Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource modeling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Assessing Inverter-Based Resources Modeling Gaps in Commonly Used Short-Circuit Programs

Future bulk power systems are expected to operate with a high penetration of inverter-based resources (IBR). This is anticipated to fundamentally change the system’s short-circuit behaviors and demand a change in existing transmission line protection settings or schemes. Phasor-domain short circuit programs (e.g., ASPEN, CAPE, and CYME) remain the mainstream tools for developing protection settings. However, the system protection community has shared concerns about the accuracy of IBR models in short-circuit programs. This report compares the performance of existing generic IBR models in short-circuit programs with detailed electro-magnetic transient (EMT) models provided by several different IBR manufacturers in PSCAD, to quantify the short-circuit program’s IBR model accuracy, assess their ability to replicate individual IBR controls such as negative sequence current injections, and identify specific gaps in the existing generic phasor-domain IBR models that are currently available.

42 ENGINEERING↗

Enhanced Frequency Support Scheme of Generic Inverter-Based Resource Models for Renewable-Dominated Power Grids

The frequency response of SG-dominated power grids is predictable ahead of an occurrence of a frequency event because the frequency response of SGs is consistent, and it can be inferred from the swing equation [1]. However, increasing the portion of IBRs in an SG-dominated power grid might make the characteristics of the conventional power grids no longer valid because this changing resource mix affects grid dynamics and controls [2]. Thus, maintaining these characteristics greatly benefits the control and operation of the power grids with high penetration of IBRs. To maintain these characteristics in IBR-dominated power grids, IBRs should have frequency response capability similar to that of an SG. The WECC modeling validation subcommittee has developed generic IBR models for large system planning [3]-[5]. These models can represent various vendors' dynamic behavior for WTG, PV, and ESS [5]. The current generic IBR models approved by WECC can provide frequency response only from droop control loops in REPC models [6], [7]. The contribution of the loops is proportional to the frequency deviation from the nominal frequency. Thus, it presents an insufficient contribution to arrest frequency variation compared to the frequency response of SGs because it allows a high ROCOF in the early stage of frequency events. This shortfall will become greater as the PL of IBRs increases in power grids. Controller enhancement for the generic IBR models is required to secure the frequency stability under high PL of IBRs as in the SG-dominated power grids. This paper proposes a control extension for the generic IBR models to enhance the frequency support capabilities and discusses the classification of frequency support for the different types of IBR considering their operating constraints. An inertial control scheme is implemented in the REPC and REEC models of the generic IBR models to achieve these objectives. The inertial control scheme includes the following stages: Control area data acquisition, inertia time constant estimation, IBR-related constraint check, IBR contribution determination, and inertial response provision. In the scheme, a REPC acquires control area data from a system operator and estimates a total inertia time constant for the control area the applicable IBR power plant belongs. Then, the estimated inertial time constant is transferred to each IBR controller—REEC—within the power plant. Each REEC checks the availability of applicable IBR for inertial response participation. If the IBR is available, the REEC amplifies the estimated inertial time constant to utilize it for inertial response provision. In this way, the proposed inertial response scheme extends the functionality of the generic IBR models to provide SG-like frequency response within their constraints. Various scenarios considering different IBR types, IBR penetration levels, and frequency control schemes were simulated and compared in an IEEE 39-bus system using PSCAD simulator to verify the effectiveness of the proposed scheme.

Kim, Jinho↗

Wildland inventory and resource modeling for Douglas and Carson City Counties, Nevada, using LANDSAT and digital terrain data

The potential of using LANDSAT satellite imagery to map and inventory pinyon-juniper desert forest types in Douglas and Carson City Counties, Nevada was demonstrated. Specific map and statistical products produced include land cover, mechanical operations capability, big game winter range habitat, fire hazard, and forest harvestability. The Nevada Division of Forestry determined that LANDSAT can produce a reliable and low-cost resource data. Added benefits become apparent when the data are linked to a geographical information system (GIS) containing existing ownership, planning, elevation, slope, and aspect information.

Brass, J. A.↗

Resource modeling: A reality for program cost analysis

The approach, implementation, operation, and utilization of a model to establish capital investment and operational costs for the Program is presented. These are based on their interrelationships, dependencies, and alternative actions.

Fouts, L. D.↗

TASKILLAN - A simulation to predict the validity of multiple resource models of aviation workload

A study to establish the validity of five predictive models of workload in the context of a controlled helicopter mission, TASKILLAN, is presented. Ten subjects performed simulations involving combinations of a low level flight task with three cognitive side tasks pertaining to navigation, spatial awareness, and computation. It is found that the best predictors of subjective workload are relativly simple models that integrate the total demands of task over time.

Wickens, Christopher D.↗

Resource utilization model for the algorithm to architecture mapping model

The analytical model for resource utilization and the variable node time and conditional node model for the enhanced ATAMM model for a real-time data flow architecture are presented in this research. The Algorithm To Architecture Mapping Model, ATAMM, is a Petri net based graph theoretic model developed at Old Dominion University, and is capable of modeling the execution of large-grained algorithms on a real-time data flow architecture. Using the resource utilization model, the resource envelope may be obtained directly from a given graph and, consequently, the maximum number of required resources may be evaluated. The node timing diagram for one iteration period may be obtained using the analytical resource envelope. The variable node time model, which describes the change in resource requirement for the execution of an algorithm under node time variation, is useful to expand the applicability of the ATAMM model to heterogeneous architectures. The model also describes a method of detecting the presence of resource limited mode and its subsequent prevention. Graphs with conditional nodes are shown to be reduced to equivalent graphs with time varying nodes and, subsequently, may be analyzed using the variable node time model to determine resource requirements. Case studies are performed on three graphs for the illustration of applicability of the analytical theories.

Stoughton, John W.↗

Description of a Website Resource for Turbulence Modeling Verification and Validation

The activities of the Turbulence Model Benchmarking Working Group - which is a subcommittee of the American Institute of Aeronautics and Astronautics (AIAA) Fluid Dynamics Technical Committee - are described. The group s main purpose is to establish a web-based repository for Reynolds-averaged Navier-Stokes turbulence model documentation, including verification and validation cases. This turbulence modeling resource has been established based on feedback from a survey on what is needed to achieve consistency and repeatability in turbulence model implementation and usage, and to document and disseminate information on new turbulence models or improvements to existing models. The various components of the website are described in detail: description of turbulence models, turbulence model readiness rating system, verification cases, validation cases, validation databases, and turbulence manufactured solutions. An outline of future plans of the working group is also provided.

Rumsey, Christopher L.↗

Uncertainty analysis of Resource Demand Model for Covid-19

As part of the Department of Energy response to the novel coronavirus pandemic of 2020, a modeling effort was sponsored by the DOE Office of Science. One task of this modeling effort at Sandia was to develop a model to predict medical resource needs given various patient arrival scenarios. Resources needed include personnel resources (nurses, ICU nurses, physicians, respiratory therapists), fixed resources (regular or ICU beds and ventilators), and consumable resources (masks, gowns, gloves, face shields, sedatives). This report documents the uncertainty analysis that was performed on the resource model. The uncertainty analysis involved sampling 26 input parameters to the model. The sampling was performed conditional on the patient arrival streams that also were inputs to the model. These patient arrival streams were derived from various epidemiology models and had a significant effect on the projected resource needs. In this report, we document the sampling approach, the parameter ranges used, and the computational workflow necessary to perform large-scale uncertainty studies for every county and state in the United States.

59 BASIC BIOLOGICAL SCIENCES↗

Payload accommodation and development planning tools - A Desktop Resource Leveling Model (DRLM)

The Desktop Resource Leveling Model (DRLM) has been developed as a tool to rapidly structure and manipulate accommodation, schedule, and funding profiles for any kind of experiments, payloads, facilities, and flight systems or other project hardware. The model creates detailed databases describing 'end item' parameters, such as mass, volume, power requirements or costs and schedules for payload, subsystem, or flight system elements. It automatically spreads costs by calendar quarters and sums costs or accommodation parameters by total project, payload, facility, payload launch, or program phase. Final results can be saved or printed out, automatically documenting all assumptions, inputs, and defaults.

Hilchey, John D.↗

Resource Tracking Model Updates and Trade Studies

The Resource Tracking Model has been updated to capture system manager and project manager inputs. Both the Trick/General Use Nodal Network Solver Resource Tracking Model (RTM) simulator and the RTM mass balance spreadsheet have been revised to address inputs from system managers and to refine the way mass balance is illustrated. The revisions to the RTM included the addition of a Plasma Pyrolysis Assembly (PPA) to recover hydrogen from Sabatier Reactor methane, which was vented in the prior version of the RTM. The effect of the PPA on the overall balance of resources in an exploration vehicle is illustrated in the increased recycle of vehicle oxygen. Case studies have been run to show the relative effect of performance changes on vehicle resources.

Chambliss, Joe↗

Quantifying Uncertainties in Modeling Wind Resource Data from Different PBL Schemes in the WRF Model: A Case Study Over the Puerto Rico Region

This study examines the modeling uncertainty of wind resource data stemming from the use of various planetary boundary layer (PBL) parameterizations available in the Weather Research and Forecasting (WRF) model. WRF-based wind simulations spanning 20 years at 3-km resolution using 11 different PBL schemes are used to objectively investigate the uncertainty in modeling wind speed for land-based wind (LBW) and offshore wind (OSW) locations in Puerto Rico. The uncertainty in the wind modeling for the 20-year dataset is quantified using the spread index (SI) and standard deviation (SD). For virtual LBW and OSW sites, the SI and SD values are analyzed as calculated across various spatial and temporal scales. Because the PBL's atmospheric stability conditions can be characterized into two dominant categories, the study focuses on analyzing the SI and SD for daytime (mainly unstable PBL conditions) and nighttime (mainly stable PBL conditions). For wind shear (10 m-200 m) at the OSW and LBW sites, WRF-based numerical experiments indicate the following SI (or SD) ranges: 39%-94% (0.74 m/s-1.44 m/s) during the daytime for OSW, 50%-75% (0.68 m/s-1.19 m/s) during the daytime for LBW, 37%-60% (0.73 m/s-1.12 m/s) during the nighttime for OSW, and 57%-143 % (0.65 m/s-1.43 m/s) during the nighttime for LBW. While a high SI is observed when modeling LBW during the nighttime, there are notable modeling uncertainties during the daytime on the leeward side of the orographic barriers for Puerto Rico.

17 WIND ENERGY↗

Resource Tracking Model Updates and Trade Studies

The Resource tracking model has been updated to capture system manager and project manager inputs. Both the Trick/GUNNS RTM simulator and the RTM mass balance spreadsheet have been revised to address inputs from system managers and to refine the way mass balance is illustrated. The revisions to the RTM included addition of a Plasma Pyrolysis Assembly (PPA) to recover hydrogen from Sabatier reactor methane which was vented in the prior version of the RTM. The effect of the PPA on the overall balance of resources in an exploration vehicle is illustrated in the increased recycle of vehicle oxygen. Additionally simulation of EVAs conducted from the exploration module was added. Since the focus of the exploration module is to provide a habitat during deep space operations the EVA simulation approach to EVA is based on ISS EVA protocol and processes. Case studies have been run to show the relative effect of performance changes on vehicle resources.

Chambliss, Joe↗