Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Results for the Subjective Habitability Acceptability Questionnaire From HERA C5 and C6

BACKGROUND The impact of habitability on psychological and performance outcomes is recognized as an important factor in habitat and vehicle design—especially as missions increase in length. Formal evaluation of habitability’s impact is possible using the Spaceflight Habitability Acceptability Questionnaire (SHAQ), which was psychometrically validated by Roma et al. in 2022 [1]. The SHAQ survey systematically quantifies the relationships between habitat areas (e.g., bedroom, kitchen, hygiene area, office, etc.) and behavioral health and performance (BHP) outcomes (i.e., individual and team performance, mood, stress, sleep, social interaction), and considers the moderating effects of key habitability aspects (i.e., privacy, control, convenience, efficiency, comfort, social density) on that relationship. METHOD Respondents were HERA participants from Campaign 5 and 6 (n = 32). Data from three environments were used in our SHAQ analyses: SHAQ in HERA (in-mission), SHAQ at Home (pre-mission), and SHAQ in Hotel (pre- and post-mission for C6, just pre-mission for C5). For each habitat area, respondents are asked how that area layout impacts six BHP outcomes on a 201-point visual analog scale with the anchors: impairs, has no effect, and facilitates. They also had the option to respond “Not Applicable”. Follow up questions asked why six key habitability aspects (e.g., privacy) influenced the way the habitat area affected a given outcome. Participants indicated whether a habitat area’s habitability aspects were inadequate (low score) to adequate (midpoint) to ideal (high score), using a 201-point visual analog scale as well but were binned to a 7-point scale for analyses. RESULTS AND CONCLUSION When comparing across environments, ratings of BHP outcomes were worse in HERA compared to home and pre-mission hotel, but rebounded for the post-mission hotel such that post-mission hotel rating were often higher than all previous ratings. Within HERA, ratings of how a habitat area impacted an outcome skewed towards facilitation with communal areas (i.e., galley and office) rated most facilitating. The follow up questions about why six key aspects related to habitability moderated outcomes indicated that most habitat areas were rated as having “adequate” habitability characteristics. Privacy was the only moderator with average scores below adequate for all habitat areas. The office had the most moderators scoring above adequate for all habitat areas. Ratings indicated small to moderate effects of layouts on BHP outcomes: with facilitating layouts averaging between 4 and 5, and impairing layouts averaging between 2 and 4. The sleeping module layout facilitated sleep, with ratings indicating adequate comfort but inadequate privacy. The galley layout facilitated social interaction and mood, with ratings indicating adequate efficiency and convenience. The office layout facilitated social interaction, team and individual performance, with ratings similarly indicating adequate efficiency and convenience. The hygiene module worsened individual performance, mood and stress, with ratings indicating less than adequate privacy and social density. Our findings suggest there is value in having dedicated team and individual spaces. REFERENCES [1] Roma, P. G., Landon, L.B., Spencer, C. A., Whitmire, A. M., & Williams, T. J. (2022). SHAQ: Development and Validation. Human Factors: Special Issue on Spaceflight, 65(6), 1074-1104. ACKNOWLEDGEMENTS This project was funded by the NASA Human Research Program directed task Human Factors and Behavioral Performance in HERA (PI = S. Bell) to the BHP Lab. KBR Inc. and JES Tech authors were supported by KBR’s Human Health and Performance Contract NNJ15HK11B with NASA.

behavioral health↗

Aerodynamic and acoustic performance of a contracting cowl high throat Mach number inlet installed on NASA Quiet Engine 'C'

The purpose of this experimental program was to evaluate the approach and takeoff performance of a contracting cowl variable geometry design inlet installed on a high-bypass-ratio turbofan engine. The design was finalized after consideration of aerodynamic, acoustic, and mechanical factors which would lead to a viable flight-worthy inlet concept. The aerodynamic results are presented in terms of inlet recovery and distortion parameter as functions of throat Mach number, and acoustic results in terms of Perceived Noise Level. The contracting cowl high throat Mach number inlet is shown to be an attractive means to reduce forward radiated noise from a high bypass ratio turbofan engine.

Bloomer, H. E.↗

Aerodynamic and acoustic performance of a contracting cowl high throat Mach number inlet installed on NASA quiet engine C

The approach and takeoff performance was evaluated of a contracting cowl variable geometry design inlet installed on a high-bypass-ratio turbofan engine. The design was finalized after consideration of aerodynamic, acoustic, and mechanical factors which would lead to a viable flight worthy concept. The aerodynamic results are presented in terms of inlet recovery and distortion parameter as functions of throat Mach number, and acoustic results in terms of Perceived Noise Level. The contracting cowl high throat Mach number inlet is shown to be an attractive means to reduce forward radiated noise from a high bypass ratio turbofan engine.

Blommer, H. E.↗

Summary document of tasks performed on the Shuttle-C/NLS contract

During FY92, USBI performed many programmatic related tasks. These programmatic tasks have been categorized as follows: (1) acquisition; (2) project engineering/program planning; and (3) cost. The reports associated with these tasks follow in paragraphs 1.1.1 through 1.3.3. Proceeding each task report is a brief description of the contents contained within.

Source record↗

SMEX-Lite Modular Solar Array Architecture

For the most part, Goddard solar arrays have been custom designs that are unique to each mission. The solar panel design has been frozen prior to issuing an RFP for their procurement. There has typically been 6-9 months between RFP release and contract award, followed by an additional 24 months for performance of the contract. For Small Explorer (SMEX) missions, with three years between mission definition and launch, this has been a significant problem. The SMEX solar panels have been sufficiently small that the contract performance period has been reduced to 12-15 months. The bulk of this time is used up in the final design definition and fabrication of flight solar cell assemblies. Even so, it has been virtually impossible to have the spacecraft design at a level of maturity sufficient to freeze the solar panel geometry and release the RFP in time to avoid schedule problems with integrating the solar panels to the spacecraft. With that in mind, the SMEX-Lite project team developed a modular architecture for the assembly of solar arrays to greatly reduce the cost and schedule associated with the development of a mission- specific solar array. In the modular architecture, solar cells are fabricated onto small substrate panels. This modular panel (approximately 8.5" x 17" in this case) becomes the building block for constructing solar arrays for multiple missions with varying power requirements and geometrical arrangements. The mechanical framework that holds these modules together as a solar array is the only mission-unique design, changing in size and shape as required for each mission. There are several advantages to this approach. First, the typical solar array development cycle requires a mission unique design, procurement, and qualification including a custom qualification panel. With the modular architecture, a single qualification of the SMEX-Lite modules and the associated mechanical framework in a typical configuration provided a qualification by similarity to multiple missions. It then becomes possible to procure solar array modules in advance of mission definition and respond quickly and inexpensively to a selected mission's unique requirements. The solar array modular architecture allows the procurement of solar array modules before the array geometry has been frozen. This reduces the effect of procurement lead-time on the mission integration and test flow by as much as 50%. Second, by spreading the non-recurring costs over multiple missions, the cost per unit area is also reduced. In the case of the SMEX-Lite procurement, this reduction was by about one third of the cost per unit area compared to previous SMEX mission-unique procurements. Third, the modular architecture greatly facilitates the infusion of new solar cell technologies into flight programs as these technologies become available. New solar cell technologies need only be fabricated onto a standard-sized module to be incorporated into the next available mission. The modular solar array can be flown in a mixed configuration with some new and some standard cell technologies. Since each module has its own wiring terminals, the array can be arranged as desired electrically with little impact to cost and schedule. The solar array modular architecture does impose some additional constraints on systems and subsystem engineers. First, they must work with discrete solar array modules rather than size the array to fit exactly within an available envelope. The array area is constrained to an integer multiple of the module area. Second, the modular design is optimized for space radiation and thermal environments not greatly different from a typical SMEX LEO environment. For example, a mission with a highly elliptical orbit (e.g., Polar, SMEX/FAST) would require thicker coverglasses to protect the solar cells from the more intense radiation environment.

Lyons, John↗

Nuclear and ionic charge distribution experiment on ISEE-1 and ISEE-3

The experimental work carried out under this contract is a continuation of that originally performed under Contracts NAS5-20062 and NAS5-26739. The data analyzed are from the Max-Planck Institut/Univ. of Maryland experiment on ISEE-1 and ISEE-3. Each spacecraft experiment consists of a nearly identical set of three sensors (designated the ULECA, ULEWAT, and ULEZEQ sensors) designed to measure the energy spectra and composition of suprathermal and energetic ions over a broad energy range (less than 3 keV/e to more than 20 MeV/nucleon). Since the launch of ISEE's 2 and 3, the MPI/Univ. of Maryland experiments have generally performed as expected except for a partial failure of the ULEWAT sensor on ISEE-1 in August 1978. A number of scientific studies have either been completed, initiated or are at various stages of completion. A brief summary of Primary Results is given, followed by a more detailed summary of the major accomplishments at the Univ. of Maryland.

Gloeckler, G.↗

How to compete for NASA contracts

Various studies and NASA experience have found that business concerns can provide a vital and significant impetus to technological innovation, not only in the fields of space and aeronautics, but also in national technological growth. NASA personnel are determined to foster the development of small business capabilities in technical areas that will support future projects and establish a small business base for the development and production of flight hardware for future missions. The solicitation process for Federal contracts has grown quite complex over the years. Where possible, we continue to try to simplify and streamline procedures for obtaining and performing these contracts. This booklet is designed to help understand NASA solicitations, find the information needed in deciding whether to respond, and improve chances for success. The first section of this booklet will answer general questions concerning the various types of NASA solicitations. Your specific questions on how to prepare bids will be answered in the second section, which is followed by a third section on the unique features of construction contracting. A fourth section describes how to submit technical and cost proposals for the negotiated procurement process. Some tips or suggestions, called DO's and DONT's, are placed at the end of the second, third, and fourth sections. Then, in the fifth section, ways to seek business as a subcontractor are identified.

Source record↗

SRM Internal Flow Test and Computational Fluid Dynamic Analysis: Major Task Summaries - Volume 1

During the four year period of performance for NASA contract, NASB-39095, ERC has performed a wide variety of tasks to support the design and continued development of new and existing solid rocket motors and the resolution of operational problems associated with existing solid rocket motor's at NASA MSFC. This report summarizes the support provided to NASA MSFC during the contractual period of performance. The report is divided into three main sections. The first section presents summaries for the major tasks performed. These tasks are grouped into three major categories: full scale motor analysis, subscale motor analysis and cold flow analysis. The second section includes summaries describing the computational fluid dynamics (CFD) tasks performed. The third section, the appendices of the report, presents detailed descriptions of the analysis efforts as well as published papers, memoranda and final reports associated with specific tasks. These appendices are referenced in the summaries. The subsection numbers for the three sections correspond to the same topics for direct cross referencing.

Whitesides, R. Harold↗

Parabolic aircraft solidification experiments

A number of solidification experiments have been utilized throughout the Materials Processing in Space Program to provide an experimental environment which minimizes variables in solidification experiments. Two techniques of interest are directional solidification and isothermal casting. Because of the wide-spread use of these experimental techniques in space-based research, several MSAD experiments have been manifested for space flight. In addition to the microstructural analysis for interpretation of the experimental results from previous work with parabolic flights, it has become apparent that a better understanding of the phenomena occurring during solidification can be better understood if direct visualization of the solidification interface were possible. Our university has performed in several experimental studies such as this in recent years. The most recent was in visualizing the effect of convective flow phenomena on the KC-135 and prior to that were several successive contracts to perform directional solidification and isothermal casting experiments on the KC-135. Included in this work was the modification and utilization of the Convective Flow Analyzer (CFA), the Aircraft Isothermal Casting Furnace (ICF), and the Three-Zone Directional Solidification Furnace. These studies have contributed heavily to the mission of the Microgravity Science and Applications' Materials Science Program.

Workman, Gary L.↗

SHared Aperture Diffractive Optical Elements

All prototypes that can be delivered have been delivered and the quality of the 5 plex copies is good in spot aberration and size, in Bragg angle and in crosstalk but lacks required efficiency because of excessive scatter recorded in the master. The final 4 months of this contract were performed when conditions in the lab were too harsh to complete the extremely long exposures required while maintaining sufficient thermal stability. An improved master HOE will be shot and delivered when the weather is better. It will be a post contract activity at no extra charge to NASA made necessary by bad weather.

Rallison, Richard D.↗

Improving the Agency's Software Acquisition Capability

External development of software has oftc n led to unsatisfactory results and great frustration for the assurE 7ce community. Contracts frequently omit critical assuranc 4 processes or the right to oversee software development activitie: At a time when NASA depends more and more on software to in plement critical system functions, combination of three factors ex; cerbate this problem: I ) the ever-increasing trend to acquire rather than develop software in-house, 2) the trend toward performance based contracts, and 3) acquisition vehicles that only state softwar 2 requirements while leaving development standards and assur! ince methodologies up to the contractor. We propose to identify specific methods at d tools that NASA projects can use to mitigate the adverse el ects of the three problems. TWO broad classes of methoddt ~ols will be explored. The first will be those that provide NASA p ojects with insight and oversight into contractors' activities. The st cond will be those that help projects objectively assess, and thus i nprwe, their software acquisition capability. Of particular interest is the Software Engineering Institute's (SEI) Software Acqt isition Capability Maturity Model (SA-CMMO).

Hankinson, Allen↗

Inflight replanning for diversions

Current procedures for handling flight plan diversions can require too much of the crew's resources. This increases workload and may compromise safety and cause delays in modifying the flight plan. The goal of NASA Langley Research Center's Diverter research program is to develop guidelines for a prototype pilot decision aid for diversions that will reduce cognitive workload, improve safety, increase capacity and traffic flow, and increase aircraft efficiency. The Diverter program has been partitioned into five phases, the first three of which were performed under contract by Lockheed Aeronautical Systems Company, Marietta, GA. In the first two phases, which have been completed, the system requirements and desired functions were defined and a prototype decision-making aid was implemented and demonstrated on a workstation. In phase three, which is currently under way, the pilot/vehicle interface is being defined and the capability of the prototype is being improved. In the last two phases, which will be performed at NASA Langley Research Center, the interface will be implemented, tied into the prototype aiding software, and installed in an advanced simulation facility for testing. In addition, significant implementation issues may be addressed through flight testing on NASA research aircraft. Information is given in viewgraph form.

Palmer, Michael↗

Gulf of Mexico Helicopter Offshore System Technologies Recommended Development Path

The National Aeronautics and Space Administration (NASA) Advanced Air Transportation Technologies (AATT) project in cooperation with the Department of Transportation (DOT) Volpe National Transportation Systems Center (VNTSC) contracted with the System Resources Corporation (SRC) for the evaluation of the existing environment and the identification of user and service provider needs in the Gulf of Mexico low-altitude Offshore Sector. The results of this contractor activity are reported in the Gulf of Mexico Helicopter Offshore System Technologies Engineering Needs Assessment. A recommended system design and transition strategy was then developed to satisfy the identified needs within the constraints of the environment. This work, also performed under contract to NASA, is the subject of this report.

Koenke, Edmund J.↗

Role of physical countermaneuvers in the management of orthostatic hypotension: efficacy and biofeedback augmentation

OBJECTIVE: To evaluate the efficacy of various physical countermaneuvers in reducing orthostatic hypotension and its associated symptoms and to assess the efficacy of biofeedback training in enhancing the effectiveness of physical countermaneuvers. MATERIAL AND METHODS: In nine study subjects with neurogenic orthostatic hypotension, four training sessions on physical countermaneuvers were performed after tilt-up, three with visual feedback on the effect of physical countermaneuvers on blood pressure and other cardiovascular variables. Blood pressure change and orthostatic symptoms during tilt-up were determined, as were the changes in total peripheral resistance, stroke index, and heart rate. RESULTS: The five female and four male patients had a mean age of 53 years and a mean duration of symptoms of 4.2 years. On an orthostatic symptom scale of 0 to 10, these patients had a mean symptom score of 7.3. The increment in systolic blood pressure was better for some maneuvers (such as leg crossing and a combination) than others (such as neck flexion and abdominal contraction). Three patterns of responses to biofeedback were found. Simple maneuvers such as squatting did not improve with training; visual feedback was needed for maneuvers such as thigh contraction, and performance declined without biofeedback; the third pattern, seen in maneuvers such as leg crossing, showed continued improvement with training, even without biofeedback. A survey at 3 to 4 months after training revealed continued use of physical maneuvers (3.8 +/- 3.1 per day), increased standing time with each episode of presyncopal symptoms (8.3 +/- 5.8 minutes), and continued global symptomatic improvement. Total peripheral resistance, but not heart rate or stroke index, showed significant regression with blood pressure improvement. CONCLUSION: Physical countermaneuvers are efficacious in reducing orthostatic hypotension, can be augmented by use of biofeedback, and may significantly improve the functional outcome. The major mechanism of improvement is an increase in total peripheral resistance, presumably by reducing the vascular capacitance.

NASA Program Space Physiology and Countermeasures↗

The development of advanced technology blades for tilt-rotor aircraft

The paper discusses the development and ground testing of blades for the XV-15 tilt-rotor demonstrator aircraft. This work was performed under contract NAS2-11250 with NASA Ames Research Center. These blades, known as the Advanced Technology Blades (ATB), replace the rectangular, steel blades which were part of the XV-15 original design. The materials used in the primary structure of the ATB are fiberglass and high strain graphite epoxy laminates. This facilitates the use of 43 deg of nonlinear twist, a nonuniform tapered planform and thin airfoils required for aerodynamic efficiency. Instrumentation life is extended by encapsulating gages and wiring in the composite structure. Tip shells and cuff fairings are removable to provide access to tip weights and retention hardware; they are also replaceable with alternate research configurations. Extensive laboratory testing has validated predicted strength characteristics. Hover testing has demonstrated performance significantly superior to that predicted by contemporary methodology. Key elements of the test rig used for rotor performance measurement were developed as an ancillary part of the present program. The performance testing included measurement of near- and far-field noise. Induced inflow velocity distributions were also determined and photographs of tip vortex condensation trails were taken. These are providing guidance for modifications to hover peformance codes.

Alexander, Harold R.↗

Combined Effect of Contraction Ratio and Chamber Pressure on the Performance of a Gaseous Hydrogen-Liquid-Oxygen Combustor for a Given Propellant Weight Flow and Oxidant-Fuel Ratio

The effect of contraction ratio and chamber pressure on the combustion performance of a gaseous-hydrogen-liquid-oxygen combustor was investigated analytically and experimentally. The experiment was conducted with a "two-dimensional" gaseous-hydrogen-liquid-oxygen engine of about 150-pound thrust. The contraction ratio was varied from 1.5 to 6 by changing the nozzle throat area. This variation resulted in a chamber pressure variation of about 25 to 120 pounds per square inch. The experimental results were corrected for heat transfer to the engine walls and momentum pressure losses. The experimental performance, as evaluated in terms of characteristic exhaust velocity, was 98 percent of theoretical at contraction ratios greater than 3 but decreased very rapidly at smaller contraction ratios. The heat-transfer rate increased with increasing contraction ratio and chamber pressure; it was about 1 Btu per square inch per second at a contraction ratio of 1.5 and increased to about 3 at a contraction ratio of 6. The combined effects of contraction-ratio and chamber-pressure changes on performance were investigated analytically with a mixing model and a vaporization model. The mixing model predicted very poor mixing at contraction ratios below 3 and almost perfect mixing at higher contraction ratios. The performance predicted by the vaporization model was very close to 100 percent for all contraction ratios. From these results, it was concluded that the performance was limited by poor mixing at low contraction ratios and chamber pressures.

Hersch, Martin↗

Ground Operations Aerospace Language (GOAL). Volume 1: Study overview

A series of NASA and Contractor studies sponsored by NASA/KSC resulted in a specification for the Ground Operations Aerospace Language (GOAL). The Cape Kennedy Facility of the IBM Corporation was given the responsibility, under existing contracts, to perform an analysis of the Language Specification, to design and develop a GOAL Compiler, to provide a specification for a data bank, to design and develop an interpretive code translator, and to perform associated application studies.

Source record↗