Engineering PapersSearch

SEARCH · Engineering Papers

Results for “pumped hydro”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

PSH Assessment and Site Identification [Slides]

NLR's Pumped Storage Hydropower (PSH) geospatial and cost model algorithms are applied to the Chemehuevi Reservation to assess the potential for PSH within the reservation. The algorithm identifies both "open-loop" PSH opportunities formed by constructing a new reservoir within the reservation paired with bordering Lake Havasu and "closed-loop" systems formed by two new reservoirs within the reservation. Options range from 28 to 538 MW of electrical generation power at maximum generation and 10 hours of storage. CAPEX is estimates as 4422 2022 $\$$/kW of generating power, which is meaningfully higher than the lowest cost systems identified in NLR's national scale assessments. Further economic analysis is needed to fully evaluate whether this would be an attractive option to meet the Chemehuevi Reservation's goals.

25 ENERGY STORAGE

From Concept to Capital: How Developers Secure Private Investment

With an increased need for funding diversity in hydropower, private capital is becoming more important than ever. Investors are actively seeking opportunities, but what makes a project attractive for investment, and how can companies secure private equity or venture capital backing? This session brings together experts to discuss what capital providers look for in providing financing for hydropower projects. Panelists will explore key barriers - such as the lack of diversified portfolios and long-term revenue certainty - and strategies to overcome them through innovative financing mechanisms, partnerships, and market-driven solutions.

16 TIDAL AND WAVE POWER

Pumped Storage Hydropower Potential and Opportunities

Pumped storage hydropower (PSH) is a flexible energy storage technology with the potential to improve grid reliability, resiliency, and stability in the electric grid of the future. NREL has developed a range of data and tools to help understand opportunities for new PSH deployment, including nationwide resource assessment data, a bottom-up component-level cost model, and a lifecycle greenhouse gas emissions calculator. These datasets can then be used to inform grid planning models, analysis, and decision making to understand the role PSH can play in the power sector.

cost

Challenges and Opportunities for Electric Utility Modeling and Asset Valuation Frameworks: Case Study on Valuing New Pumped Storage Hydropower

Asset valuation by electric utilities is becoming increasingly difficult in the rapidly changing electric sector. Rapid deployment of variable generation and inverter-based storage systems along with uncertain demand growth, climate, policies, and other factors create a challenging environment for understanding the value proposition of a new potential asset. This report describes an effort between the Tennessee Valley Authority (TVA) and three U.S. Department of Energy laboratories to perform a detailed review of utility modeling and analysis practices for asset valuation and identify challenges and opportunities for advancing its methods into the future. It focuses on a case study of new potential pumped storage hydropower (PSH) because of growing interest in new PSH capacity to provide energy balancing, firm capacity, and a range of ancillary services. Staff from the DOE labs conducted systematic interviews about current practices in capacity expansion modeling, production-cost modeling, hydrological modeling, and transmission stability modeling while also discussing how scenario analysis is conducted and how models and data are integrated. The effort resulted in a set of model, integration, and scenario recommendations that could be valuable to TVA, other utilities, system operators, and other stakeholders conducting integrated grid analysis. Individual model recommendations suggest exploring computational tradeoffs with detail and resolution across spatiotemporal structure, supply- and demand-side details, transmission overlays, market interactions, and ancillary services. Automated processes to pass data between models and conduct larger scenario suites could also enhance valuation practices by enabling a more consistent study of asset value across a broader range of uncertain future grid conditions where PSH could be particularly valuable. TVA and other industry stakeholders can learn from and adapt applied research-grade methods developed by DOE laboratories and other research institutions to improve decision making and accelerate progress towards a reliable, economic, sustainable energy system.

13 HYDRO ENERGY

Hydropower Supply Chain Gap Analysis

In 2022, DOE conducted supply chain "deep dives" for renewable energy technologies, including hydropower (Uria-Martinez, Hydropower Industry Supply Chain Deep Dive Assessment 2022). The deep dive identified several challenges in the current hydropower supply chain. In addition, Nguyen et. al (2022) conducted an analogous deep-dive assessment on large (> 100-MW) power transformers (LPTs), a critical component of hydropower installations, and concluded that the LPTs as well as several upstream components and materials also have domestic supply chain challenges. These deep dives were the initial high-level assessments of these supply chains and were focused on identifying the biggest issues. Both recommended further investigation. In the two years since the deep dives were published, the Water Power Technologies Office (WPTO) has focused on improving our understanding of the hydropower supply chain and developing strategies for addressing these challenges. Because the challenges outlined above are most acute for large hydropower systems, most of the report and specifically, this report concentrates on the larger > 100-MW hydropower systems. Early in 2023, DOE's Secretary of Energy asked the Water Power Technologies Office (WPTO) to engage the hydropower community and seek input on strategies to secure and encourage domestic manufacturing. WPTO has established three focus areas for engagement: 1) Define the market for planned rehabilitations and new construction of the domestic fleet, 2) Provide insights for policies, incentives, loan programs, and technology investments to encourage domestic content, and 3) Define the existing and required domestic hydropower manufacturing capabilities and workforce. This report summarizes these efforts and complements the earlier work by further exploring the identified challenges and identifying potential actions to address these challenges. Furthermore, we conducted a detailed gap analysis of the domestic hydropower supply chain, down to the component level. From this analysis, we then make specific, actionable recommendations for closing these gaps. Section 2 of the report summarizes recent (i.e., since 2021) legislation impacting hydropower deployment and/or its supply chain. It then describes the efforts of WPTO to assess and improve the hydropower supply chain since the publication of the deep-dive assessments. In Section 3, the report updates the earlier supply chain and market studies, identifying specific capabilities by company and location. Section 4 outlines the hydropower demand signal for both new builds due to clean energy goals as well as refurbishments and upgrading of the current domestic fleet. Section 5 is a detailed gap analysis while Section 6 provides actionable recommendations for closing the gaps. Section 7 concludes the report by linking the recommendations to the identified gaps and discusses future efforts.

13 HYDRO ENERGY

Trickle water and feeding system in plant culture and light-dark cycle effects on plant growth

Rockwool, as an inert medium covered or bagged with polyethylene film, can be effectively used for plant culture in space stations. The most important machine is the pump adjusting the dripping rate in the feeding system. Hydro-aeroponics may be adaptable to a space laboratory. The shortening of the light-dark cycles inhibits plant growth and induces an abnormal morphogenesis. A photoperiod of 12 hr dark may be needed for plant growth.

Takano, T.

Opportunities in Hydropower and Pumped Storage Hydropower

Hydropower and pumped storage hydropower (PSH) are established technologies with a long-standing presence in the United States, but the industry remains dynamic with an active relicensing pipeline and growing interest in PSH to provide large-scale energy storage and grid services. NLR has developed a range of tools, data, and analysis that supports the evaluation of hydropower and PSH opportunities, complementing other DOE-supported efforts in this space. This presentation initiates a conversation around the future of hydropower and PSH and how it can inform the National Academy of Sciences investigation of possible DOE-supported regional energy-water technology pilots.

13 HYDRO ENERGY

Grid Planning Impacts of Hydropower Growth and Decline

Hydropower and pumped storage hydropower (PSH) have a complex and uncertain future in the U.S. electricity system. On one hand, existing assets have the potential for an expanded role in integrating variable renewable energy while new deployment, particularly of PSH, can help meet growing needs for grid flexibility and improved reliability. On the other hand, challenging environmental and cost considerations could limit the extent of new investments in hydropower and PSH capacity and flexibility. This technical presentation demonstrates the use of a high-fidelity capacity expansion model of the U.S. electric grid (the National Renewable Energy Laboratory's Regional Energy Deployment System) to understand the impacts of alternative futures for the hydropower and PSH fleet, including scenarios of both growth and decline. Growth scenarios include new PSH deployment or improved hydropower flexibility, while scenarios of decline reduce the capacity or energy production potential of hydropower and PSH. Economic, environmental, and performance outcomes of the grid are compared across these scenarios to reveal the potential contributions of hydropower and PSH in the U.S. electric sector over the next several decades, focusing on changes to the grid technology mix, electric sector costs, electricity prices, and air emissions. This broad scenario approach demonstrates how flexible hydropower and PSH can help reduce air emissions and cost by complementing variable renewables, but the opposite can occur with reduced hydropower availability, particularly in the next decade. It is important to consider a wide range of scenarios and metrics to gain a national and regional understanding of hydropower's future in the United States.

capacity expansion

Large Power Transformer Supply Chain Gap Analysis and Domestic Content Strategies for Hydropower Rehabilitation: Supplemental Report

Large Power Transformers (LPTs) are indispensable to U.S. hydropower operations, serving as generator step-up (GSU) units that interconnect hydro facilities to the transmission grid. Yet the LPT supply chain faces mounting stress from aging infrastructure, limited domestic production, and long lead times. Currently, more than 80% of LPT demand is met through imports, with primary suppliers including Mexico, South Korea, Brazil, Austria, and Canada. Domestic manufacturers supply only about 20% of units, constrained by bottlenecks in high-grade Grain-Oriented Electrical Steel (GOES), copper conductors, bushings, and on-load tap changers (OLTCs). Hydropower rehabilitation projects in particular face additional challenges due to custom design requirements, remote siting, and regulatory needs around domestic content. Regional cost disparities, driven by transportation logistics, labor markets, and import price volatility, further exacerbate project risks. To address these vulnerabilities, coordinated action is required: strengthening domestic capacity for GOES and secondary components, developing near-site assembly hubs, and leveraging IRS domestic content safe harbors to incentivize U.S. manufacturing. This addendum refines the 2024 NREL Hydropower Supply Chain Gap Analysis by focusing specifically on critical issues related to LPT domestic manufacturing capacity and key considerations for hydropower developers and asset owners.

13 HYDRO ENERGY

Methods for Assessing Opportunities for Ring Dam Pumped Storage Hydropower

There is growing interest in new pumped storage hydropower (PSH) deployment to provide a range of grid flexibility, reliability, and resiliency services under an evolving and uncertain future power sector. The National Laboratory of the Rockies develops open PSH resource assessment and cost modeling tools to help evaluate PSH deployment opportunities, and this report describes expansions to those tools to consider an additional PSH system configuration - ring-dam reservoirs built on flat topographical features that are constructed from roller-compacted concrete material. This reservoir type is common among current PSH proposals and requires new methods to identify sites with this reservoir geometry throughout the United States and characterize the associated dam cost. Cost characterization for ring dam reservoirs required collecting historical dam cost data for earthen, rockfill, and roller-compacted concrete dams and regressing equations that relate costs between alternative materials. The ring dam site identification algorithm follows a 5-step procedure to identify circular geometry reservoirs. Once ring dam reservoirs are identified, they are then paired with potential dry-gully reservoirs, and the full set of potential paired reservoirs is cost-optimized to produce a least-cost set of potential PSH sites with no overlapping reservoirs. The resulting analysis found 1,663 ring-dam to dry-gully systems in the contiguous United States that are lower cost than any overlapping dry-gully to dry-gully systems, 29 in Alaska, and none in Hawaii or Puerto Rico. These systems constitute 1.5 TW of capacity in the contiguous United States and nearly 29 GW in Alaska, demonstrating that under suitable topography and head, ring-dam systems can provide cost-effective PSH opportunities. The greatest density of these opportunities are found in the intermountain west where there are mesas and flat land at bases of mountain ranges, but continued work could incorporate additional site characteristics or consider more complex reservoir shapes to find additional PSH deployment opportunities.

13 HYDRO ENERGY

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY

Pumped Storage Hydropower Resource and Deployment Potential

There is growing interest in deploying new pumped storage hydropower (PSH) to meet grid needs for flexibility, reliability, and resiliency. This presentation describes how NLR resource assessment, cost modeling, and capacity expansion modeling are used to identify technical and economic PSH deployment potential and support industry decision-making on PSH investments. NLR's open data and tools demonstrate the vast technical potential of PSH on the order of 80 TW, and modeling shows economic PSH deployment under an attractive cost-value proposition.

13 HYDRO ENERGY

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY

Technology for Water Treatment

There are approximately 500,000 water cooling towers in the United States, all of which must be kept clear of "scale" and corrosion and free of pollutants and bacteria. Electron Pure, Ltd. manufactures a hydro cooling tower conditioner as well as an automatic pool sanitizer. The pool sanitizer consists of two copper/silver electrodes placed in a chamber mounted in the pool's recirculation system. The tower conditioner combines the ionization system with a water conditioner, pump, centrifugal solids separator and timer. The system saves water, eliminates algae and operates maintenance and chemical free. The company has over 100 distributors in the U.S. as well as others in 20 foreign countries. The buildup of scale and corrosion is the most costly maintenance problem in cooling tower operation. Jet Propulsion Laboratory successfully developed a non-chemical system that not only curbed scale and corrosion, but also offered advantages in water conservation, cost savings and the elimination of toxic chemical discharge. In the system, ozone is produced by an on-site generator and introduced to the cooling tower water. Organic impurities are oxidized, and the dissolved ozone removes bacteria and scale. National Water Management, a NASA licensee, has installed its ozone advantage systems at some 200 cooling towers. Customers have saved money and eliminated chemical storage and discharge.

Source record

Assessment of Energy Technology Options for the Island of Molokai, Hawaii: Analysis of Floating Solar, Pumped Storage Hydropower, and Backup Energy Systems

This report documents analysis done by researchers at the National Laboratory of the Rockies and Pacific Northwest National Laboratory to evaluate the potential for and explore project concepts of electricity generation and storage additions on the island of Molokai, Hawaii, as identified in the Community Energy Resilience Action Plan (CERAP) by the Molokai Clean Energy Hui (MCEH), Sustainable Molokai, and the Hawaii Natural Energy Institute (HNEI). These electricity generation and storage additions include distributed photovoltaics (PV), battery energy storage, and generators for critical facilities on the island that can provide backup energy to the facilities during grid disruptions and outages, a floating PV (FPV) system on Kualapuu Reservoir, and pumped storage hydropower (PSH) systems scaled to act as a significant or primary source of energy storage on the Molokai grid.

13 HYDRO ENERGY