Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Laser data links for communication satellites

Laser data relays potentially offer continuous 1 Gb/sec bandwidths, drastically increasing low-altitude satellite data collection capacity over present store-and-dump techniques. Availability of the laser link as a reliable alternative, operating within conventional low-altitude communication subsystem weight and power allocations, will create customer pressure for adoption. Major communication relay system impacts are discussed including reliability, mechanical design, attitude control, on-board data handling, contamination control, and traffic-net management. Interface parameters which drive the fundamental relay satellite design concepts are discussed, and conditions requiring early quantitative analysis are identified.

Ohern, W. L.↗

Study to investigate and evaluate means of optimizing the Ku-band combined radar/communication functions for the space shuttle

The Ku band radar system on the shuttle orbiter operates in both a search and a tracking mode, and its transmitter and antennas share time with the communication mode in the integrated system. The power allocation properties and the Costa subloop subcarrier tracking performance associated with the baseline digital phase shift implementation of the three channel orbiter Ku band modulator are discussed.

Weber, C. L.↗

Coherent detection of frequency-hopped quadrature modulations in the presence of jamming. I - QPSK and QASK modulations

This paper examines the performance of coherent QPSK and QASK systems combined with FH or FH/PN spread spectrum techniques in the presence of partial-band multitone or noise jamming. The worst-case jammer and worst-case performance are determined as functions of the signal-to-background noise ratio (SNR) and signal-to-jammer power ratio (SJR). Asymptotic results for high SNR are shown to have a linear dependence between the jammer's optimal power allocation and the system error probability performance.

Simon, M. K.↗

Automating the U.S. Space Station's electrical power system

NASA's Lewis Research Center is developing a highly automated system for the generation, storage and distribution of electrical power aboard the projected Space Station. This autonomous power system will employ conventional algorithms, enhanced by expert systems, to schedule power, allocate energy, diagnose causes of failure, propose goals, prepare plans for their implementation, evaluate their consequences, and select optimum plans for their execution. While crew-interactive expert systems will be ready for the initial Space Station, total system autonomy is expected to require additional development time.

Dolce, James L.↗

Space Station Freedom overview

The status of the Space Station Freedom project is briefly reviewed. The multilateral agreements achieved to this point are summarized, and the results of preliminary design reviews are discussed. Progress being made in implementing improvement recommendations and in meeting weight and power allocations is addressed.

Kohrs, Richard H.↗

Definition and preliminary design of the LAWS (Laser Atmospheric Wind Sounder). Volume 1, phase 2: Executive summary

The objective of phase 1 of the LAWS study was to define and perform a preliminary design for the Laser Atmospheric Wind Sounder (LAWS) instrument. The definition phase consisted of identifying realistic concepts for LAWS and analyzing them in sufficient detail to be able to choose the most promising one for the LAWS application. System and subsystem configurations were then developed for the chosen concept. The concept and subsequent configurations were to be compatible with two prospective platforms--the Japanese Polar Orbiting Platform (JPOP) and as an attached payload on the Space Station Freedom. After a thorough and objective concept selection process, we chose a heterodyne detection Doppler lidar using a CO2 laser transmitter operating at 9.1 microns over a 2.1 micron solid state system. The choice of the CO2 approach over solid-state reflects the advanced state of development of CO2 lasers, its maturity in ground-based systems and the eased subsystem requirements associated with the longer wavelength. The CO2 lidar concept was then analyzed in detail to arrive at a configuration for the instrument and its major subsystems. Our approach throughout the configuration design was to take a systems perspective and trade requirements between subsystems, wherever possible, to arrive at configurations which made maximum use of existing, proven technology or relatively straightforward extensions to existing technology to reduce risk and cost. At the conclusion of Phase 1 we arrived at a configuration for LAWS which meets the performance requirements, yet which is less complex than previous designs of space-based wind sensors (e.g. Windsat), employs lightweight technologies to meet its weight goals (less than 800kg) and sufficiently flexible to offer various operational scenarios with power requirements from about 2 kW to 3 kW. The Phase 1 Final Report was released in March 1990. The 21-month Phase 2 began in October 1990. The requirement to accommodate LAWS as an attached payload on Space Station Freedom was deleted and the orbit altitude for the Japanese polar orbiting platform was changed from 824 km to 705 km. The power allocated to LAWS was reduced to 2.2 kW from 3 kW. Subsequently the availability of a Japanese Polar Orbiting Platform was called into question and LAWS accommodation studies were continued using a conceptual, ATLAS-launched platform supplied by MSFC. In March 1991 a modification to the original contracts was funded to provide a LAWS laser breadboard which could demonstrate all the performance requirements of the LAWS laser. Also funded as part of the same contract extension was a lifetest demonstration using an existing laser at STI. The breadboard extension was an eighteen month effort and the period of performance was therefore extended to September 30, 1992.

Source record↗

Microwave Power for Smart Membrane Actuators

The concept of microwave-driven smart membrane actuators is envisioned as the best option to alleviate the complexity associated with hard-wired control circuitry. A large, ultra-light space structure, such as solar sails and Gossamer spacecrafts, requires a distribution of power into individual membrane actuators to control them in an effective way. A patch rectenna array with a high voltage output was developed to drive smart membrane actuators. Networked patch rectenna array receives and converts microwave power into a DC power for an array of smart actuators. To use microwave power effectively, the concept of a power allocation and distribution (PAD) circuit is developed and tested for networking a rectenna/actuator patch array. For the future development, the PAD circuit could be imbedded into a single embodiment of rectenna and actuator array with the thin-film microcircuit embodiment. Preliminary design and fabrication of PAD circuitry that consists of a sixteen nodal elements were made for laboratory testing.

Choi, Sang H.↗

Regenerative pseudo-noise ranging for deep space applications

Currently, ranging for deep space missions is performed by turning around the uplink ranging modulation and remodulating it onto the downlink carrier. This method results in about 1.5 MHz of noise also being modulated onto the downlink, severely degrading the received ranging SNR on the ground. This degradation must be compensated for by either increasing the integration time of the received signal, which increases the length of time for the track, or increasing the downlink ranging signal's modulation index, which decreases the power available for the telemetry modulation. A method for the regeneration on the spacecraft of a pseudo noise (PN) ranging signal has been developed. This method allows for an increase of up to 30dB in the received downlink ranging power. The increased power can be used to decrease the measurement uncertainty, reduce the time of the measurement, or increase the power allocated to the downlink telemetry. This system was implemented in the Spacecraft Transponding Modem that was developed by JPL for NASA.

deep space ranging↗

Deep-Space Optical Terminals (DOT)

A conceptual design study titled Deep-Space Optical Terminals was recently completed for an optical communication technology demonstration from Mars in the 2018 time frame. We report on engineering trades for the entire system, and for individual subsystems including the flight terminal, the ground receiver and the ground transmitter. A point design is described to meet the requirement for greater than 0.25 Gb/s downlink from the nearest distance to Mars of 0.42 AU with a maximum mass and power allocation of 40 kg and 110 W. Furthermore, the concept design addresses link closure at the farthest Mars range of 2.7 AU. Maximum uplink data-rate of 0.3 Mb/s and ranging with 30 cm precision are also addressed.

optical communications↗

Compact Deep-Space Optical Communications Transceiver

Deep space optical communication transceivers must be very efficient receivers and transmitters of optical communication signals. For deep space missions, communication systems require high performance well beyond the scope of mere power efficiency, demanding maximum performance in relation to the precious and limited mass, volume, and power allocated. This paper describes the opto-mechanical design of a compact, efficient, functional brassboard deep space transceiver that is capable of achieving megabyte-per-second rates at Mars ranges. The special features embodied to enhance the system operability and functionality, and to reduce the mass and volume of the system are detailed. System tests and performance characteristics are described in detail. Finally, lessons learned in the implementation of the brassboard design and suggestions for improvements appropriate for a flight prototype are covered.

DSOCT↗

POIWG #53 Vehicle Configuration Overview

The Vehicle Configuration Team is composed of the MAGIK, CAMMP, and IPiP groups who function to model and analyze the internal and external configurations of the ISS, plug-in power allocations, as well as the movement of the robotic arms around the station.

Vehicle↗

DAISY-DAMP: A distributed AI system for the dynamic allocation and management of power

One of the critical parameters that must be addressed when designing a loosely coupled Distributed AI SYstem (DAISY) has to do with the degree to which authority is centralized or decentralized. The decision to implement the Dynamic Allocation and Management of Power (DAMP) system as a network of cooperating agents mandated this study. The DAISY-DAMP problem is described; the component agents of the system are characterized; and the communication protocols system elucidated. The motivations and advantages in designing the system with authority decentralized is discussed. Progress in the area of Speech Act theory is proposed as playing a role in constructing decentralized systems.

Hall, Steven B.↗

A Unique Power System For The ISS Fluids And Combustion Facility

Unique power control technology has been incorporated into an electrical power control unit (EPCU) for the Fluids and Combustion Facility (FCF). The objective is to maximize science throughput by providing a flexible power system that is easily reconfigured by the science payload. Electrical power is at a premium on the International Space Station (ISS). The EPCU utilizes advanced power management techniques to maximize the power available to the FCF experiments. The EPCU architecture enables dynamic allocation of power from two ISS power channels for experiments. Because of the unique flexible remote power controller (FRPC) design, power channels can be paralleled while maintaining balanced load sharing between the channels. With an integrated and redundant architecture, the EPCU can tolerate multiple faults and still maintain FCF operation. It is important to take full advantage of the EPCU functionality. The EPCU acts as a buffer between the experimenter and the ISS power system with all its complex requirements. However, FCF science payload developers will still need to follow guidelines when designing the FCF payload power system. This is necessary to ensure power system stability, fault coordination, electromagnetic compatibility, and maximum use of available power for gathering scientific data.

Fox, David A.↗

Re-scheduling as a tool for the power management on board a spacecraft

The scheduling of events on board a spacecraft is based on forecast energy levels. The real time values of energy may not coincide with the forecast values; consequently, a dynamic revising to the allocation of power is needed. The re-scheduling is also needed for other reasons on board a spacecraft like the addition of new event which must be scheduled, or a failure of an event due to many different contingencies. This need of rescheduling is very important to the survivability of the spacecraft. In this presentation, a re-scheduling tool will be presented as a part of an overall scheme for the power management on board a spacecraft from the allocation of energy point of view. The overall scheme is based on the optimal use of energy available on board a spacecraft using expert systems combined with linear optimization techniques. The system will be able to schedule maximum number of events utilizing most energy available. The outcome is more events scheduled to share the operation cost of that spacecraft. The system will also be able to re-schedule in case of a contingency with minimal time and minimal disturbance of the original schedule. The end product is a fully integrated planning system capable of producing the right decisions in short time with less human error. The overall system will be presented with the re-scheduling algorithm discussed in detail, then the tests and results will be presented for validations.

Albasheer, Omar↗

Propulsion element requirements using electrical power system unscheduled power

The suitability of using the electrical energy from the Space Station's Electrical Power System (EPS) during the periods of peak solar insolation which is currently not specifically allocated (unscheduled power) to produce propulsion propellants, gaseous hydrogen, and oxygen by electrolyzing water is investigated. Reboost propellant requirements are emphasized, but the results are more generally relevant because the balance of recurring propellant requirements are an order of magnitude smaller and the nonrecurring requirements are not significant on an average basis.

Zimmermann, Frank↗

Design and Testing of a Breadboard Electrical Power Control Unit for the Fluid Combustion Facility Experiment

The Fluid Combustion Facility (FCF) Project and the Power Technology Division at the NASA Glenn Research Center (GRC) at Lewis Field in Cleveland, OH along with the Sundstrand Corporation in Rockford, IL are jointly developing an Electrical Power Converter Unit (EPCU) for the Fluid Combustion Facility to be flown on the International Space Station (ISS). The FCF facility experiment contains three racks: A core rack, a combustion rack, and a fluids rack. The EPCU will be used as the power interface to the ISS 120V(sub dc) power distribution system by each FCF experiment rack which requires 28V(sub dc). The EPCU is a modular design which contains three 120V(sub dc)-to-28V(sub dc) full-bridge, power converters rated at 1 kW(sub e) each bus transferring input relays and solid-state, current-limiting input switches, 48 current-limiting, solid-state, output switches; and control and telemetry hardware. The EPCU has all controls required to autonomously share load demand between the power feeds and--if absolutely necessary--shed loads. The EPCU, which maximizes the usage of allocated ISS power and minimizes loss of power to loads, can be paralleled with other EPCUs. This paper overviews the electrical design and operating characteristics of the EPCU and presents test data from the breadboard design.

Kimnach, Greg L.↗

The Pluto fast flyby mission: Completing the reconnaissance of the solar system

The concept of a fast flyby mission to Pluto has been advanced as a means to complete the reconnaissance of the known solar system. In order to acquire data on the Pluto system at the earliest possible time, and within the professional lifetime of investigators now active in the field, concepts are being developed for relatively small spacecraft in the mass range of 70 Kg to 350 Kg with flight times to Pluto of 7 to 13 years. Necessarily, the science complement on such a mission will be very mass and power limited. The challenge will be to define a spacecraft and an instrument package that will maximize the scientific return within these limitations. Cost, of course, will be a major consideration, and funds for new technology development specific to this mission will not be extensive. Consequently, innovative ways to incorporate elegant simplicity into the designs must be found. In order to facilitate exploration of the Pluto-Charon system, fully integrated science payloads must be developed. Two proposed mission designs involving limited mass and power science payloads have been presented to the Outer Planets Science Working Group (OPSWG). These payload mass allocations range from 5 to 30 kilograms with power allocations as low as 5 watts. The drivers behind these low mass and power allocations are that they enable developing missions to fit within the moderate mission cost profile and allow fast flight times to Pluto (7 to 13 years). The OPSWG has prioritized science goals for this class of reconnaissance mission. Three specific science objectives were identified as the highest priority required for the first Pluto mission. These goals were: (1) study of the neutral atmosphere, (2) geology and morphology, and (3) surface compositional mapping. In order to achieve these science goals within the constraints of low mass, power and cost, it may be necessary to combine the functions of 3 conventional instruments (CCD camera, Ultra-Violet Spectrometer, and Infrared Spectrometer) into one fully integrated payload. Where possible, this payload would share optics, mechanisms, electronics and packaging.

Henry, Paul K.↗

Comparison of bit synchronization schemes using AM and summed clocks

This paper considers bit synchronization through the use of a separate clock signal which is either amplitude modulated onto or summed with the data signal. For continuous data transmission, such schemes are known to be inferior, in the sense of efficient use of power, to schemes which derive synchronization directly from the data signal. However, these techniques have application in burst systems such as spacecraft command systems, and in systems where receiver simplicity is more important than power conservation. For systems in which the composite data-clock signal subsequently modulates an RF carrier, it is shown that the summed clock signal performs slightly better than the AM clock signal, and that for both signal types, the optimum allocation of power between data and clock is approximately 9:1.

Geist, J. M.↗