Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Plan-graph Based Heuristics for Conformant Probabilistic Planning

In this paper, we introduce plan-graph based heuristics to solve a variation of the conformant probabilistic planning (CPP) problem. In many real-world problems, it is the case that the sensors are unreliable or take too many resources to provide knowledge about the environment. These domains are better modeled as conformant planning problems. POMDP based techniques are currently the most successful approach for solving CPP but have the limitation of state- space explosion. Recent advances in deterministic and conformant planning have shown that plan-graphs can be used to enhance the performance significantly. We show that this enhancement can also be translated to CPP. We describe our process for developing the plan-graph heuristics and estimating the probability of a partial plan. We compare the performance of our planner PVHPOP when used with different heuristics. We also perform a comparison with a POMDP solver to show over a order of magnitude improvement in performance.

Ramakrishnan, Salesh↗

Autonomous Science Restart for the Planned Europa Mission with Lightweight Planning and Execution

In this paper we present MEXEC - a lightweight on-board planning and execution system that monitors spacecraft state to robustly respond to current conditions. In addition it projects the remaining plan forward in time to detect conflicts and revise the plan. Most current planetary missions use sequence based commanding from the ground,which limits the ability to respond to on-board state varying from planned for state. This results in planning for worst-case execution time, power utilization, data volume and other resources and leads to under utilization of the spacecraft capability. It also limits the ability to respond to faults. Due to the high radiation environment at Jupiter the probability of flight software resets is high. Therefore, of particular interest to the planned Europa Mission is the capability to restart the science plan after flight software resets. In this paper we present results from running Europa flyby scenarios with flight software resets in the Europa flight software test environment. Preliminary results with the prototype scenario show MEXEC takes less than a tenth of a second to respond to resets. The development was done as part of Europa-focused flight software, but MEXEC was designed to be applicable to landers and rovers as well.

Joshi, Rajeev↗

Formulation of consumables management models: Test plan for the mission planning processor working model

The test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.

Connelly, L. C.↗

Communications Contingency Plan: Planning for Crises and Controversy

Interviews were conducted with a variety of Marshall Space Flight Center personnel and local media representatives in Huntsville, Alabama, in order to identify the current perceptions of these individuals regarding communication effectiveness between MSFC and the media. The purposes of the Phase One report are to (1) assess the need for a contingency plan for communicating in situations of crisis and controversy; (2) identify goals and objectives for the planning process; and (3) provide recommendations for future planning activities to achieve the goals and objectives outlined in Phase One. It is strongly recommended that MSFC personnel who are involved in communications with the media participate in a facilitated, strategic communications planning process in order to develop Phase Two of the Communications Contingency Plan (CCP). Phase Two will address (1) the categorizing, ranking and prioritizing of crises and controversies; (2) the development of action steps and implementation strategies for the CCP; and (3) the development of a monitoring and evaluation process for ongoing plan effectiveness.

Treise, Deborah↗

EUROPA2: Plan Database Services for Planning and Scheduling Applications

NASA missions require solving a wide variety of planning and scheduling problems with temporal constraints; simple resources such as robotic arms, communications antennae and cameras; complex replenishable resources such as memory, power and fuel; and complex constraints on geometry, heat and lighting angles. Planners and schedulers that solve these problems are used in ground tools as well as onboard systems. The diversity of planning problems and applications of planners and schedulers precludes a one-size fits all solution. However, many of the underlying technologies are common across planning domains and applications. We describe CAPR, a formalism for planning that is general enough to cover a wide variety of planning and scheduling domains of interest to NASA. We then describe EUROPA(sub 2), a software framework implementing CAPR. EUROPA(sub 2) provides efficient, customizable Plan Database Services that enable the integration of CAPR into a wide variety of applications. We describe the design of EUROPA(sub 2) from the perspective of both modeling, customization and application integration to different classes of NASA missions.

Bedrax-Weiss, Tania↗

Grid Resilience Plans: State Requirements, Utility Practices, and Utility Plan Template

As of June 2024, 14 states and one city require jurisdictional electric utilities to file resilience plans. Drawing on these requirements and filed plans, this report offers a standard template that states and utilities can consider to improve utility filings for grid resilience plans, either as part of a distribution system plan or as a separate filing. Key elements include a vulnerability assessment, description of proposed resilience programs, and projected costs and rate impacts. While many of these requirements and plans focus on extreme weather hazards, the template also can be used to address additional threats, including cyber and physical attacks and seismic events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Planning Bias: Planning as a Source of Sampling Bias

Many data-driven planning methods are trained on data generated by planners. It is well known that many statistical learning methods are sensitive to sampling bias, and yet there has been little or no attention to planning as a sampling method and its role in introducing sampling bias into planner-generated training data. Recently, it has been demonstrated that A**,* in the presence of problems with variable heuristic error, prefers some solutions over other equally cost-optimal solutions. But, as we discuss in this paper, mitigation may not be as simple as resolving arbitrary tie-breaking by sampling from ties uniformly at random. In this paper, we formalize an intuition of planning bias. We focus on problems which output a single solution. Diverse planning only complicates the problem by generalizing it to bias in the set of sets; we show how it is subject to bias in the single solution. We make some useful observations about deterministic algorithms in contrast to non-deterministic algorithms. We explain how information entropy may be a good way to measure planning bias, and discuss some issues in evaluating practical approaches to measurement. We address the intuition that uniform random tiebreaking should mitigate bias; and sketch a novel approach to constructing an appropriate random distribution for duplicate detection during forward search for unbiased A*. Finally, we suggest directions for future work.

Planning Scheduling Algorithms↗

Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan

A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.

Klus, W. L.↗

An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

The authors describe a two-phase approach to allotment planning suitable for use in planning the fixed satellite service at the 1988 Space World Administrative radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common to groups of administrations and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the conference. Computer software has been developed to implement the concepts, and the logic and rationale for identifying predetermined arc segments is discussed. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

Miller, Edward F.↗

Application of heuristic satellite plan synthesis algorithms to requirements of the WARC-88 allotment plan

Creation of an Allotment Plan for the Fixed Satellite Service at the 1988 Space World Administrative Radio Conference (WARC) represented a complex satellite plan synthesis problem, involving a large number of planned and existing systems. Solutions to this problem at WARC-88 required the use of both automated and manual procedures to develop an acceptable set of system positions. Development of an Allotment Plan may also be attempted through solution of an optimization problem, known as the Satellite Location Problem (SLP). Three automated heuristic procedures, developed specifically to solve SLP, are presented. The heuristics are then applied to two specific WARC-88 scenarios. Solutions resulting from the fully automated heuristics are then compared with solutions obtained at WARC-88 through a combination of both automated and manual planning efforts.

Heyward, Ann O.↗

Application of heuristic satellite plan synthesis algorithms to requirements of the WARC-88 allotment plan

Creation of an Allotment Plan for the Fixed Satellite Service at the 1988 Space World Administrative Radio Conference (WARC) represented a complex satellite plan synthesis problem, involving a large number of planned and existing systems. Solutions to this problem at WARC-88 required the use of both automated and manual procedures to develop an acceptable set of system positions. Development of an Allotment Plan may also be attempted through solution of an optimization problem, known as the Satellite Location Problem (SLP). Three automated heuristic procedures, developed specifically to solve SLP, are presented. The heuristics are then applied to two specific WARC-88 scenarios. Solutions resulting from the fully automated heuristics are then compared with solutions obtained at WARC-88 through a combination of both automated and manual planning efforts.

Heyward, Ann O.↗

The planning coordinator: A design architecture for autonomous error recovery and on-line planning of intelligent tasks

Developing a robust, task level, error recovery and on-line planning architecture is an open research area. There is previously published work on both error recovery and on-line planning; however, none incorporates error recovery and on-line planning into one integrated platform. The integration of these two functionalities requires an architecture that possesses the following characteristics. The architecture must provide for the inclusion of new information without the destruction of existing information. The architecture must provide for the relating of pieces of information, old and new, to one another in a non-trivial rather than trivial manner (e.g., object one is related to object two under the following constraints, versus, yes, they are related; no, they are not related). Finally, the architecture must be not only a stand alone architecture, but also one that can be easily integrated as a supplement to some existing architecture. This thesis proposal addresses architectural development. Its intent is to integrate error recovery and on-line planning onto a single, integrated, multi-processor platform. This intelligent x-autonomous platform, called the Planning Coordinator, will be used initially to supplement existing x-autonomous systems and eventually replace them.

Farah, Jeffrey J.↗

Alternatives to Re-Planning: Methods for Plan Re-Evaluation at Runtime

Current planning algorithms have difficulty handling the complexity that is due to an increase in domain uncertainty, and especially in the case of multi-dimensional continuous spaces. Therefore, they produce plans that do not take into account numerous situations that can occur at runtime, such as faults or other changes in the planning domain itself. Thus there is a gap between the plan generation and the reality experienced at runtime. Here we present two methods that allow the plan conditionals to be revised w.r.t. uncertainty on the system as estimated at runtime.

Benazera, Emmanuel↗

The National Transmission Planning Study: Chapter 2: Long-Term U.S. Transmission Planning Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Communications Plan for the Radiochemical Processing Laboratory Life Extension Plan

The Radiochemical Processing Laboratory Life Extension Plan (RPL-ELP) is a collection of independent projects that enable the life extensions of the Radiochemical Processing Laboratory to provide continuous, safe, and secure research operations in support of Department of Energy missions. The ELP includes facility infrastructure upgrades, laboratory and equipment upgrades, and increased research capacity through conversion of existing spaces to the current Pacific Northwest National Laboratory (PNNL) standards. This communications plan is a living document that outlines the goals, target audiences and objectives, key messages, communications opportunities, and tactics for those communications products. This plan will help to make sure communications are coordinated and consistent. Periodically, PNNL will review the communications plan to make sure it addresses current needs of the RPL-ELP.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Community Planning for Solar: Conducting Focus Groups for Solar Planning

This guide is designed to assist community officials, volunteers, and regional planning agency staff in conducting preliminary community meetings to learn about attitudes towards solar energy in your community. The guide will provide the key steps, timelines, facilitators' guide, and tips for hosting successful focus groups. Focus groups are meetings with a small group that represent a diversity of perspectives in your community. These differ from an open meeting in that focus groups include very specific questions that are prepared in advance, and all participants are given time to respond and understand various perspectives about solar energy. The guide concludes with a suggested template for reporting the results of your focus group or community meeting to your community more broadly. Holding community focus groups is part of assessing community preferences, as part of the Community Planning for Solar toolkit (ag.umass.edu/solarplanning). This guide is designed to help municipalities in Massachusetts and other states proactively plan for solar development in their communities. For more information, visit the UMass Clean Energy Extension (CEE) website (ag.umass.edu/clean-energy).

14 SOLAR ENERGY↗

Improved Decarbonization Planning through Climate Resiliency Modeling

California has set ambitious decarbonization goals concerning both emissions and the portion of energy generated by renewable resources. However, climate change poses considerable uncertainties. Variation in load is driven both by the level of electrification as well as the impact of climate change on weather. Further, climate change stands to make weather more variable, impacting not just load but generation from renewable resources. In this paper, we approach the issue of the impacts of climate change on decarbonization planning from two perspectives. First, we look at the range of decarbonization pathways through 8 pathways that account for differences in socioeconomic development, global emissions, and warming. Second, we develop a more robust way of ensuring the reliability of energy resources planning than the commonly used planning reserve margin. We show that the proposed method can save between 6 and 14 billion dollars in investment and maintenance costs and outline critical policy implications concerning the reliance of power plants for satisfying planning reliability requirements, including the potential retirement of dozens of peaker power plants.

Anderson, Osten P.↗