer (BAL) addresses the optimal load scheduling problem for each building with the allowable load determined by the COL. Both layers are formulated as a model predictive control (MPC) based optimization. Simulation scenarios are designed to compare different combinations of building weighting methods and objective functions to provide guidance for real-world deployment by community and microgrid operators. The results indicate that the impact of power flexibility is more prominent than the weighting factor to the resource allocation process. Allocation based purely on occupancy status could lead to an increase of PV curtailment. Further, it is necessary for the building agent to have multi-objective optimization to minimize unserved load ratio and maximize comfort simultaneously.

model predictive control↗

Optimizing Labor Resources at Manufacturing Enterprises

Attention focuses on the selection of mathematical models and the formulation of algorithms for organizational decision making in optimizing labor resources at manufacturing enterprises. Examples of labor optimization are presented.

42 ENGINEERING↗

Renewable Energy Resources Portfolio Optimization in the Presence of Demand Response

In this paper we introduce a simple cost model of renewable integration and demand response that can be used to determine the optimal mix of generation and demand response resources. The model includes production cost, demand elasticity, uncertainty costs, capacity expansion costs, retirement and mothballing costs, and wind variability impacts to determine the hourly cost and revenue of electricity delivery. The model is tested on the 2024 planning case for British Columbia and we find that cost is minimized with about 31% renewable generation. We also find that demand responsive does not have a significant impact on cost at the hourly level. The results suggest that the optimal level of renewable resource is not sensitive to a carbon tax or demand elasticity, but it is highly sensitive to the renewable resource installation cost.

Behboodi, Sahand↗

Solar PV, Wind Generation, and Load Forecasting Dataset for ERCOT 2018: Performance-Based Energy Resource Feedback, Optimization, and Risk Management (P.E.R.F.O.R.M.)

This report describes the Advanced Research Projects Agency-Energy Performance-Based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) Electric Reliability Council of Texas (ERCOT) dataset consisting of load, solar, and wind deterministic and probabilistic forecasts at three timescales. This dataset consists of 1 year of time-coincident load, wind, and solar actuals and probabilistic forecasts for a region similar to ERCOT. All the data are stored in Hierarchical Data Format 5 (HDF5) files and have been uploaded to an Amazon Web Services repository. The ERCOT data set has 2 years (2017, 2018) of actuals and 1 year (2018) of probabilistic forecasts. These data are provided at various spatial (i.e., site-level, zone-level, and system-level) and temporal scales (i.e., day-ahead, intraday, and intra-hour). Specifically, data are provided for 125 existing wind sites, 22 existing solar sites, 139 proposed wind sites, and 204 proposed solar sites.

14 SOLAR ENERGY↗

Machine learning-driven predictive resource management in complex science workflows

Here, the collaborative efforts of large communities in science experiments, often comprising thousands of global members, reflect a monumental commitment to exploration and discovery. Recently, advanced and complex data processing has gained increasing importance in science experiments. Data processing workflows typically consist of multiple intricate steps, and the precise specification of resource requirements is crucial for each step to allocate optimal resources for effective processing. Estimating resource requirements in advance is challenging due to a wide range of analysis scenarios, varying skill levels among community members, and the continuously increasing spectrum of computing options. One practical approach to mitigate these challenges involves initially processing a subset of each step to measure precise resource utilization from actual processing profiles before completing the entire step. While this two-staged approach enables processing on optimal resources for most of the workflow, it has drawbacks such as initial inaccuracies leading to potential failures and suboptimal resource usage, along with overhead from waiting for initial processing completion, which is critical for fast-turnaround analyses. In this context, our study introduces a novel pipeline of machine learning models within a comprehensive workflow management system, the Production and Distributed Analysis (PanDA) system. These models employ advanced machine learning techniques to predict key resource requirements, overcoming challenges posed by limited upfront knowledge of characteristics at each step. Accurate forecasts of resource requirements enable informed and proactive decision-making in workflow management, enhancing the efficiency of handling diverse, complex workflows across heterogeneous resources.

97 MATHEMATICS AND COMPUTING↗

GlideinBenchmark: collecting resource information to optimize provisioning

Choosing the right resource can speedup jobs completion, better utilize the available hardware and visibly reduce costs, especially when renting computers on the cloud. This was demonstrated in earlier studies on HEPCloud. But the benchmarking of the resources proved to be a laborious and time-consuming process. This paper presents GlideinBenchmark, a new Web application leveraging the pilot infrastructure of GlideinWMS to benchmark resources, and shows how to use the data collected and published by GlideinBenchmark to automate the optimal selection of resources. An experiment can select the benchmark or the set of benchmarks that most closely evaluate the performance of its workflows. With GlideinBenchmark and the help of the GldieinWMS Factory it controls the benchmark execution. Finally, a scheduler like HEPCloud’s Decision Engine can use the results to optimize resource provisioning.

Mambelli, Marco↗

GlideinBenchmark: collecting resource information to optimize provisioning

Choosing the right resource can speed up job completion, better utilize the available hardware, and visibly reduce costs, especially when renting computers in the cloud. This was demonstrated in earlier studies on HEPCloud. However, the benchmarking of the resources proved to be a laborious and time-consuming process. This paper presents GlideinBenchmark, a new Web application leveraging the pilot infrastructure of GlideinWMS to benchmark resources, and it shows how to use the data collected and published by GlideinBenchmark to automate the optimal selection of resources. An experiment can select the benchmark or the set of benchmarks that most closely evaluate the performance of its workflows. GlideinBenchmark, with the help of the GlideinWMS Factory, controls the benchmark execution. Finally, a scheduler like HEPCloud's Decision Engine can use the results to optimize resource provisioning.

Mambelli, Marco [Fermilab] (ORCID:0000000294892681↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

Bioenergy landscapes drive trophic shifts in generalist ants

Changes in trophic niche—the pathways through which an organism obtains energy and nutrients—are a fundamental way in which organisms respond to environmental conditions. But the capacity for species to alter their trophic niches in response to global change, and the ways they do so when able, remain largely unknown. Here we examine food webs in three long–term and large–scale experiments to test how resource availability and nutritional requirements interact to determine an organism's trophic niche in the context of one of the largest global trends in land use—the rise in bioenergy production. Here, we use carbon and nitrogen stable isotope analyses to characterize arthropod food webs across three biofuel crops representing a gradient in plant resource richness (corn monocultures, fields dominated by native switchgrass and restored prairie), and to quantify changes in the trophic niche of a widespread generalist ant species across habitats. In doing so, we measure the effects of basal resource richness on food chain length, niche breadth and trophic position. We frame our results in the context of two hypotheses that explain variation in trophic niche—the niche variation hypothesis which emphasizes the importance of resource diversity and ecological opportunity, and the optimal diet hypothesis which emphasizes dietary constraints and the availability of optimal resources. Increasing plant richness lengthened food chains by 10%–20% compared to monocultures. Niche breadths of generalist ants did not vary with resource richness, suggesting they were limited by optimal diet requirements and constraints rather than by ecological opportunity. The ants instead responded to changes in plant richness by shifting their estimated trophic position. In resource–poor monocultures, the ants were top predators, sharing a trophic position with predatory spiders. In resource–rich environments, in contrast, the ants were omnivores, relying on a mix of animal prey and plant–based resources. In addition to highlighting novel ecosystem impacts of alternate bioenergy landscapes, our results suggest that niche breadth and trophic diversification depend more on the presence of optimal resources than on ecological opportunity alone.

59 BASIC BIOLOGICAL SCIENCES↗

GeoRePORT Case Study Examples: Reporting Using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT)

The GeoRePORT System is based on the concept that a geothermal system can be described both in terms of the quality of the geothermal resource as it relates to the potential to extract heat (Resource Grade) and the progress of research and development over the lifetime of the project (Project Readiness Level). Case study examples using the GeoRePORT tool are shared and discussed.

15 GEOTHERMAL ENERGY↗