Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Developing a remediation framework

When harmful contaminants are detected in soil, sediment, or groundwater (or suspected due to industrial activities), remediation efforts may be required to protect human health and the environment. This chapter will introduce and discuss the steps in the general site remediation process that are key when approaching any remediation strategy, regardless of the site complexity. While these steps are described in a linear fashion, in most cases, the approach is more fluid and iterative depending on the desired outcomes and success of each progressive clean-up effort along the way. This chapter will additionally articulate some key considerations which may be important to the overall remediation strategy depending on the particular needs and desired outcomes. From these more general discussions, the chapter will branch into a case-study of the remediation approach, or process steps, previously/currently/in the future taking place at the Hanford Site, as one example of a complex waste sites in the United States. As indicated earlier, while a remediation strategy can be more simply described by a progression of general process steps, it is far more likely to observe fluidity and strategy evolution over time from the first conceived strategy as remediation progress occurs. The chapter concludes with a brief discussion of how the strategy at the Hanford Site has evolved to provide a singular example of what this evolution might look like for other complex waste sites.

Muller, Katherine A.↗

Mercury Remediation Technology Development for Lower East Fork Poplar Creek (FY2020 Update)

Mercury (Hg) remediation is a high priority for the US Department of Energy (DOE) Oak Ridge Office of Environmental Management. Mercury contamination in the environment can be found at all three DOE facilities in Oak Ridge, but probably the greatest environmental risk concern relative to Hg on the Oak Ridge Reservation is associated with historical Hg losses at and near the Y-12 National Security Complex (Y-12). Water and fish from East Fork Poplar Creek (EFPC) downstream of Y-12 exceed regulatory thresholds. Because of the complexities of Hg transport and fate in the aquatic environment, conventional remedial options for EFPC are highly uncertain. DOE is using a phased adaptive management approach to Hg remediation at Y-12 with a focus in the next few years on construction of the Mercury Treatment Facility (MTF) to treat the most contaminated Y-12 outfall entering EFPC (DOE 2017a; DOE 2017b). Once operational, the MTF will provide additional protection against inadvertent releases of Hg into the stream from decontamination and decommissioning of Y-12 Hg-use buildings. Although the MTF is anticipated to substantially decrease Hg water concentrations and flux in the upper part of EFPC, research and technology development are needed to develop appropriate and long-term remedial solutions for the downstream environment. Since late 2014, the Oak Ridge Office of Environmental Management and URS | CH2M Oak Ridge LLC/Restoration Services, Inc. have supported DOE’s Oak Ridge National Laboratory (ORNL) Environmental Sciences Division staff in conducting field and laboratory studies to develop Hg remedial technology solutions for lower EFPC (LEFPC). A technology development strategy for LEFPC was developed in 2014 that was consistent with the adaptive management paradigm and DOE’s technology readiness level (TRL) guidelines (Peterson et al. 2015). Initially, a thorough review of the literature was conducted and site-specific information was collected to develop a broad number of potential technologies that might be applied in LEFPC. An adaptive management approach was then used to focus on technologies that might have the most promise and potential remediation benefit. Field and laboratory studies conducted from 2014 to 2020 have identified the major drivers of Hg flux and bioaccumulation in EFPC and narrowed the list of high-merit technologies that might be of use in remediating the downstream environment.

54 ENVIRONMENTAL SCIENCES↗

Part IV: Remedial Action

This part of the book focuses on the remedial action where the remedy is selected and approved with associated regulatory documentation, detailed designs are prepared, and construction and/or implementation of the remedy is completed. The application may include remediation of environmental media (e.g., subsurface sediments or surface water sources), waste processing, and/or deactivation and decommissioning of historical facilities. Once a preferred remedy is implemented, the final steps include long-term stewardship and site closure (discussed in Part V). Refer to Section 3.2 of Chapter 1, Remediation Strategy for Complex Waste Sites, for context on how these steps fit into the broader remediation process.

Johnson, Christian D.↗

Predicting future well performance for environmental remediation design using deep learning

Here in this study, we developed a deep learning (DL) framework with a multi-channel three-dimensional convolutional neural network (MC3D-CNN) to predict well performance and thereby assist future environmental remediation design. Such prediction of extraction well performance at designated locations is critical for configuring pump-and-treat (P&T) well network design and operation, setting reasonable target closure dates for overall remedying, and estimating remedy costs. The framework is developed with operational and monitoring data routinely collected during P&T remedy operations, including well extraction and injection rates as well as in situ contaminant concentrations. Traditionally, the collected data were rarely used for purposes other than assessing past well performance and the accuracy of the conceptual site model. However, recent advances in data-driven computational approaches enable better use of the large datasets to inform future well performance, enhance site characterization, and improve remediation planning. In this study, we established a DL framework to integrate transient three-dimensional contaminant plumes and multiple aquifer properties (e.g., hydraulic conductivity and hydrostratigraphic maps) to identify characteristic patterns controlling and representing extraction well mass recovery, aiming at providing future mass recovery estimates for existing wells and candidate wells at any proposed locations. We evaluated our framework by using a realistic synthetic dataset generated from a well-calibrated flow and transport model used in the 200 West Area of the U.S. Department of Energy’s Hanford Site in southeastern Washington state. The multi-channel feature in our framework allows integration of various types and temporal densities of training datasets for DL model development. Overall, we found that the trained DL model achieved an accuracy of over 90% in ranking extraction well performance in validation datasets, and over 80% in predicting high-performance-ranking well locations. This data-informed approach provides a flexible tool to support adaptive site management, streamline decision-making, and potentially reduce remediation time and costs. Our DL framework can be used as a filtering tool to improve the current P&T network optimization design by reducing the number of candidate well locations.

54 ENVIRONMENTAL SCIENCES↗

Site Remediation Technology InfoBase: A Guide to Federal Programs, Information Resources, and Publications on Contaminated Site Cleanup Technologies. First Edition

Table of Contents: Federal Cleanup Programs; Federal Site Remediation Technology Development Assistance Programs; Federal Site Remediation Technology Development Electronic Data Bases; Federal Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Selected Bibliography: Federal Publication on Alternative and Innovative Site Remediation; and Appendix: Technology Program Contacts.

INFORMATION RESOURCES↗

Overview of the Long-Term Stewardship of the Remediated Uranium Mining and Milling Sites in Europe - 20079

Uranium mining in Europe began in the ' 40's for civil and military applications. The great majority of the uranium mines have now been closed and are going through the stages of decommissioning and/or rehabilitation. Today, the main uranium producers are outside the EU; only a few mines are still in operation inside the EU. In 2006, the situation of the uranium mines and mill tailings in Europe, identifying the tailings liabilities, their status, the plans for these sites and any associated hazards, was reported to the EC. The legacy of uranium mines and mill tailing disposals in the EU are located mainly in 12 Member States where, in total, 87 tailing objects were identified at 63 sites. The volume of each one of these tailings disposal varies from a few thousand to several tens of million m{sup 3}. The majority of these sites are no longer in operation. More than 40 tailing embankments have already been completely remediated. Approximately 20 are currently being remediated while for the remaining objects, remediation has yet to start. After ten years, and for a few cases where the respective projects have not yet been completed, it seems that most of Europe's uranium mines and milling legacies were remediated according to acceptable environmental standards. Nevertheless, Europe is about to face a new challenge that comes from the concluded remediation projects for which an effective set of measures for coordinated institutional control, known as 'long-term stewardship', is needed including, in most cases, continuous and active maintenance. Moreover, the uncertainty of what will happen to these sites if institutional control fails at some point in time is a major concern. This work presents a summary of the situation and current issues of the uranium mine and mill tailings in Europe and their remediation status. It addresses not only the management of existing uranium mine and mill legacies but also the methods and strategies that have been used to prevent the creation of new future legacy sites from uranium mines still in operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: Theme 2 - Site Decommissioning, Deconstruction and Remediation - 20329

This paper will discuss the aims, objectives and progress to-date under Theme 2 of the TRANSCEND consortium project: Site decommissioning, deconstruction and remediation. Decommissioning nuclear sites involves waste retrieval, decontamination, deconstruction and, where necessary, containment and/or remediation of the remaining structure and surrounding land. Critical to management of these processes is limiting radiation exposure for the workforce, restricting the spread of radionuclides in groundwater, surface water and airborne particulates, and minimising the volume of contaminated waste for disposal. The aim of Theme 2 research is to develop new technologies for monitoring, remediation and containment that serve to minimise the volume of radioactively contaminated waste for disposal, for application prior to, during and after retrieval, deconstruction and decontamination operations. Prior research, conducted under the previous DISTINCTIVE project, demonstrated that colloidal silica grout can penetrate low permeability materials (including cement) for hydraulic barrier formation, and improved sorption capacity. The silica grout can be injected at surface using extremely small (potentially gravity-driven) fluid pressures, without the need for borehole drilling. Current work is investigating the erodibility of silica-grouted soils for inhibition of airborne and water-borne particulates as well as enhancing the grout's sorption capacity by addition of other materials to provide a chemical, as well as hydraulic, barrier to subsurface migration. EK remediation uses low voltage DC current to control migration of contaminants in porous media as well as to remove or degrade them. Researchers in the consortium have already demonstrated that low-energy ex-situ EK techniques can be used to provide remediation and volume minimisation for AWE legacy wastes in the UK. Under the current project researchers are building EK test cells containing simulated site materials at laboratory and intermediate(m)-scales to: remove, focus or degrade contaminants (remediation or waste minimisation); and direct subsurface water, chemical and colloid flow (fencing/containment or forced migration). This lab-based research is being informed by numerical models of EK processes that can subsequently be used to design full-scale on-site applications by nuclear site holders. Research under theme 2 of TRANSCEND will ultimately combine novel non-invasive detection technologies with EK techniques and colloidal silica grout barriers, to optimise the containment of radionuclide contamination in soils. Thus, allowing us to detect in-situ contamination, mobilise it to a selected location and grout it in-situ, prior to the initiation of decommissioning and deconstruction operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reducing Cost of Chlorinated Volatile Organic Compound Remediation by Transitioning from Active to Passive Soil Vapor Extraction - 20157

Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Remediation Technology Development for Lower East Fork Poplar Creek—FY 2021 Update

Mercury remediation is a high priority for the US Department of Energy (DOE) Oak Ridge Office of Environmental Management. Mercury contamination in the environment can be found at all three DOE facilities in Oak Ridge, Tennessee, but the greatest environmental risk concern relative to Hg on the Oak Ridge Reservation is likely associated with historical Hg losses at and near the Y-12 National Security Complex (Y-12). Mercury in water and fish from East Fork Poplar Creek (EFPC) downstream of Y-12 exceeds regulatory thresholds. Because of the complexities of Hg transport and fate in the aquatic environment, conventional remedial options for EFPC are highly uncertain. DOE is using a phased adaptive management approach to Hg remediation at Y-12, with a focus in the next few years on construction of the Mercury Treatment Facility (MTF) to treat the most contaminated Y-12 outfall entering EFPC (DOE 2017a; DOE 2017b). Once operational, the MTF will provide additional protection against inadvertent releases of Hg into the stream from decontamination and decommissioning of Y-12 Hg-use buildings. Although the MTF is anticipated to substantially decrease Hg water concentrations and flux in upper EFPC (UEFPC), research and technology development are needed to develop appropriate and longer-term remedial solutions for the downstream environment. Since late 2014, the Oak Ridge Office of Environmental Management and URS | CH2M Oak Ridge LLC/Restoration Services Inc. have supported DOE’s Oak Ridge National Laboratory (ORNL) Environmental Sciences Division staff in conducting field and laboratory studies to develop Hg remedial technology solutions for lower EFPC (LEFPC). Whereas previous annual reporting updates for Hg remediation technology development for LEFPC have focused on presenting detailed results from the previous fiscal year, this FY 2021 update takes a comprehensive, higher-level approach to the research and technology development activities conducted since 2014. The report is organized to be consistent with the three tasks defined in the LEFPC strategic plan

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potassium jarosite seeding of soils decreases lead and arsenic bioaccessibility: A path toward concomitant remediation

Soils are common sources of metal(loid) contaminant exposure globally. Lead (Pb) and arsenic (As) are of paramount concern due to detrimental neurological and carcinogenic health effects, respectively. Pb and/or As contaminated soils require remediation, typically leading to excavation, a costly and environmentally damaging practice of removing soil to a central location (e.g., hazardous landfill) that may not be a viable option in low-income countries. Chemical remediation techniques may allow for in situ conversion of soil contaminants to phases that are not easily mobilized upon ingestion; however, effective chemical remediation options are limited. Here, we have successfully tested a soil remediation technology using potted soils that relies on converting soil Pb and As into jarosite-group minerals, such as plumbojarosite (PLJ) and beudantite, possessing exceptionally low bioaccessibility [i.e., solubility at gastric pH conditions (pH 1.5 to 3)]. Across all experiments conducted, all new treatment methods successfully promoted PLJ and/or beudantite conversion, resulting in a proportional decrease in Pb and As bioaccessibility. Increasing temperature resulted in increased conversion to jarosite-group minerals, but addition of potassium (K) jarosite was most critical to Pb and As bioaccessibility decreases. Our methods of K-jarosite treatment yielded <10% Pb and As bioaccessibility compared to unamended soil values of approximately 70% and 60%, respectively. In conclusion, the proposed treatment is a rare dual remediation option that effectively treats soil Pb and As such that potential exposure is considerably reduced. Research presented here lays the foundation for ongoing field application.

54 ENVIRONMENTAL SCIENCES↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrothermal mineralization of per- and polyfluoroalkyl substances for soil remediation

Abstract Per- and polyfluoroalkyl substances (PFAS) are persistent and bioaccumulative pollutants that can easily accumulate in soil, posing a threat to environment and human health. Current PFAS degradation processes often suffer from low efficiency, high energy and water consumption, or lack of generality. Here, we develop a rapid electrothermal mineralization (REM) process to remediate PFAS-contaminated soil. With environmentally compatible biochar as the conductive additive, the soil temperature increases to >1000 °C within seconds by current pulse input, converting PFAS to calcium fluoride with inherent calcium compounds in soil. This process is applicable for remediating various PFAS contaminants in soil, with high removal efficiencies ( >99%) and mineralization ratios ( >90%). While retaining soil particle size, composition, water infiltration rate, and cation exchange capacity, REM facilitates an increase of exchangeable nutrient supply and arthropod survival in soil, rendering it superior to the time-consuming calcination approach that severely degrades soil properties. REM is scaled up to remediate soil at two kilograms per batch and promising for large-scale, on-site soil remediation. Life-cycle assessment and techno-economic analysis demonstrate REM as an environmentally friendly and economic process, with a significant reduction of energy consumption, greenhouse gas emission, water consumption, and operation cost, when compared to existing soil remediation practices.

Science & Technology - Other Topics↗

Optimum concentration of fly ash nanoparticles to stabilize CO 2 foams for aquifer and soil remediation

Contamination caused by non-aqueous phase liquids (NAPLs) in aquifers and soil is an important challenge that requires effective remediation techniques. One potential approach is through the use of CO 2 foams to displace NAPLs from permeable media. CO 2 foams generated only by surfactants are not stable enough for the efficient removal of NAPLs contamination. This shortcoming may be alleviated via the use of nanoparticles (NPs)-surfactant mixtures as a stabilizing agent. This work focuses on the evaluation of the optimum concentration of fly ash nanoparticles for stabilizing CO 2 foam with the combined action of the surfactant. The performance of this foam is evaluated in remediating a contaminated 41 mm × 36 mm surrogate permeable medium in a microfluidic device. Mixtures of fly ash, a by-product of coal-burning power plants, and alpha-olefin sulfonate (AOS) and lauramidopropyl betaine (LAPB) surfactants are used to generate stable foams. The results show that a 1000 mg/L AOS-LAPB surfactant solution along with 1000 mg/L of fly ash NPs produces the best performance. Formation of deposits in the matrix is observed. These deposits, which are more prominent at higher NP concentrations, appear to adversely affect displacement, displacement efficiency and remediation of the medium. This study demonstrates that using fly ash nanoparticles and optimizing their concentration can effectively stabilize CO 2 foams and improve the displacement efficiency for aquifer and soil remediation.

54 ENVIRONMENTAL SCIENCES↗

Post-remediation geophysical assessment: Investigating long-term electrical geophysical signatures resulting from bioremediation at a chlorinated solvent contaminated site

There is a growing need to assess long-term impacts of active remediation strategies on treated aquifers. A variety of biogeochemical alterations can result from interactions of the amendment with the aquifer, conceivably leading to a geophysical footprint of the long-term alteration of an aquifer. This concept of post-remediation geophysical assessment was investigated in a shallow, chlorinated solvent-contaminated aquifer six to eight years after amendment delivery. Surface resistivity imaging and cross-borehole resistivity and induced polarization (IP) imaging were performed on a transect that spanned treated and untreated zones of the aquifer. Established relationships between IP parameters and surface electrical conductivity were used to predict vertical profiles of electrolytic conductivity and surface conductivity from the inverted cross-borehole images. Aqueous geochemistry data, along with natural gamma and magnetic susceptibility logs, were used to constrain the interpretation. The electrical conductivity structure determined from surface and borehole imaging was foremost controlled by the electrolytic conductivity of the interconnected pore space, being linearly related to fluid specific conductance. The electrolytic conductivity (and thus the conductivity images alone) did not discriminate between treated and untreated zones of the aquifer. In contrast, inverted phase angles and surface conductivities did discriminate between treated and untreated zones of the aquifer, with the treated zone being up to an order of magnitude more polarizable in places. Supporting aqueous chemistry and borehole logging datasets indicate that this geophysical footprint of the long-term impact of the remediation on the aquifer is most likely associated with the formation of polarizable, dispersed iron sulfide minerals. The study opens the door to the possibility of employing time-lapse electrical geophysical measurements to assist with long-term environmental stewardship of legacy sites undergoing active remediation.

bioremediation↗

Panel Session 116: Waste Management from Remediation of Legacy Sites or Unplanned Releases

Past experiences have shown that there is often a disconnect between Indigenous societies and Western society. This disconnect can be attributed to different value systems between these two group and is not limited to the USA and Canada but also extends into Australia, New Zealand, and the Central Asia Republics (the 'five Stans'). The intent of this Panel Session to give voice to representatives from Indigenous communities, the challenges presented in remediation processes, and potential solutions. Standard risk assessment assumptions developed for Western societies often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. This panel focused on the perspectives of Indigenous societies (e.g., Indian Tribes (US), First Nations (Canada)) related to risk assessment of environmental remediation challenges, including deep geological disposal of HLW and ILW, near-surface disposal of LLW and in-situ entombment of nuclear reactor components, and environmental remediation of abandoned uranium mines and historic wastes. Standard risk assessment assumptions often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. Factoring those into a risk assessment that still meets regulatory requirements and policies such as reasonably anticipated land use at US EPA CERCLA sites can be challenging but has the potential to lead to a site or facility approach that is more accepted. Panelists with presentations: The U.S. Nuclear Regulatory Commission Regulatory Process - A Path for Indigenous Knowledge? (Francis Cameron); Local Community Perceptions and Remediation Projects (Michelle Roberts); Indigenous Perspectives on Risk Assessment (Bob Watts); Navajo Superfund Program: Fundamental Law and Traditional Ecological Knowledge (Dariel Yazzie); Risk Assessment: Two Indigenous Approaches (Whitney Fraser)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗