Progress Update: Reactor Disassembly Grouting
Grouting the P&R reactors in order to remove these basins as an environmental threat. This will end the Cold War legacy and end the environmental footprint.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Grouting the P&R reactors in order to remove these basins as an environmental threat. This will end the Cold War legacy and end the environmental footprint.
A profile of Glenn Kelly, an example of how the Recovery Act is positively impacting lives. The volunteer is now able to better support his family and is learning about environmental cleanup at the Savannah River Site.
Closure activity at the half-century old heavy water components reactor. Decommissioning is kicked off with the grouting of the basin to further protect the environment from radioactive waste.
The present report documents progress regarding segmentation of fast-neutron tomographic images of objects consisting of assemblies of machined parts with distinct boundaries. This report satisfies the fiscal year 2017 technical deliverable for project OR16-3DTomography-PD3Jb, “3D Tomography and Image Processing Using Fast Neutrons,” to report on the extension of geometric shape-finding algorithms to three dimensions. The project has two overall goals. The first of these goals is to extend associated particle fast neutron transmission and, particularly, induced-reaction tomographic imaging algorithms to three dimensions. The second of these goals is to automatically segment the resultant tomographic images into constituent parts, and then extract information about the parts, such as the class of shape and potentially the shape parameters. This report addresses continued progress in the component of the project concerned with image segmentation.
This report satisfies the fiscal year 2016 technical deliverable to report on progress in development of fast iterative reconstruction algorithms for project OR16-3DTomography-PD2Jb, "3D Tomography and Image Processing Using Fast Neutrons." This project has two overall goals. The first of these goals is to extend associated-particle fast neutron transmission and, particularly, induced-reaction tomographic imaging algorithms to three dimensions. The second of these goals is to automatically segment the resultant tomographic images into constituent parts, and then extract information about the parts, such as the class of shape and potentially shape parameters. This report addresses of the component of the project concerned with three-dimensional (3D) image reconstruction.
In June 2016, the Workplace Charging Challenge distributed its third annual survey to 295 partners with the goal of tracking partners' progress and identifying trends in workplace charging. This document summarizes findings from the survey and highlights accomplishments of the EV Everywhere Workplace Charging Challenge.
The Memorandum of Agreement (MOA), by which the efforts of the Wind Turbine Radar Interference Mitigation Working Group (WTRIM WG) are organized, requires a yearly progress report at the end of each calendar year. This document includes a brief description of the major projects undertaken by the WTRIM WG for fiscal year 2025.
The fiscal year (FY) 2019 update of this report satisfies the technical deliverable “Simultaneous reconstruction of simultaneous observables” for project OR16-ML-3DTomography-PD3Jb, “3D Tomography and Image Processing Using Fast Neutrons.” At its inception, this project had two overall goals. The first of these goals was to extend associated-particle fast neutron transmission and, particularly, induced-reaction tomographic imaging algorithms to three dimensions. The second of these goals was to automatically segment the resultant tomographic images into constituent parts and then extract information about the parts, such as the class of shape and potentially shape parameters. This report addresses the component of the project concerned with three-dimensional (3D) image reconstruction and represents the cumulative progress to date. In particular, it addresses the ability to decompose neutrons arriving at times consistent with transmission into transmission and small-angle scattering. Because incremental progress in each year builds on the previous year’s progress and end-ofyear status, progress is most usefully recorded in a cumulative document where incremental progress is reported on a year-by-year basis. Consequently, this report constitutes an update of the last 3 years’ reports [1, 2, 14]. The present year’s progress is detailed in Section 7.
The outline of this presentation is: (1) Collaboration on Master Alloy Melting; (2) Data for Safety Analysis, (3) HIP can development status, (4) Bond strength quality, (5) Plasma spraying results, and (6) Bare Rolling Larger Rolling Ingots. Significant near term progress has been made in five areas: (1) Collaboration on Master Alloy Melting; (2) HIP can development status; (3) Bond strength quality; (4) Plasma spraying results; and (5) Bare Rolling Larger Rolling Ingots. Significant progress is expected in the next month on several important areas: (1) Intrinsic bond strength of plasma sprayed Zr (2) Advanced Cleaning; (3) Residual Stress Collaboration with INL; and (4) Cost Metric Assessment.
Factory fueling and assembly, multi-site operation, and the associated transportation of advanced nuclear systems present both new opportunities and challenges for microreactor deployment. These areas have not been demonstrated under Nuclear Regulatory Commission rules and regulations. A goal of the Systems Integration and Analysis technical area under the US Department of Energy Microreactor Program for the current fiscal year is to articulate these challenges and provide industry recommendations. This mid-year progress report describes the progress and some of the contributions to this effort by the Advanced Reactor Engineering and Development section at Oak Ridge National Laboratory. The content provided here is preliminary and may change before being incorporated into a later report, which is expected to be completed in September 2022.
The EV charging working group (#982) was formed in summer 2022 to define the equip, points, relationships, and operational data related to Level 1-2 (AC) and Level 3 (DC) Electric Vehicle Supply Equipment (EVSE). Last year, the working group developed formal EVSE-related equipment definitions, where were merged into the Project Haystack documentation in November 2022. More recently the group has also been working to expand and improve Haystack definitions related to electrical equipment and circuits. This initiative is important both for EV charging related applications and to improve Project Haystack's appeal to other industry verticals such as data centers, commercial building electrification, and more. In this presentation we will share the working group's motivation, progress, and near-term objectives.
TRIUMF is involved in a major upgrade. The Advanced Rare IsotopeE Laboratory (ARIEL) has become a fully funded project in July 2010. A 10 mA 50 MeV SRF electron linac (e-linac) operating CW at 1.3 GHz is the key component of this initiative. This machine will serve as a second independent photo-fission driver for Rare Isotope Beams (RIB) production at TRIUMF's Isotope Separator and Accelerator (ISAC) facility. The cryogens delivery system requirements are driven by the electron accelerator cryomodule design [1, 2]. Since commencement of the project in 2010 the cryogenic system of e-linac has moved from the conceptual design phase into engineering design and procurement stage. The present document summarizes the progress in cryogenic system development and construction. Current status of e-linac cryogenic system including details of LN{sub 2} storage and delivery systems, and helium subatmospheric (SA) system is presented. The first phase of e-linac consisting of two cryomodules, cryogens storage, delivery, and distribution systems, and a 600 W class liquid helium cryoplant is scheduled for installation and commissioning by year 2014.
The present report documents the techniques developed to segment fast-neutron tomographic images of objects consisting of assemblies of machined parts with distinct boundaries. This report satisfies the fiscal year 2018 technical deliverable for project OR16-3DTomography-PD3Jb, “3D Tomography and Image Processing Using Fast Neutrons,” to report on the extension of geometric shape-finding algorithms to three dimensions. The project has two overall goals. The first of these goals is to extend associated-particle fast-neutron transmission and, particularly, induced-reaction tomographic imaging algorithms to three dimensions. This aspect of the project is beyond the scope of this report. The second goal is to automatically segment the resultant tomographic images into constituent parts and then extract information about the parts, such as the class of shape and potentially the shape parameters. This report describes progress for the image segmentation part of the project. Imaging techniques have been developed as high-confidence methods for confirming the presence and configuration of special nuclear materials (SNM). This high confidence is achieved at the cost of revealing considerable information that may be undesirable to share with the operator of the equipment. One potential way to make use of the high-confidence of imaging methods without revealing imaging data is to employ automated analysis that can extract meaningful attributes of the SNM without showing imaging data to the operator. An essential step of this automated analysis is the segmentation of the image into its constituent parts. For example, a three-dimensional (3D) fast-neutron tomographic image of an assembly containing uranium could be reconstructed and then segmented into discrete parts. The properties of a constituent part identified as uranium would be of interest and could be extracted. For instance, the volume and density of the part would together determine its mass. Moreover, its shape might be expected to fall into a particular geometric class, such as a cube, cylinder, or sphere, and the parameters of the shape (such as side length, height, or diameter) would be expected to fall in a given range. In such an analysis, automated identification of the boundaries and properties of the uranium part is an essential step. A key goal of the present work is to infer the boundaries of objects in fast-neutron tomographic images via the general method of image segmentation. Development of this capability can be broken into more manageable steps, including 1. operator-guided segmentation of two-dimensional (2D) fast-neutron tomographic images, 2. operator-guided segmentation of 3D fast-neutron tomographic images, 3. development of automated segmentation algorithms, and 4. extraction of shape parameters from constituent volumes in 3D. In the first year, the project team reported progress on the first step. Last year, progress on the second step, the extension into 3D, was reported with application to simulated data. The present report describes additional progress on the second step, and progress toward the third step, automated segmentation algorithms. In particular, a multiphase level set approach for image segmentation in three dimensions has been applied to measured 3D data for the first time. Activities related to the fourth step will also be reported, but it will focus on estimation of 3D volumes rather than shape parameters. In this report, the steps before image segmentation will be described, and the multiphase level sets approach to image segmentation will be briefly reviewed. This will be followed by a discussion of the issues encountered when applying the level set technique to measured 3D transmission images, and then a description of the inclusion of induced-reaction data will be provided. Finally, segmentation results for various measured target assemblies will be presented and the image segmentation portion of this project will be summarized and future directions will be discussed.
Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation was delivered in a public webinar on July 21, 2022, providing a high level summary of the progress in the first six months of the study, including presentation of four initial scenario definitions based on extensive stakeholder input.
Many universities have aggressive energy-reduction and climate action plans. To reach these goals, leading universities have developed a suite of common energy-efficiency and renewable generation strategies. In this paper, we present a common set of approaches across the following areas: zero energy campus definitions and planning, best practices for including energy targets in new construction procurement contracts and design guidelines, implementing pilot new construction zero energy projects, aggressively implementing best-in-class laboratory energy-efficiency strategies, planning for and optimizing on-site and off-site renewable energy projects, and high-performance district energy systems. Best practices are compiled from various experiences, including programs funded by the U.S. Department of Energy, Energy Efficiency and Renewable Energy program. The summary of these best practices is to reduce campus energy use and then meet the remaining campus energy needs with renewable energy. The fivestep process to developing and implementing campus energy-reduction plans is described: 1) determine baseline energy consumption, 2) analyze technology options, 3) develop a plan and set priorities, 4) implement the plan, and 5) evaluate progress. The process follows a logical hierarchy of actions to evaluate options by energy sector and set specific targets. It encompasses all energy systems on campus, recognizing that campus-wide measures have increased potential for reducing energy use. Common strategies are explained along with examples and results.
Many universities have aggressive energy-reduction and climate action plans. To reach these goals, leading universities have developed a suite of common energy-efficiency and renewable generation strategies. In this paper, we present a common set of approaches across the following areas: zero energy campus definitions and planning, best practices for including energy targets in new construction procurement contracts and design guidelines, implementing pilot new construction zero energy projects, aggressively implementing best-in-class laboratory energy-efficiency strategies, planning for and optimizing on-site and off-site renewable energy projects, and high-performance district energy systems. Best practices are compiled from various experiences, including programs funded by the U.S. Department of Energy, Energy Efficiency and Renewable Energy program. The summary of these best practices is to reduce campus energy use and then meet the remaining campus energy needs with renewable energy. The fivestep process to developing and implementing campus energy-reduction plans is described: 1) determine baseline energy consumption, 2) analyze technology options, 3) develop a plan and set priorities, 4) implement the plan, and 5) evaluate progress. The process follows a logical hierarchy of actions to evaluate options by energy sector and set specific targets. It encompasses all energy systems on campus, recognizing that campus-wide measures have increased potential for reducing energy use. Common strategies are explained along with examples and results.
The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In recent years, the project has encountered issues that affected project design completion, especially in the Pretreatment and High-Level Waste Facilities. These included technical issues, changes in requirements, changes in funding, weaknesses in the nuclear supply chain, identification of new hazards, and new information about the tank waste. The combination of these issues led to a suspension of construction of the Pretreatment Facility and a partial suspension of construction of the High-Level Waste Facility in mid-2012. Since then, the WTP Project has made significant progress in establishing and implementing a strategy for resolving these issues. This strategy focuses on resuming full production work in a sequence that fully supports the DOE plan for a phased approach for starting treatment of the Hanford tank waste, beginning with the low-activity waste streams. Concurrent with the technical and programmatic issues, the DOE Office of River Protection has made numerous changes in the processes it uses to manage and oversee the WTP Project. These changes have had a beneficial impact on the progress the project has made in establishing a path forward for resuming production activities, and on planning for the necessary contract and baseline changes needed to complete the project. (authors)
The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)