Engineering PapersSearch

SEARCH · Engineering Papers

Results for “procurement options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Data Interconnection Exploration

This project involves innovating the way the Quality Assurance organization at the Jet Propulsion Laboratory (JPL) tracks the receiving inspection of JPL Critical Items (JCI) procured from suppliers. The Quality Assurance organization uses a Microsoft Access based front-end to enter items into an inspection queue. The current design has grown to be much more than was expected when the inspection queue system was created in 2007. The goal is to migrate to a web based solution that will allow the handling of more data, multiple input interfaces, and customizable display options. This has been achieved by implementing a divided tables scheme, the use of ColdFusion programming language, and the usage of Web 2.0 technologies such as AJAX and jQuery. These updates will allow for future expansion as well as the standardization of inspection queues for the Quality Assurance organization. When engineers and scientists order flight hardware, they cannot use it straight away. After a spacecraft or a satellite has been launched, it will be impossible to repair; therefore, the parts used must be inspected to make sure they are operating correctly and within the required specifications. The task of inspecting these JPL Critical Items (JCI) falls on the Quality Assurance organization. One of the tools the receiving inspection group uses is a database to maintain a queue of inspections that need to be done and of inspections that have been completed. The current Access interface has worked well but increased amounts of data, multiple input interfaces, and changes to how data is handled have made it necessary to seek a new way of organizing items for inspection. In addition, the different inspection groups have recently been merged and each has different ways of keeping track of inspection information. The ultimate goal is for the new group to have one shared inspection queue and website. To achieve this goal, I have been working with Ian Luczon of Procurement Quality Assurance and 3 Myers Hawkins, another intern, to not only create the new queue for receiving inspection but also a central web portal for the newly combined inspection group.

flight hardware

Trade study: Liquid hydrogen transportation - Kennedy Space Center

Cryogenic transportation methods for providing liquid hydrogen requirements are examined in support of shuttle transportation system launch operations at Kennedy Space Center, Florida, during the time frames 1982-1991 in terms of cost and operational effectiveness. Transportation methods considered included sixteen different options employing mobile semi-trailer tankers, railcars, barges and combinations of each method. The study concludes that the most effective method of delivering liquid hydrogen from the vendor production facility in New Orleans to Kennedy Space Center includes maximum utilization of existing mobile tankers and railcars supplemented by maximum capacity mobile tankers procured incrementally in accordance with shuttle launch rates actually achieved.

Gray, D. J.

A Framework for Assessing the Reusability of Hardware (Reusable Rocket Engines)

Within the space flight community, reusability has taken center stage as the new buzzword. In order for reusable hardware to be competitive with its expendable counterpart, two major elements must be closely scrutinized. First, recovery and refurbishment costs must be lower than the development and acquisition costs. Additionally, the reliability for reused hardware must remain the same (or nearly the same) as "first use" hardware. Therefore, it is imperative that a systematic approach be established to enhance the development of reusable systems. However, before the decision can be made on whether it is more beneficial to reuse hardware or to replace it, the parameters that are needed to deem hardware worthy of reuse must be identified. For reusable hardware to be successful, the factors that must be considered are reliability (integrity, life, number of uses), operability (maintenance, accessibility), and cost (procurement, retrieval, refurbishment). These three factors are essential to the successful implementation of reusability while enabling the ability to meet performance goals. Past and present strategies and attempts at reuse within the space industry will be examined to identify important attributes of reusability that can be used to evaluate hardware when contemplating reusable versus expendable options. This paper will examine why reuse must be stated as an initial requirement rather than included as an afterthought in the final design. Late in the process, changes in the overall objective/purpose of components typically have adverse effects that potentially negate the benefits. A methodology for assessing the viability of reusing hardware will be presented by using the Space Shuttle Main Engine (SSME) to validate the approach. Because reliability, operability, and costs are key drivers in making this critical decision, they will be used to assess requirements for reuse as applied to components of the SSME.

Childress-Thompson, Rhonda

A Framework for Assessing the Reusability of Hardware (Reusable Rocket Engines)

Within the space flight community, reusability has taken center stage as the new buzzword. In order for reusable hardware to be competitive with its expendable counterpart, two major elements must be closely scrutinized. First, recovery and refurbishment costs must be lower than the development and acquisition costs. Additionally, the reliability for reused hardware must remain the same (or nearly the same) as "first use" hardware. Therefore, it is imperative that a systematic approach be established to enhance the development of reusable systems. However, before the decision can be made on whether it is more beneficial to reuse hardware or to replace it, the parameters that are needed to deem hardware worthy of reuse must be identified. For reusable hardware to be successful, the factors that must be considered are reliability (integrity, life, number of uses), operability (maintenance, accessibility), and cost (procurement, retrieval, refurbishment). These three factors are essential to the successful implementation of reusability while enabling the ability to meet performance goals. Past and present strategies and attempts at reuse within the space industry will be examined to identify important attributes of reusability that can be used to evaluate hardware when contemplating reusable versus expendable options. This paper will examine why reuse must be stated as an initial requirement rather than included as an afterthought in the final design. Late in the process, changes in the overall objective/purpose of components typically have adverse effects that potentially negate the benefits. A methodology for assessing the viability of reusing hardware will be presented by using the Space Shuttle Main Engine (SSME) to validate the approach. Because reliability, operability, and costs are key drivers in making this critical decision, they will be used to assess requirements for reuse as applied to components of the SSME.

Childress-Thompson, Rhonda

Analysis of Alternative Architectures for Cargo Lunar Landers

NASA’s Human Landing System (HLS) program has been working with commercial partners to develop human-class lunar landers to return the first American woman and next American man to the lunar surface in the mid 2020’s. In an effort to expand human presence beyond low Earth orbit, NASA’s Artemis program aims to facilitate a sustainable, long-term human presence in cis-lunar space. A component of this will require significant infrastructure to be delivered to the lunar surface. Delivering this infrastructure will require a significant lander capability that has yet to be developed. A thorough understanding of cargo lunar lander architectures is required such that select alternatives can be identified that best support the Artemis program’s objective of sustainability. The goal of this study is to aid NASA and its partners in the understanding of the cargo lunar lander trades space, as well as identify potential robust alternatives. The results will support NASA as it moves forward with key activities such as requirements formulation, agency strategic planning, and potential cargo lunar lander procurements. The study builds off of recent work performed by the Human Landing System program’s Architecture and Systems Analysis group to encompass a broad trade space of cargo lunar lander architecture alternatives. The current trade space as depicted by the morphological matrix and mission graph in Fig. 1 and Fig. 2, respectively, includes key alternative options that have become highly relevant due to current HLS activities and include on-orbit refueling, active cryogenic fluid management, Earth orbit aggregation, and global lunar access. The authors believe that there is also a statistically relevant impact of lander-payload configuration on the primary structure of the vehicle that could greatly impact alternative selection. Because of this, several conceptual lander-payload configurations will be evaluated to determine the level of impact. The current set of conceptual configurations are shown in Fig. 3 and Fig. 4. To aid the conceptual evaluation of these configurations, a catalogue of notional payloads has been developed that represent a wide range of masses and volumes that are expected to be delivered in support of a sustained human lunar presence, including pressurized and unpressurized rovers, surface habitats, power systems, and other support infrastructure. In order to execute this study in a timely fashion, a similar approach to that utilized in a similar 2019 study focused on 2024 human lunar sorties will be employed [1]. The team utilized a novel architecture synthesis framework currently being developed by NASA/MSFC to evaluate over 600,000 lunar lander architectures over a two month time frame [2]. From this large data set, varying ground rules and assumptions were applied as filters to explore the trade space to identify alternatives which exhibited robustness, as measured by launch vehicle payload margin, to absorb the natural growth that occurs during design maturation. The set of Earth-Moon system Delta-Vs assumed from the 2019 study, shown in Fig. 5, will be repurposed to accelerate model formulation for this effort. Additionally, current efforts in collaboration with the Georgia Institute of Technology’s Aerospace System Design Lab will be integrated to provide probabilistic modeling of the cargo lunar lander architectures to aid in identifying robust design alternatives [3]. The approach will help minimize potential impacts due to large levels of uncertainty inherent to pre phase-A conceptual design. By leveraging these past and present studies and partnerships, a highly detailed set of data can be generated in a short time period to aid NASA in the coming years to support the goal of a sustained human lunar presence.

Architectures

X-traktor: A Rookie Robot, Simple, Yet Complex, Impeccably Designed, a Very Innovative Multidisciplinary Engineering Masterpiece

FIRST is the acronym of For Inspiration and Recognition of Science and Technology. FIRST is a 501.C.3 non-profit organization whose mission is to generate an interest in science and engineering among today's young adults and youth. This mission is accomplished through a robot competition held annually in the spring of each year. NASAs Marshall Space Flight Center, Education Programs Department, awarded a grant to Lee High School, the sole engineering magnet school in Huntsville, Alabama. MSFC awarded the grant in hopes of fulfilling its goal of giving back invaluable resources to its community and engineers, as well as educating tomorrow's work force in the high-tech area of science and technology. Marshall engineers, Lee High School students and teachers, and a host of other volunteers and parents officially initiated this robot design process and competitive strategic game plan. The FIRST Robotics Competition is a national engineering contest, which immerses high school students in the exciting world of science and engineering. Teaming with engineers from government agencies, businesses, and universities enables the students to learn about the engineering profession. The students and engineers have six weeks to work together to brainstorm, design, procure, construct, and test their robot. The team then competes in a spirited, 'no-holds barred' tournament, complete with referees, other FIRST-designed robots, cheerleaders, and time clocks. The partnerships developed between schools, government agencies, businesses, and universities provide an exchange of resources and talent that build cooperation and expose students to new and rewarding career options. The result is a fun, exciting, and stimulating environment in which all participants discover the important connections between classroom experiences and real-world applications. This paper will highlight the story, engineering development, and evolutionary design of Xtraktor, the rookie robot, a manufacturing marvel and engineering achievement.

Henderson, A. J., Jr.

Qualification of a Hybrid Propulsion System for the Mars Ascent Vehicle

Technology for a hybrid based propulsion system is being developed to support a potential Mars Sample Return campaign. A Mars Ascent Vehicle (MAV) concept for launching samples off of Mars, and delivering them to orbit for further transport to Earth may utilize hybrid propulsion due to the predicted favorable low temperature characteristics and high performance of this option. However, the hybrid option is still undergoing technology development to demonstrate these capabilities. Once development of a capable hybrid propulsion system is proven, further work will be required. This will include environmental testing relative to the mission, and integration with the vehicle reaction control systems and payload. Qualification of such a system will be a significant effort. It will require specialized procurements for the propellants and environments involved, and further testing of the more specialized designs. This paper details an estimate of the tasks required to complete development efforts from Technical Readiness Level 5 (TRL5) through qualification. A success based program was formulated to reach the required performance metrics sufficient for a standard Preliminary Design Review (PDR). Using task level inputs from team members cost and schedule were conceived for continued progress to Critical Design Review (CDR), then through Qualification.

Prince, Andrew

Geostationary Operational Environmental Satellite (GOES-N report). Volume 1: Technical

The GOES-N study consisted of five distinct tasks including: determining replication costs of GOES I-M and GOES-7 in the GOES-N time frame; defining and evaluating modifications to GOES I-M to improve efficiency or reduce costs; and defining evolutionary changes to the GOES I-M design to satisfy National Weather Service (NWS) 1983 and NOAA 1989 requirements. The categorization and disposition of NOAA requirements is reported in volume 1 section 4. Results of the GOES I-M efficiency/cost improvement modifications study are described in Section 7.1. The system concept options 1, 2, and 3 that generally represent the results of the Task 2, 3A, and 3B studies are summarized in Section 7.2. Another result of the GOES-N study, the determination of which NWS 1983 and NOAA 1989 requirements can be met with the three options, is contained in volume 1 section 7. Conclusions and recommendations are covered in volume 1 section 8. Imager, sounder, control system, space environment monitor, search and rescue, weather facsimile, data collection system, and products/process/communications recommendations were extracted from sections 9, 10, and 11. Section 8 also contains conclusions pertaining to programmatic operational satellite issues (prerequisite development strategies, the direct procurement of instruments by the government, protoflight mission, etc.). Sections 9, 10, and 11 address instrument, control system, image/navigation/registration, and other system design considerations and surveys. These sections are supported by the appendices in volume 2.

Source record

Commercial Orbital Transportation Services (COTS) Demonstrations

U.S. space policy directs pursuit of commercial opportunities for providing transportation and other services low Earth orbit and beyond. COTS Project established to implement policy. COTS strategy: Phase 1) Assist industry with system development/demonstrations (COTS Demos); Phase 2) Procure commercial services for ISS logistics support. COTS Demonstrations competition completed in 10 months. Two industry partners selected for funded Space Act Agreements: 1) SpaceX & Rocketplane-Kistler; and 2) Unfunded Space Act Agreements in work with other competitors. COTS budget of $500 M thru 2010, with pay for performance milestone approach. Cargo flight demonstrations planned for 2008 and 2009: Crew flight demonstration options for 2011-2012. Commercial cargo transportation services potentially available as early as 2009-2010. Successful COTS partners may open new space markets and provide reliable, cost effective cargo and crew transportation services, a new era for commercial space.

Lindenmoyer, Allan

Renewable Energy Contracting Options and Renewable Energy Certificates

Virtual Trainings are the online version of the multi-day workshops known as In-Plants (INPLTs) offered by the DOE Better Plants program. ORNL has a 6-session weekly training on Renewable Energy Contracting Options and RECs starting August 5th 2025 (10 am ET) focused on options and resources for the manufacturing sector. This session is earmarked for Tuesday, August 26th, 10 AM ET.

29 ENERGY PLANNING, POLICY, AND ECONOMY

An assessment of thermal design procedures for Shuttle payloads

A review of the thermal design options for unmanned Shuttle payloads is presented. Because many future Shuttle payloads will have budgets and less time available for the definition of their thermal subsystems, simplified design procedures will be the most cost-effective. The thermal interface between an individual payload and the Orbiter is discussed. A simplified, modular thermal control system that will reduce the cost of providing thermal protection by minimizing both the initial procurement cost of any specialized hardware and the need for a detailed thermal interface analysis is described.

Almgren, D. W.

Holographic Weapons Sight as Crew Optical Alignment Sight

Crew Optical Alignment Sights (COAS) are used by spacecraft pilots to provide a visual reference to a target spacecraft for lateral relative position during rendezvous and docking operations. NASA s Orion vehicle, which is currently under development, has not included a COAS in favor of automated sensors, but the crew office has requested such a device be added for situational awareness and contingency support. The current Space Shuttle COAS was adopted from Apollo heritage, weighs several pounds, and is no longer available for procurement which would make re-use difficult. In response, a study was conducted to examine the possibility of converting a commercially available weapons sight to a COAS for the Orion spacecraft. The device used in this study was the XPS series Holographic Weapon Sight (HWS) procured from L-3 EOTech. This device was selected because the targeting reticule can subtend several degrees, and display a graphic pattern tailored to rendezvous and docking operations. Evaluations of the COAS were performed in both the Orion low-fidelity mockup and rendezvous simulations in the Reconfigurable Operational Cockpit (ROC) by crewmembers, rendezvous engineering experts, and flight controllers at Johnson Space Center. These evaluations determined that this unit s size and mounting options can support proper operation and that the reticule visual qualities are as good as or better than the current Space Shuttle COAS. The results positively indicate that the device could be used as a functional COAS and supports a low-cost technology conversion solution.

Merancy, Nujoud

Space Transportation Systems Technologies

This document is the final report by the Science Applications International Corporation (SAIC) on contracted support provided to the National Aeronautics and Space Administration (NASA) under Contract NAS8-99060, 'Space Transportation Systems Technologies'. This contract, initiated by NASA's Marshall Space Flight Center (MSFC) on February 8, 1999, was focused on space systems technologies that directly support NASA's space flight goals. It was awarded as a Cost-Plus-Incentive-Fee (CPIF) contract to SAIC, following a competitive procurement via NASA Research Announcement, NRA 8-21. This NRA was specifically focused on tasks related to Reusable Launch Vehicles (RLVs). Through Task Area 3 (TA-3), "Other Related Technology" of this NRA contract, SAIC extensively supported the Space Transportation Directorate of MSFC in effectively directing, integrating, and setting its mission, operations, and safety priorities for future RLV-focused space flight. Following an initially contracted Base Year (February 8, 1999 through September 30, 1999), two option years were added to the contract. These were Option Year 1 (October 1, 1999 through September 30, 2000) and Option Year 2 (October 1, 2000 through September 30, 2001). This report overviews SAIC's accomplishments for the Base Year, Option Year 1, and Option Year 2, and summarizes the support provided by SAIC to the Space Transportation Directorate, NASA/MSFC.

Laue, Jay H.

NASA’s Human Landing System: The Strategy for the 2024 Mission and Future Sustainability

In response to the 2018 White House Space Policy Directive- sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit and 3) demonstrating the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of required systems, NASA is utilizing public-private engagements through the Human Exploration and Operations (HEO) Mission Directorate’s NextSTEP Broad Agency Announcements. The design, development and demonstration of the Human Landing System (HLS) is expected to be led by commercial partners. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs from the Science Mission Directorate (SMD) and Space Technology Mission Directorate (STMD). SMD’s Commercial Lunar Payload Services (CLPS) initiative will procure commercial robotic lunar delivery services and the development of science instruments and technology demonstration payloads. The Space Technology Mission Directorate (STMD) portfolio of technology advancements relative to HLS include lunar lander components and technologies for pointing, navigation and tracking, fuel storage and transfer, autonomy and mobility, communications, propulsion and power. In addition to describing the objectives and requirements of the 2024 Artemis mission, this paper will present NASA’s approach to accessing the lunar surface with an affordable human-rated landing system, current status and the role o a sustainable lunar presence.

Chavers, Greg

Can section 45Q tax credit foster decarbonization? A case study of geologic carbon storage at Acid Gas Injection wells in the Permian Basin

Carbon capture, utilization, and storage (CCUS) is an important pathway for meeting climate mitigation goals. While the economic viability of CCUS is well understood, previous studies do not evaluate the economic feasibility of carbon capture and storage (CCS) in the Permian Basin specifically regarding the new Section 45Q tax credits. We developed a technoeconomic analysis method, evaluated the economic feasibility of CCS at the acid gas injection (AGI) wells, and assessed the implication of Section 45Q tax credits for CCS at the AGIs. We find that the compressors, well depth, and the permit and monitoring costs drive the facility costs. Compressors are the predominant contributors to capital and operating expenditure driving the levelized cost of CO 2 storage. Strategic cost reduction measures identified include 1) sourcing of low-cost electricity and 2) optimizing operational efficiency in well operations. In evaluating the impact of the tax credits on CCS projects, facility scale proved decisive. We found that facilities with an annual injection rate exceeding 10,000 MT storage capacity demonstrate economic viability contingent upon the procurement of inputs at the least cost. The new construction of AGI wells were found to be economically viable at a storage capacity of 100,000 MT. The basin is heavily focused on CCUS (tax credit – $\$$65/MT CO 2 ), which overshadows CCS ($\$$85/MT CO 2 ) opportunities. Balancing the dual objectives of CCS and CCUS requires planning and coordination for optimal resource and pore space utilization to attain the basin's decarbonization potential. We also found that CCS on AGI is a lower cost CCS option as compared to CCS on other industries.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Military markets for solar thermal electric power systems

The Department of Defense maintains an inventory of over 1,800 MW of engine-generators 15 KW and larger, with an estimated procurement rate of over 140 MW/year. Nearly the entire requirement could be met by advanced heat engines of the types being developed as point-focussing, distributed receiver power plants. A conceptual system consisting of a heat engine which efficiently burns liquid fossil or synthetic fuels, with a 'solarization kit' for conversion to hybrid solar operation could meet existing DOD requirements for new systems which are quieter, lighter, and multi-fueled. An estimated 24 percent (33 MW/year) or more could operationally benefit from the solar option. Baseline cost projections indicate levelized energy cost goals of 210 to 120 mills/KWh (15 to 1000 KW systems). Fuel cost escalation is the major factor affecting the value of the solar option. A baseline calculation for fuel at $0.59/gal in spring, 1979, escalating at 8 percent above general inflation indicates a value of $2700/KWe for a solarization kit.

Hauger, J. S.

Status of the Landsat Data Continuity Mission

Efforts to begin implementing a successor mission to Landsat 7, called the Landsat Data Continuity Mission (LDCM), suffered a set back in 2003. NASA and the Department of Interior (DOI)/U.S. Geological Survey (USGS) currently manage the Landsat Program as an interagency partnership. The two agencies had planned to purchase data meeting LDCM specifications from a privately owned and commercially operated satellite system beginning in March, 2007. This approach represented a departure from the traditional procurement of a government owned and operated satellite system. NASA, however, cancelled a Request-for-Proposals (RFP) for providing the required data after an evaluation of proposals received from private industry. NASA concluded that the proposals failed to meet a key objective and expectation of the RFP, namely, to form a fair and equitable partnership between the Government and private industry. Alternative strategies for implementing an LDCM are now under consideration. The Executive Office of the President formed an interagency working group on the LDCM following the RFP cancellation. The working group is considering other options for implementing a successor system to Landsat 7 consistent with the Land Remote Sensing Policy Act of 1992 (Public Law 102-555). This Act lists four management options for consideration: 1) private sector funding and management; 2) an international consortium; 3) funding and management by the U.S. Government; and 4) a cooperative effort between the US. Government and the private sector. The working group is currently attempting to minimize the risk of a Landsat data gap through development of a strategy that leads to a Landsat 7 successor mission. The selected strategy and the status of the mission will be presented at the Symposium.

Irons, James R.

Landing Humans and Human-Class Cargo on the Moon and Mars

For more than a decade, efforts have been ongoing at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, to land humans and large, human-rated cargo on planetary bodies like the Moon and Mars. This work continues today under the Center’s Lander Programs (LP) office. Recognizing MSFC’s heritage, NASA stood up the Human Landing System program at the Center in August 2019 to be responsible for spacecrafts that will land the next American astronauts on the Moon under Artemis. With work well underway for the historic Artemis III mission to land the first woman and first person of color on the lunar surface through the Appendix H Option A contract with SpaceX, LP is focused on the development of landers that will support the Agency’s long-term Artemis efforts at the Moon and NASA’s future at Mars. In March 2022, NASA announced its plan to solicit a second industry provider in addition to SpaceX to develop and demonstrate a lander that meets the program’s extended set of requirements for missions beyond Artemis III. Under the umbrella of Sustaining Lunar Development, these requirements will meet NASA’s needs for recurring, long-term access to the lunar surface, such as accommodating an increased crew size and delivering more mass to the surface. Additionally, NASA plans to leverage crewed lander development activities to procure and certify the design of landers capable of human-class cargo delivery. This paper will examine how the Lander Program office at MSFC is bridging from the initial demonstration phase of development for the Human Landing System program to the Sustaining Lunar Development phase and feeding forward to Mars. The requirements and lines of effort for landing humans and human class cargo will be discussed, as well as near-term and future milestones for the program.

Lemuel Carpenter