Spallation Neutron Source Proton Power Upgrade (PPU) Project: Lessons Learned for CD-4
The SNS PPU project goals were to design, build, install and test the equipment necessary to double the accelerator power from 1.4 MW to 2.8 MW and to deliver a 2.0 MW qualified target. PPU also included the provision of a stub-out in the SNS accumulator-ring-to-target tunnel to facilitate a rapid connection to a new proton beamline for the Second Target Station (STS) project. The power capability was doubled by increasing the proton beam energy by 33% and the peak beam current by 50%, relative to pre-PPU accelerator performance. The project also included modifications to some buildings and services. The PPU project accomplished the energy upgrade by fabricating and installing new superconducting radiofrequency (RF) cryomodules, with supporting RF equipment, in the existing linac tunnel and klystron gallery, respectively. The High Voltage Converter Modulators (HVCM) and klystrons for some of the existing installed RF equipment were upgraded to handle the higher beam current. The increased beam power of 2 MW on the First Target Station (FTS) was enabled by the addition of a new high-volume gas injection system for pressure pulse and cavitation mitigation in the mercury target and a redesigned mercury target vessel.