Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance improvement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Comparative Study of Redox Mediators for Improved Performance of Li-Oxygen Batteries.

Redox meditators (RMs) are soluble catalysts located in an electrolyte that can improve the energy efficiency (reduced overpotential) and cyclability of Li-oxygen (Li-O-2) batteries. In this work, 20 RMs within a Li-O-2 system with dimethyl sulfoxide and tetraethylene glycol dimethyl ether electrolytes are studied and their electrochemical features such as redox potential, the separation of cathodic and anodic peaks, and their current intensities are measured using cyclic voltammetry (CV) experiments. Six RMs are selected as "primary" choices based on their electrochemical performance, and stability tests are then performed to examine their electrochemical responses after consecutive cycles. Moreover, galvanostatic cycling tests are performed within a Li-O-2 battery system assembled with selected six RMs for real case consistency investigations. It is found that results from CV to galvanostatic cycling tests are consistent for halides and organometallic RMs, where the former exhibit much higher stability. However, the organic RMs show high reversibility in CV but low in battery cycling results. Density functional theory calculations are carried out to gain more understanding of the stability and redox potentials of the RMs. This study provides comparative information to select the most reliable RMs for Li-O-2 batteries along with new fundamental understanding of their electrochemical activity and stability.

cyclic voltammetry↗

Improved performance in vertical GaN Schottky diode assisted by AlGaN tunneling barrier

In a vertical GaN Schottky barrier diode, the free electron concentration n in the 6-μm-thick drift layer was found to greatly impact the diode reverse leakage current, which increased from 2.1 × 10{sup −7} A to 3.9 × 10{sup −4} A as n increased from 7.5 × 10{sup 14 }cm{sup −3} to 6.3 × 10{sup 15 }cm{sup −3} at a reverse bias of 100 V. By capping the drift layer with an ultrathin 5-nm graded AlGaN layer, reverse leakage was reduced by more than three orders of magnitude with the same n in the drift layer. We attribute this to the increased Schottky barrier height with the AlGaN at the surface. Meanwhile, the polarization field within the graded AlGaN effectively shortened the depletion depth, which led to the formation of tunneling current at a relatively small forward bias. The turn-on voltage in the vertical Schottky diodes was reduced from 0.77 V to 0.67 V—an advantage in reducing conduction loss in power switching applications.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Performance improvements of wavelength-shifting-fiber neutron detectors using high-resolution positioning algorithms

On the basis of FluoroBancroft linear-algebraic method [S.B. Andersson, Opt. Exp. 16, 18714 (2008)] three highly-resolved positioning methods were proposed for wavelength-shifting fiber (WLSF) neutron detectors. Using a Gaussian or exponential-decay light-response function (LRF), the non-linear relation of photon-number profiles vs. x-pixels was linearized and neutron positions were determined. The proposed algorithms give an average 0.03-0.08 pixel position error, much smaller than that (0.29 pixel) from a traditional maximum photon algorithm (MPA). The new algorithms result in better detector uniformity, less position misassignment (ghosting), better spatial resolution, and an equivalent or better instrument resolution in powder diffraction than the MPA. Moreover, these characters will facilitate broader applications of WLSF detectors at time-of-flight neutron powder diffraction beamlines, including single-crystal diffraction and texture analysis.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Vapor-Fed Cathode Microbial Electrolysis Cells with Closely Spaced Electrodes Enables Greatly Improved Performance

Hydrogen can be electrochemically produced in microbial electrolysis cells (MECs) by current generated from bacterial anodes with a small added voltage. MECs typically use a liquid catholyte containing a buffer or salts. However, anions in these catholytes result in charge being balanced predominantly by ions other than hydroxide or protons, leading to anode acidification. To enhance only hydroxide ion transport to the anode, we developed a novel vapor-fed MEC configuration lacking a catholyte with closely spaced electrodes and an anion exchange membrane to limit the acidification. This MEC design produced a record-high sustained current density of 43.1 ± 0.6 A/m 2 and a H 2 production rate of 72 ± 2 LH 2 /L-d (cell voltage of 0.79 ± 0.00 V). There was minimal impact on MEC performance of increased acetate concentrations, solution conductivity, or anolyte buffer capacity at applied voltages up to 1.1 V, as shown by a nearly constant internal resistance of only 6.8 ± 0.3 mΩ m 2 . At applied external voltages >1.1 V, the buffer capacity impacted performance, with current densities increasing from 28.5 ± 0.6 A/m 2 (20 mM phosphate buffer solution (PBS)) to 51 ± 1 A/m 2 (100 mM PBS). Furthermore, these results show that a vapor-fed MEC can produce higher and more stable performance than liquid-fed cathodes by enhancing transport of hydroxide ions to the anode.

anion exchange membrane↗

Policy, Permit, Perform: Using City Benchmarking Data and Building Construction Permit History to Identify Energy Performance Improvements

The City of Portland (City) and Multnomah County 2015 Climate Action Plan targets a 40 percent reduction in carbon emissions below 1990 levels by 2030. To reach this goal, the plan includes a key objective to reduce the total energy use of existing buildings by 25 percent. Buildings are responsible for one-half of carbon emissions in Portland, Oregon, U.S., and improving their performance is critical to achieving the City’s climate goals. As part of its climate action planning, the City passed an ordinance on April 22, 2015, requiring commercial buildings 20,000 ft2 and larger to benchmark and disclose annual energy performance metrics through ENERGY STAR® Portfolio Manager® (ESPM), including greenhouse gas emissions, building energy use intensity (EUI) and ENERGY STAR scores. Twenty-five cities in the U.S. have adopted similar policies requiring energy benchmarking. These policies are generating a treasure trove of data about the drivers of building performance, but practitioners are only beginning to link benchmarking data to other datasets to produce actionable insight into improving building performance. In 2016, the City received a financial assistance award from the U.S. Department of Energy (DOE) through the Cities Leading through Energy Analysis and Planning project (Award Number DE-0007737). Portland’s project evaluated the application of the DOE Building Energy Asset Score Tool and rating system developed by Pacific Northwest National Laboratory (PNNL) to commercial buildings that report to the City. The City used building construction permit history to develop Asset Scores for a set of office buildings that reported energy performance for 2015 – the first year the City mandated energy benchmarking and reporting for commercial buildings 50,000 ft2 and larger. The primary project objective was to link energy benchmarking data and commercial building permit data to analyze commercial buildings systems that present the best, specific opportunities to improve energy performance. Integrating these datasets from two City departments, the Bureau of Development Services and the Bureau of Planning and Sustainability, could expand Portland’s use of analytics to inform climate policy decisions and strategic targeting of financial incentives for building owners and managers who are best positioned to improve the performance of their buildings. The project began with the commercial benchmarking data received for 340 commercial buildings that submitted calendar year 2015 energy reports. The City retained Research Into Action and Energy 350 (RIA team) to evaluate this self-reported benchmarking data. Based on a survey of 53 building managers, the RIA team found that most respondents used the City’s compliance tools, including a How-to Guide and Help Desk, and found access to utility data to be straightforward. However, almost one-third of the respondents encountered challenges when estimating the gross floor area (GFA), and some experienced confusion regarding the input of property use types and details into ESPM. Based on the RIA team’s recommendations, the City refined its How-to Guide, created online answers to frequently asked questions, and hosted office hour sessions to help building managers accurately characterize their building’s physical characteristics and operations in ESPM. Concurrently with the RIA team’s evaluation, the City worked with PNNL to estimate DOE Asset Score Preview (Preview) scores for 181 of the 340 commercial buildings that submitted ESPM reports to the City. Asset Score Tool is a web-based tool developed by PNNL for DOE to evaluate and rate the as-built energy efficiency of a building. Asset Score Tool’s full analysis capability runs a detailed energy model based on building geometry, age, envelope, lighting and mechanical systems using standard operating assumptions to give the building a score, similar to a miles per gallon rating for a car. Preview, a simplified deployment of the full Asset Score Tool, provides a preliminary score range using only seven data points, six of which are readily available in the ESPM benchmarking data. Analysis of the combined Preview scores and the operational ESPM scores identified buildings with a high potential for energy improvements through either retro-commissioning and retuning of existing operations or capital investments into building systems. The City contracted Whole Building Solutions (WBS) to mine building permit history and develop full Asset Scores for a subset of 26 office buildings that were eligible for both ENERGY STAR scores and Asset Scores. WBS researched permits and building plans to identify mechanical, lighting and envelope systems and other building characteristics necessary to complete Asset Scores. This historical data was recorded using the web-based Asset Score Tool, which evaluates the as designed energy efficiency of existing buildings. Much of this City information was available online after 2010; however, WBS had to search through microfiche files and the City’s database to obtain permit and plan history prior to 2010. Although building geometry, mechanical system type and basic envelope information was consistently identifiable, WBS found permit data gaps that prevented complete and accurate Asset Scores for most of the office buildings. If the City decides to develop Asset Scores based on building permit information in the future, WBS recommended requiring lighting plans, control diagrams and as-built drawings that reflect how the buildings are actually constructed. In addition, WBS recommended uploading plans and permits from microfiche storage into a more comprehensive, searchable database consistent with the City’s current online permit information. To identify the actual lighting types, WBS and City staff conducted site visits of all 26 office buildings. As part of managing the flow of ESPM and Asset Score data for the project, Earth Advantage, a sub-recipient of the Cities-LEAP award, created a DOE Standard Energy Efficiency Data (SEED) (USDOE 2018) instance for the City and used Asset Score’s Application Programming Interface (API) (Asset Score 2018) capabilities to develop two new features in the SEED Platform™: (1) automated Asset Score Preview ranges calculated based on benchmarking data and the City’s estimate of number of building floors; and (2) storage of full Asset Score information. Leveraging the construction permit history and site visit information for the 26 office buildings, The Cadmus Group (Cadmus) analyzed benchmarking data and Asset Score information to identify opportunities and drivers to improve performance. Correlation and regression analysis of the combined dataset was completed to determine whether building operations or specific systems – mechanical, lighting or envelope – present the best opportunities to improve energy performance. The central outcome of this project was Cadmus’ detailed analysis of the richer dataset that was created by combining the City of Portland’s commercial building permit activity and building-specific energy performance information based on metrics from ESPM and Asset Score Tool. Some of their findings collaborate with well-known facts, such as buildings with less efficient lighting systems are good targets for efficiency improvements through lighting upgrades. This analysis also helped identify that individual heating, ventilation, and air conditioning (HVAC) equipment efficiency does not necessarily correlate with building performance. However, overall HVAC system performance, as measured with the Total System Performance Ratio (TSPR) metric, is a better indicator of building performance (Goel et al. 2014). As a metric, TSPR considers whole system performance that includes equipment efficiency and system controls, such as resets for static pressure and chilled water setpoints, which can be more effective and financially feasible options for improving building performance. Given the high cost associated with envelope retrofits, opportunities to upgrade envelope insulation are likely to be limited. However, buildings with single-pane and non-thermal break windows are good candidates for window replacements, such as upgrading to double-pane windows with thermal breaks. This research project determined that developing Asset Scores based on site visits is preferable to mining City building permit data. In addition, the use of benchmarking data to develop Asset Score Preview Scores is recommended as a first step in engaging building managers to develop full Asset Scores. Asset Score Tool outputs can help building managers quickly identify opportunities for improvement and then work with the utility incentive administrator and energy service providers to develop their retrofit plan. Where full Asset Scores are available, analysis using a quadrant matrix with ENERGY STAR scores is recommended to identify buildings that present the best opportunities for operational-behavioral improvements versus ones with opportunities for upgrades to physical building systems. This workflow and the tools will help cities, utility incentive administrators, building portfolio managers and energy service providers develop energy programs and strategies for screening and analysis of buildings with the greatest energy savings potential. This report describes the project approach and research results to inform future coordination of ESPM and Asset Score data, including the use of benchmarking data to generate Preview scores. Given better awareness of energy performance, building managers can make more informed decisions to reduce energy consumption and carbon emissions. With cities, states and jurisdictions adopting benchmarking and auditing ordinances, there are substantial amounts of data submitted to cities that could be used to inform investments in energy efficiency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reduced Recombination and Improved Performance of CdSe/CdTe Solar Cells due to Cu Migration Induced by Light Soaking

The performance of CdTe solar cells has advanced impressively in recent years with the incorporation of Se. Instabilities associated with light soaking and copper reorganization have been extensively examined for the previous generation of CdS/CdTe solar cells, but instabilities in Cu-doped Se-alloyed CdTe devices remain relatively unexplored. In this work, we fabricated a range of CdSe/CdTe solar cells by sputtering CdSe layers with thicknesses of 100, 120, 150, 180, and 200 nm on transparent oxide-coated glass and then depositing CdTe by close-spaced sublimation. After CdCl 2 annealing, Cu-doping, and back metal deposition, a variety of analyses were performed both before and after light soaking to understand the changes in device performance. The device efficiency was degraded with light soaking in most cases, but devices fabricated with a CdSe layer thickness of 120 nm showed reasonably good efficiency initially (13.5%) and a dramatic improvement with light soaking (16.5%). Here, the efficiency improvement is examined within the context of Cu ion reorganization that is well known for CdS/CdTe devices. Low-temperature photoluminescence data and V oc versus temperature measurements indicate a reduction in nonradiative recombination due to the passivation of defects and defect complexes in the graded CdSe x Te 1–x layer.

CdSexTe1−x↗

Performance Improvements to the Neutron Imaging System at the National Ignition Facility

A team headed by LANL and including many members from LLNL and NSTec LO and NSTec LAO fielded a neutron imaging system (NIS) at the National Ignition Facility at the start of 2011. The NIS consists of a pinhole array that is located 32.5 cm from the source and that creates an image of the source in a segmented scintillator 28 m from the source. The scintillator is viewed by two gated, optical imaging systems: one that is fiber coupled, and one that is lens coupled. While there are a number of other pieces to the system related to pinhole alignment, collimation, shielding and data acquisition, those pieces are discussed elsewhere and are not relevant here. The system is operational and has successfully obtained data on more that ten imaging shots. This remainder of this whitepaper is divided in five main sections. In Section II, we identify three critical areas of improvement that we believe should be pursued to improve the performance of the system for future experiments: spatial resolution, temporal response and signal-to-noise ratio. In Section III, we discuss technologies that could be used to improve these critical performance areas. In Section IV, we describe a path to evolve the current system to achieve improved performance with minimal impact on the ability of the system to operate on shots. In Section V, we discuss the abilities, scope and timescales of the current teams and the Commissariat energie atomique (CEA). In Section VI, we summarize and make specific recommendations for collaboration on improvements to the NIS.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CF6 performance improvement

Potential CF6 engine performance improvements directed at reduced fuel consumption were identified and screened relative to airline acceptability and are reviewed. The screening process developed to provide evaluations of fuel savings and economic factors including return on investment and direct operating cost is described. In addition, assessments of development risk and production potential are made. Several promising concepts selected for full-scale development based on a ranking involving these factors are discussed.

Lennard, D. J.↗

Performance Improvements of the Griffin Solvers in FY24

The Griffin code is a MOOSE-based reactor physics application jointly developed by Idaho National Laboratory and Argonne National Laboratory under the Department of Energy Office of Nuclear Energy Nuclear Energy Advanced Modeling and Simulation Program. This fiscal year, we have made significant efforts to improve the performance of transport solver options and cross-section generation for the efficient use of Griffin in advanced reactor applications. For the HFEM-PN solver, the residual evaluations of HFEM kernels were optimized by utilizing the pre- computed averaged cross sections for individual elements. Numerical integration involving the evaluation of basis functions at quadrature points was bypassed by facilitating precomputed element mass matrices for response matrices. Red-black iterations were improved by introducing a new generalized minimum residual based solver. The memory usage of response matrix storage was significantly reduced by applying basis function rotations on interfaces and calculating volumetric odd-parity moments on the fly. Additionally, the adjoint flux and transient calculation capabilities of the HFEM-PN solver were successfully implemented and verified using the TWIGL benchmark problem. For the DFEM-SN solver, memory footprint and computation time were significantly reduced by not treating angular flux vectors as the MOOSE nonlinear system vectors. Specifically for IQS, scalar adjoint weighting was introduced to further eliminate angular adjoint flux storage in the MOOSE auxiliary system. It was demonstrated through the three-dimensional Advanced Burner Test Reactor core problem that the memory usage for transient calculations with the IQS method was reduced by over 7.5× compared to before the optimizations. For the self-shielding application programming interface, a new double-heterogeneity treatment method, named the Bell Function-Based Analytic Two-Region Slowing Down Method, was developed to efficiently flux-volume homogenize TRISO particles with the matrix. Additionally, optimizations were made to hyper- fine group (HFG) slowing down calculations by pretabulating collision probability coefficients and grouping isotopes, significantly reducing the computational time for calculating scattering sources per HFG. Lastly, the pin power reconstruction module was extended to account for temporal behavior in a microreactor analysis problem, specifically for a control drum transient. Verification tests for each of these improvements demonstrated significant performance enhancements and memory reduction.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Summary of VERA Core Simulator Performance Improvements

This report describes the performance improvements made to the VERA Core Simulator (VERA CS) during FY2016. At the beginning of the year, a timing study was performed to identify areas of the code where the run-times could be improved. This study identified six broad areas for improvement: • Cross section lookup and CMFD stabilization, • CTF parallel partitioning, • MOC methodology, • Subgroup methodology, • MOC parallel partitioning, and • CMFD Krylov solution techniques. The goal of this work was to reduce the VERA-CS run-times so a complete cycle depletion could be run with 1,000 cores overnight (i.e., the “1,000 core depletion” criterion). This goal was set by our industry partners so they could achieve reasonable turnaround on medium-sized computer clusters. The results presented in this report show a code speed-up by a factor of 5, which successfully satisfies the goal set by industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Space shuttle external tank performance improvements: The challenge

The external tank (ET) has been actively involved in performance improvements since the inception of the space shuttle program, primarily by weight savings. Weight savings were realized on the first block of flight articles (standard weight tank). With a need for further performance improvements, the ET Program Office was requested to develop a program to reduce tank weight an additional 6000 lb and schedule delivery of the first lightweight ET (LWT) for June 1982. The weight savings program was accomplished by: (1) a unique approach to use of factors of safety; (2) design optimization; and (3) redesign of structures with large margins of safety which resulted in an actual weight savings of 7294 lb. Additional studies have identified further weight savings which are to be implemented at appropriate times in production flow. Examples are an improved thermal protection system for the LH2 tank aft dome and reduction of slosh baffles in the LO2 tank based on flight data. All performance improvements were compared and selected based on non-recurring and recurring cost and technical risk.

Coldwater, H. R.↗