Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reserve”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Association of AK4 Protein From Stem Cell–Derived Neurons With Cognitive Reserve

Background and Objectives: Identifying protein targets that provide cognitive reserve is a strategy to prevent and treat Alzheimer disease and Alzheimer disease related dementias (AD/ADRD). Previous studies using bulk human brain tissue reported 12 proteins associated with cognitive reserve. This study examined whether the same proteins from induced neurons (iNs) are associated with cognitive reserve of their human donors. Methods: Here, induced pluripotent stem cell (iPSC) lines were generated from cryopreserved peripheral blood mononuclear cells of older adults who were autopsied as part of the Religious Orders Study or Rush Memory and Aging Project. Neurons were induced from iPSCs using a standard neurogenin2 protocol. Tandem mass tag proteomics analyses were conducted on iNs day 21. Cognitive reserve of their human donors was measured as person-specific slopes of cognitive change not accounted for by common neuropathologies. Results: The 53 human donors died at a mean age of 91 years, all were non-Latino White, and 36 (67.9%) were female. Eighteen were diagnosed with Alzheimer dementia proximate to death, and 34 had pathologic AD diagnosis at autopsy. Approximately 60% of the donors had above-average cognitive reserve such that their cognition declined slower than an average person with comparable burdens of neuropathologies. Eight of the 12 candidate proteins were quantified in iNs proteomics analyses. Higher adenylate kinase 4 (AK4) expression in iNs was associated with lower cognitive reserve, consistent with the previous report for brain AK4 expression. Discussion: By replicating cortical protein associations with cognitive reserve in human iNs, these data provide a valuable molecular readout for studying complex clinical phenotypes such as cognitive reserve in a dish.

59 BASIC BIOLOGICAL SCIENCES↗

Method and system for providing flexible reserve power for power grid

An optimization-based method and system is disclosed to enable heterogeneous loads and distributed energy resources (DERs) to participate in grid ancillary services, such as spinning and non-spinning reserves, and ramping reserves. The method includes receiving inputs for decision parameters for optimizing an objective for obtaining flexible reserve power, solving the objective for obtaining flexible reserve power, determining a reserve power schedule for a prediction horizon for providing flexible reserve power based on the objective, generating a service bid based on the reserve power schedule for the power grid; and when the service bid is accepted, providing flexible reserve power to the power grid based on the service bid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Machine Learning Derived Dynamic Operating Reserve Requirements in High-Renewable Power Systems

Accurately forecasting wind and solar power output poses challenges for deeply decarbonized electricity systems. Grid operators must commit resources to provide reserves to ensure reliable operations in the face of forecast errors, a process which can increase fuel consumption and emissions. We apply neural network-based machine learning to expand the usefulness of median point forecast data by creating probabilistic distributions of short-term uncertainty in demand, wind, and solar forecasts that adapt to prevailing grid conditions. Machine learning derived estimates of forecast errors compare favorably to estimates based on incumbent methods. Reserves derived from machine learning are usually smaller than values derived using incumbent methods, which enables fuel savings during most hours. Machine learning reserves are generally larger than incumbent reserves during times of higher forecast error, potentially improving system reliability. Performance is tested using multi-stage production simulation modeling of the California Independent System Operator (CAISO) system. Machine learning reserves provide production cost and greenhouse gas (GHG) emission reductions of approximately 0.3% relative to historical 2019 requirements. Savings in the 2030 timeframe are highly dependent on battery storage capacity. At lower levels of battery capacity, savings of 0.4% from machine learning reserves are shown. Significant quantities of battery storage are expected to be added to meet California's resource adequacy needs and GHG reduction targets. Addition of these batteries saturate reserve needs and results in minimal within-hour balancing costs in 2030.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Zonal Reserve Requirements for Improved Energy Deliverability with Wind Power

In power systems with high penetration of renewable energy resources, uncertainty and variability of these stochastic resources introduce additional challenges for the operation of power systems. To improve the power system's reliability in the face of uncertainty, reserves are required as additional generation capacity to rebalance the power system following random disturbances. However, reserve deliverability is not guaranteed, because it may encounter potential transmission line congestion. Zonal reserve requirements can address this issue, but operators lack efficient ways to allocate reserves to zones while accounting for wind power forecast uncertainty. Herein we propose a methodology for probabilistic zonal reserve requirements to address wind power forecast uncertainties. This method estimates the probability distribution of line flows based on the system generation margin and injection shift factor. This estimate is then used to construct pre-defined and post-zonal reserve requirements. Case studies demonstrate that the proposed method efficiently schedules energy and reserves to balance energy and manage deliverability with wind power forecast uncertainty.We also discuss operational implications of the proposed method.

17 WIND ENERGY↗

Operating Dynamic Reserve Dimensioning Using Probabilistic Forecasts

The rapid integration of variable energy sources (VRES) into power grids increases variability and uncertainty of the net demand, making the power system operation challenging. Operating reserve is used by system operators to manage and hedge against such variability and uncertainty. Traditionally, reserve requirements are determined by rules-of-thumb (static reserve requirements, e.g., NERC Reliability Standards), and more recently, dynamic reserve requirements from tools and methods which are in the adoption process (e.g., DynADOR, DRD, and RESERVE, among others). While these methods/tools significantly improve the static rule-of-thumb approaches, they rely exclusively on deterministic data (i.e., best guess only). Consequently, these methods disregard the probabilistic uncertainty thresholds associated with specific days and their weather conditions (i.e., best guess plus probabilistic uncertainty). This work presents practical approaches to determine the operating reserve requirements leveraging the wealth information from probabilistic forecasts. Proposed approaches are validated and tested using actual data from the CAISO system. Furthermore, results show the benefits in terms of risk reduction of considering the probabilistic forecast information into the dimensioning process of operating reserve requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Geothermal Reserve Pits: Considerations for Installation on BLM-Administered Lands

Reserve pits, also known as sumps, are a common aspect of geothermal drilling operations. This paper describes the Bureau of Land Management's regulatory authorities and key environmental considerations associated with geothermal reserve pits. Reserve pit design, the need for environmental compliance measures, and reclamation approaches will vary depending on site-specific conditions. Groundwater and wildlife impacts are the most common environmental considerations related to reserve pits. In some cases, regulations or groundwater or soil conditions necessitate the use of a synthetic liner. However, the chemical composition of most geothermal drilling fluids and muds, completion fluids, and produced fluids that are discharged to reserve pits does not warrant pit liners. The potential for hazardous fluids, high water temperatures, and entrapment are concerns for wildlife. Common wildlife impact avoidance and mitigation measures include fencing, netting, and escape ramps. The need for these measures depends on localized site and environmental conditions. There are requirements to reclaim reserve pits following geothermal drilling operations. Reserve pits often remain in place to accommodate multiple phases of drilling and well testing. They are eventually backfilled and decommissioned.

BLM↗

Allocating Reserves in Active Distribution Systems for Tertiary Frequency Regulation

This paper proposes a cooperative game theory-based approach for reserve optimization to enable distributed energy resources (DERs) participate in tertiary frequency regulation. Tertiary frequency regulation schemes ensure that reserve requirements of primary and secondary frequency regulation are fulfilled with a minimum cost. While the available reserve from a single distribution system may not suffice tertiary frequency regulation, stacked reserve from several distribution systems can enable them participate in tertiary frequency regulation at scale. In this paper, a two-stage strategy is proposed to effectively and precisely allocate spinning reserve requirement from each DER in distribution systems. In the first stage, two types of characteristic functions are computed: worthiness index (WI) and power loss reduction (PLR). In the second stage, the equivalent Shapley values are computed based on the characteristic functions, which are used to determine distribution factors for reserve allocation among DERs. The effectiveness of the proposed method for allocating reserves among DERs is demonstrated through several case studies on modified versions of the IEEE 13-node and 33-node distribution systems.

Gautam, Mukesh↗

An empirical analysis of supply offers in the ERCOT operating reserves markets

Here, this paper seeks to improve theoretical and empirical understanding of supplier dynamics in wholesale markets for operating reserves, which have been understudied compared to energy markets. We begin by identifying several economic factors that unit owners may consider when submitting offers into operating reserves auctions in two-stage, co-optimized markets common across much of North America. Next, we analyze historical offer data from the Electric Reliability Council of Texas (ERCOT) market to assess whether actual reserve market behavior aligns with expectations based on economic theory, as well as with commonly used assumptions in electricity market modeling efforts. We find that the aggregate supply of operating reserves in ERCOT varies meaningfully over time, becoming more expensive during summer afternoons, which is consistent with theoretical expectations but contradicts the typical modeling assumption of temporally invariant reserve offers. Analysis of offers made by individual units uncovers additional insights, such as the existence of large offer pattern differences by unit owner and the tendency of battery storage units to submit very low offer prices. We conclude by discussing how our findings can be integrated into electricity market modeling assumptions to improve alignment with observed operating reserve offer inputs and pricing outcomes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

On Secured Spinning Reserve Deployment of Energy-Limited Resources Against Contingencies

Featured with fast response abilities and high ramp rates, energy storage systems (ESS), such as pumped-storage hydropower (PSH) plants and battery storage systems (BSS), are considered as key first-responders to provide spinning reserve in response to system contingencies. However, ESSs are energy-limited resources, and their sustained spinning reserve deployment is restricted by the stored energy and available capacity. Indeed, the spinning reserve deployment against contingencies may deviate actual state-of-charge (SOC) from the scheduled value, inducing potential SOC boundary violations and non-dispatchability in later hours. This paper proposes the post-contingency operation model and the spinning reserve secure constraints to address these issues. The post-contingency operation model describes that spinning reserve from ESSs is promptly deployed when contingency occurs, and then gradually substituted by quick-start units when they are switched online. By leveraging this operation strategy, spinning reserve secure constraints in terms of SOC headrooms are adopted to guarantee its deplorability. Furthermore, a modified IEEE 118-bus system with multiple PSHs and BSSs is used to verify the proposed approach.

13 HYDRO ENERGY↗

A Deep Reinforcement Learning-based Reserve Optimization in Active Distribution Systems for Tertiary Frequency Regulation

Federal Energy Regulatory Commission (FERC)Orders 841 and 2222 have recommended that distributed energy resources (DERs) should participate in energy and reserve markets; therefore, a mechanism needs to be developed to facilitate DERs’ participation at the distribution level. Although the available reserve from a single distribution system may not be sufficient for tertiary frequency regulation, stacked and coordinated contributions from several distribution systems can enable them participate in tertiary frequency regulation at scale. This paper proposes a deep reinforcement learning (DRL)-based approach for optimization of requested aggregated reserves by system operators among the clusters of DERs. The co-optimization of cost of reserve, distribution network loss, and voltage regulation of the feeders are considered while optimizing the reserves among participating DERs. The proposed framework adopts deep deterministic policy gradient (DDPG), which is an algorithm based on an actor-critic method. The effectiveness of the proposed method for allocating reserves among DERs is demonstrated through case studies on a modified IEEE 34-node distribution system.

deep reinforcement learning, distributed energy re↗

Joint scheduling of energy, fast and primary frequency response reserves in integrated transmission–distribution networks

Inverter-based distributed energy resources (DERs) connected to distribution networks (DNs) can provide fast frequency support, but their reserve deliverability depends on feeder constraints and differs from synchronous primary frequency response (PFR). Existing transmission–distribution coordination studies usually treat reserve generically or neglect feeder-level feasibility, while frequency-security scheduling studies rarely represent distribution feeders explicitly. This paper develops a bi-level day-ahead scheduling framework for integrated transmission–distribution networks that jointly clears energy, transmission-side PFR, and distribution-side fast frequency response (FFR) under exogenous hourly inertia and largest-loss inputs from an external unit commitment (UC) schedule. The transmission problem is modeled with DC-optimal power flow (OPF) and closed-form second-order cone (SOC) frequency-security constraints, whereas each DN is represented by a reserve-aware branch-flow AC-OPF so that scheduled fast reserves remain deliverable during activation. The bi-level problem is reformulated through Karush–Kuhn–Tucker (KKT) conditions into a mixed-integer SOC program, and a penalty term is used to tighten the distribution-network relaxation. In the reduced test system, lower exogenous inertia increased the required primary response from 179.64 MW to 191.08 MW, distribution-side fast response reduced total frequency-response procurement by up to 4.9%, and neglecting distribution constraints overstated the combined distribution-side energy and reserve award by up to 18%. In the expanded study, the largest case was solved in 2.02 s with a 0.00% optimality gap. Time-domain simulations kept the frequency nadir above 59.0 Hz in all tested hours. These results demonstrate the value of fast-response modeling and distribution-feasible reserve delivery in coordinated market clearing.

Noh, Seung-Gil↗

Regional Real-Time PV Spinning Reserve Estimator

Curtailed photovoltaic (PV) generation is a zero-marginal-cost spinning reserve that can be used for a number of active power control services. Unlike traditional spinning reserve providers, however, i.e., fossil-fueled generators, which have well-defined operating characteristics, e.g., available headroom or potential high limit (PHL), PV plants have by nature variable and uncertain operating characteristics. To ensure the effective coordination between PV plants and the system operator during an active power control event, accurate knowledge of the PV PHL is essential. It ensures that enough headroom is reserved by the PV plants to deliver the award services in real time and informs feasible dispatch decisions made by the market operator. To tackle this challenge, a novel reference-control grouping-based PV plant reserve estimation method has been proposed by the National Renewable Energy Laboratory under past projects funded by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office. The estimation method separates inverters within a plant into two groups: a control group and a reference group. While the reference group is reserved to operate at its PHL, the control group can be curtailed to provide the grid services. Real-time outputs from the reference inverters are used to estimate the PHL for the whole plant based on the ratio between capacities of the reference group and of the plant. This work further enhances the methodology by (1) improving the model accuracy through machine learning; (2) automating the reference inverter selection through correlation analysis; (3) considering estimation look-ahead windows; and (4) applying to regional spinning reserve estimation. Significant performance improvement has been observed based on real-world data collected by CAISO, Southern Company, and Terabase Energy. Compared with the original scaling method, the newly proposed machine learning-based approach reduces the estimation errors by 30% and 13% at the plant level and region level, respectively. Results obtained from this project are intended to be used by grid operators, market operators, balancing authorities, and PV plant owners and operators to facilitate PV participation in ancillary service markets. Regulators, policymakers, and system planners can also consider the results of this work in their decision-making processes. In addition to the performance improvement on the existing reference-control based grouping method, we also investigated how the variability of PV generation from a single PV inverter can be used to represent the variability of PV generation at the plant level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deploying E3’s RESERVE Tool to Enable Advanced Operation of Clean Grids

Energy and Environmental Economics, Inc. (E3) developed an open-source machine learning model, RESERVE, for deriving ancillary services timeseries in deeply decarbonized electricity grids. E3 used a bespoke PLEXOS production simulation model of the California Independent System Operator’s (CAISO) balancing area to validate RESERVE’s ability to enable production cost, greenhouse gas emissions (GHG), and renewable energy curtailment savings. These savings were modeled by comparing PLEXOS cases with RESERVE’s outputs to PLEXOS cases with CAISO’s incumbent reserve product in the Western Energy Imbalance Market (EIM)’s 15-minute market. E3 also tested cases with solar operating flexibly to provide reserves. E3 found that, in a 2030 modeling year, using RESERVE and flexible solar enabled significant production cost, GHG and curtailment savings versus the incumbent CAISO method in cases with low penetrations of lithium-ion batteries. However, with the full 14 gigawatts (about 30% of peak CAISO demand) of 4-hour lithium-ion batteries that are expected to be installed by 2030, these savings approach zero due to batteries saturating ancillary services markets. E3 also found significant savings under a 2019 benchmarking year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Secured Reserve Scheduling of Pumped-Storage Hydropower Plants in ISO Day-ahead Market

Due to the fast response ability and high ramping rates, pumped-storage hydropower (PSH) plants are playing an increasingly critical role in mitigating power generation fluctuations induced by the growing proliferation of renewable energy resources. However, because they are energy-limited resources, actual reserve deployment from PSHs would cause the deviation of state-of-charge (SOC) from the scheduled value, which, once accumulated over time, could induce potential violations on SOC limits and cause non-dispatchability of PSHs. In recognizing this potential issue, it can become important to securing the reserve schedule of PSHs and other energy limited resources preventively in the day-ahead market clearing. To ensure reserve dispatchability of PSHs despite SOC deviations, this paper proposes the reserve secure constraints, which are cast as a distributionally robust chance-constrained formulation by judiciously introducing random parameters to describe deployment ratios of scheduled regulation reserve from PSHs. Furthermore, these constraints are converted into tractable second-order cone constraints, and further approximated as linear constraints to be compatible with the current ISO day-ahead market clearing model. A modified IEEE 118-bus system with multiple PSHs is adopted to verify the proposed approach.

13 HYDRO ENERGY↗

Local carbon reserves are insufficient for phloem terpene induction during drought in Pinus edulis in response to bark beetle–associated fungi

Stomatal closure during drought inhibits carbon uptake and may reduce a tree's defensive capacity. Limited carbon availability during drought may increase a tree's mortality risk, particularly if drought constrains trees' capacity to rapidly produce defenses during biotic attack. We parameterized a new model of conifer defense using physiological data on carbon reserves and chemical defenses before and after a simulated bark beetle attack in mature Pinus edulis under experimental drought. Attack was simulated using inoculations with a consistent bluestain fungus (Ophiostoma sp.) of Ips confusus, the main bark beetle colonizing this tree, to induce a defensive response. Trees with more carbon reserves produced more defenses but measured phloem carbon reserves only accounted for c. 23% of the induced defensive response. Our model predicted universal mortality if local reserves alone supported defense production, suggesting substantial remobilization and transport of stored resin or carbon reserves to the inoculation site. Our results show that de novo terpene synthesis represents only a fraction of the total measured phloem terpenes in P. edulis following fungal inoculation. Without direct attribution of phloem terpene concentrations to available carbon, many studies may be overestimating the scale and importance of de novo terpene synthesis in a tree's induced defense response.

59 BASIC BIOLOGICAL SCIENCES↗

Using Energy Storage-Based Grid Forming Inverters for Operational Reserve in Hybrid Diesel Microgrids

In remote arctic communities, where access to a bulk electrical grid interconnection is not available, the implementation of islanded microgrids has been the most viable way to produce and distribute electricity services to their inhabitants. Historically, these islanded grids have relied primarily on diesel generators or hydropower resources to supply the baseload. However, this practice can result in increased expense due to the high costs associated with fuel transportation and the significant amounts of on-site storage necessary when fuel transportation is unavailable during winter months. In order to mitigate this problem, arctic microgrids have started to transition to a hybrid-source operational mode by incorporating renewable energy sources that are inherently variable in nature, such as wind or solar. Due to their highly stochastic behavior, these hybrid-source islanded microgrids can pose potential issues related to power quality due to introduction of rapid net load fluctuations and inability of diesel generators to respond rapidly. In addition, non-firm stochastic sources can require significant idling diesel generator resources to serve as spinning reserves, which is inefficient and wasteful. This work studies the problems that may arise in the transient dynamics of a real-world hybrid diesel microgrid when subjected to a loss of wind generation. Moreover, this work proposes a transition from a diesel spinning reserve to a battery energy-storage system (BESS) operating reserve scheme. The study of the proposed transition is important in establishing the fundamental implication of transient dynamics and the potential benefits of integrating a BESS as a spinning reserve in terms of stability, frequency nadir, and transient voltage deviation. The methods to investigate and validate the transient dynamics relied on both electromagnetic simulation models of GFMIs and a commercially available GFMI in an experimental power hardware-in-the-loop setup. The simulation results showed that the proposed operating reserve scheme improves the power quality of the system in terms of voltage deviation and frequency nadir when the microgrid is subjected to a loss of wind generation scenario. Depending on the simulation cases, adding a GFMI reduced the frequency nadir between 65.3% and 86.7%. Moreover, the reductions in the voltage deviations improved between 3.6% and 23.0%. From these results it can be concluded that the integration of a GFMI can reduce the frequency nadir in a hybrid diesel microgrid, and in turn, reduce diesel consumption, which improves system reliability while reducing fuel expenses. Furthermore, the novelty of this work relies on the fact that the offline simulation results were validated using a power hardware-in-the-loop platform that incorporated a 100 kVA commercially available GFMI as the device under test.

Hernandez-Alvidrez, Javier↗

A Data-Driven Method for Adaptive Reserve Requirement Estimation via Probabilistic Net Load Forecasting

The University of Colorado Boulder Boulder, CO, 80309, USA With the increasing penetration of renewable energy, power systems are subject to more uncertainty. This makes power system reserve scheduling more challenging. Most of the current reserve requirement determination methods calculate reserve requirements based on historical data, which does not consider the real-time or future system uncertainty. In this paper, a data-driven method is developed to determine the non-spinning reserve requirement (NSRR) in the Electric Reliability Council of Texas (ERCOT) system. The method follows the procedure of the current ERCOT method while adaptively determining the NSRR based on probabilistic net load forecasts. Case studies with two years of ERCOT data show that the developed method significantly reduces the NSRR by introducing an adaptive temporal resolution and update rate. Sensitivity analysis with different forecasting and percentile thresholds indicates the flexibility of the developed method.

non-spinning reserve↗

Market Implications of Alternative Operating Reserve Modeling in Wholesale Electricity Markets

Pricing and settlement mechanisms are crucial for efficient resource allocation, investment incentives, market competition, and regulatory oversight. In the United States, Regional Transmission Operators (RTOs) adopts a uniform pricing scheme that hinges on the marginal costs of supplying additional electricity. This study investigates the pricing and settlement impacts of alternative reserve constraint modeling, highlighting how even slight variations in the modeling of constraints can drastically alter market clearing prices, reserve quantities, and revenue outcomes. Focusing on the diverse market designs and assumptions in ancillary services by U.S. RTOs, particularly in relation to capacity sharing and reserve substitutions, the research examines four distinct models that combine these elements based on a large-scale synthetic power system test data. Our study provides a critical insight into the economic implications and the underlying factors of these alternative reserve constraints through market simulations and data analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗