Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “overtest”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

27 records · Page 2

Vibration and Acoustic Testing for Mars Micromission Spacecraft

The objective of the Mars Micromission program being managed by the Jet Propulsion Laboratory (JPL) for NASA is to develop a common spacecraft that can carry telecommunications equipment and a variety of science payloads for exploration of Mars. The spacecraft will be capable of carrying robot landers and rovers, cameras, probes, balloons, gliders or aircraft, and telecommunications equipment to Mars at much lower cost than recent NASA Mars missions. The lightweight spacecraft (about 220 Kg mass) will be launched in a cooperative venture with CNES as a TWIN auxiliary payload on the Ariane 5 launch vehicle. Two or more Mars Micromission launches are planned for each Mars launch opportunity, which occur every 26 months. The Mars launch window for the first mission is November 1, 2002 through April 2003, which is planned to be a Mars airplane technology demonstration mission to coincide with the 100 year anniversary of the Kittyhawk flight. Several subsequent launches will create a telecommunications network orbiting Mars, which will provide for continuous communication with lenders and rovers on the Martian surface. Dedicated science payload flights to Mars are slated to start in 2005. This new cheaper and faster approach to Mars exploration calls for innovative approaches to the qualification of the Mars Micromission spacecraft for the Ariane 5 launch vibration and acoustic environments. JPL has in recent years implemented new approaches to spacecraft testing that may be effectively applied to the Mars Micromission. These include 1) force limited vibration testing, 2) combined loads, vibration and modal testing, and 3) direct acoustic testing. JPL has performed nearly 200 force limited vibration tests in the past 9 years; several of the tests were on spacecraft and large instruments, including the Cassini and Deep Space One spacecraft. Force limiting, which measures and limits the spacecraft base reaction force using triaxial force gages sandwiched between the spacecraft and the test fixture, alleviates the severe overtest at spacecraft resonances inherent in rigid fixture vibration tests. It has the distinct advantage over response limiting that the method is not dependent on the accuracy of a detailed dynamic model of the spacecraft. Combined loads, vibration, and modal testing were recently performed on the QuikSCAT spacecraft. The combined tests were performed in a single test setup per axis on a vibration shaker, reducing test time by a factor of two or three. Force gages were employed to measure the true c.g. acceleration of the spacecraft for structural loads verification using a sine burst test, to automatically notch random vibration test input accelerations at spacecraft resonances based on predetermined force limits, and to directly measure modal masses in a base drive modal test. In addition to these combined tests on the shaker, the QuikSCAT spacecraft was subjected to a direct field acoustic test by surrounding the spacecraft, still on the vibration shaker, with rock concert type acoustic speakers. Since the spacecraft contractor does not have a reverberant field acoustic test facility, performing a direct field acoustic test -saved the program nearly two weeks schedule time that would have been required for packing / unpacking and shipping of the spacecraft. This paper discusses the rationale behind and advantages of the above test approaches and provides examples of their actual implementation and comparisons to flight data. The applicability of the test approaches to Mars Micromission spacecraft qualification is discussed.

Kern, Dennis L.↗

Results of the HESSI Test Mishap Investigation

On March 21, 2000, the High-Energy Solar Spectroscopic Imager (HESSI) spacecraft was subjected to a series of vibration tests at the Jet Propulsion Laboratory (JPL) as a part of its flight certification program. The structural qualification test, denoted as the sineburst test, subjected the spacecraft to a major overtest that resulted in significant structural damage to the spacecraft. The HESSI Test Mishap Investigation Board (MIB) was formed on March 24, 2000, in response to a NASA headquarters request. Board membership included experts from NASA and the University of California at Berkeley. This paper will present the investigation methods, findings, and lessons learned from the HESSI mishap.

Worth, Daniel B.↗

NASA Critical Facilities Maintenance Assessment

Critical Facilities Maintenance Assessment (CFMA) was first implemented by NASA following the March 2000 overtest of the High Energy Solar Spectroscopic Imager (HESSI) spacecraft. A sine burst dynamic test using a 40 year old shaker failed. Mechanical binding/slippage of the slip table imparted 10 times the planned force to the test article. There was major structural damage to HESSI. The mechanical "health" of the shaker had not been assessed and tracked to assure the test equipment was in good working order. Similar incidents have occurred at NASA facilities due to inadequate maintenance (e.g., rainwater from a leaky roof contaminated an assembly facility that housed a spacecraft). The HESSI incident alerted NASA to the urgent need to identify inadequacies in ground facility readiness and maintenance practices. The consequences of failures of ground facilities that service these NASA systems are severe due to the high unit value of NASA products.

maintenance↗

Leading Your Leaders

Even though working on a problem has been your primary effort for the past year, your leadership may have heard about this once in a briefing a decade ago. Now they are basically clueless. Pretend that you are talking to your daughter's fifth-grade class. Explain how your complicated gizmo works. If possible, do not use acronyms. Define your terms. Put your work in context. Assume your leader has no idea what you do, who you work for, or what your gizmo does. That is a good place to start. Remember, taking the next century to study the problem or spending the Gross National Product to invent a new solution are probably not going to be acceptable solutions. Real engineers and technicians build real hardware that works in the real world in a reasonable manner within a reasonable time at a reasonable cost. True, skimping on time or money can cause mistakes, but folks whose gizmos are delayed unreasonably or cost more than is practical get their programs canceled, force the business into bankruptcy, or give the market over to the competition. Real engineers and technicians always consider cost and schedule in their work. Raising questions is important. However, we are in the business of doing things. Engineers and technicians are paid to get things done. Yes, you have to identify the problem, frame the design, identify the tests, perform the analysis, and assemble the hardware. But the goal is to solve the problem. Nobody ever said flying in space was easy. We make it look easy the same way that an Olympic champion makes her sport look easy: by working hard at improving performance every day. Better are the results of a well-defined test. Remember that a test on a laboratory bench is always an approximation of reality, and rules similar to those for good analysis also apply. One should always be mindful of Mechelay's rule: "It is better to be stupid than to run a stupid test." Often we try to overtest. If a piece of hardware passes an unbelievably difficult test, then life is good. More often when an unbelievably difficult test fails, we are left with a very long discussion of why and what was wrong in the design or execution of the test. Make sure that the test is well defined. Even then, it is important to explain to your leaders what inherent accuracy (or error) the test conditions or equipment have and what the assumptions or initial conditions were for the test. Test results without a good understanding of the test's accuracy or the pedigree of the test assumptions are worth very little. Finally, there is flight test data. Always limited, never at the edge of the envelope, it still shows how the real hardware works in a combined environment. Flight experience is dangerous because it typically doesn't show how close to the edge of the cliff the equipment is operating, but it does demonstrate how the hardware really works. A flight test is the ultimate test, again taken with the knowledge that it is probably not the extreme but something more like the middle of the environmental and systems performance. Good understanding of a problem and its solution always relies on a combination of all these methods. Be sure to lead your leaders by using all the tools you have at your disposal. At the end of the day, decisions in space flight always come down to a risk trade. Our business is not remotely safe, not in the sense that the public, the media, or our legislators use the term. Everything we do has a risk, cost, schedule, or performance trade-off. For your leaders to make an appropriate decision, you need to educate them, lead them, talk with them, and engage them in the discussion until full understanding takes place. It's your job. *

Hale, Wayne N.↗

Structural Dynamic Analysis of a Spacecraft Multi-DOF Shaker Table

Finite element enforced response analysis was performed on a multiple degree of freedom expander head shaker table to aid in the design of the table structure and vibration control system. The payload for this shaker system is a spacecraft with a multitude of flexible modes across a broad frequency band. A Craig-Bampton representation of the spacecraft was used to expedite analysis of multiple shaker table designs. The analysis examines the required forces in the actuators for a constant amplitude base acceleration sine sweep test, the resulting forces in the spacecraft and table attachment restraints, and the resulting accelerations on the spacecraft structure. The results show the spacecraft response at low frequencies is very high near the tip due to the low order spacecraft bending and axial modes. The high response can be addressed by notching the input vibration levels to avoid overtesting the spacecraft. At frequencies above 25 Hz, the spacecraft modal effective masses are very small, and the response of the shaker table dominates the response. Anti-resonances of the shaker table in the frequency range of interest reduce the acceleration output and require much higher actuator forces to achieve the acceleration specification. These effects may require stiffening the shaker structure to move the modes out of the test frequency range or increasing the shaker table damping.

Pray, Carl↗

A New Approach in Force-Limited Vibration Testing of Flight Hardware

The force-limited vibration test approaches discussed in NASA-7004C were developed to reduce overtesting associated with base shake vibration tests of aerospace hardware where the interface responses are excited coherently. This handbook outlines several different methods of specifying the force limits. The rationale for force limiting is based on the disparity between the impedances of typical aerospace mounting structures and the large impedances of vibration test shakers when the interfaces in general are coherently excited. Among these approaches, the semi-empirical method is presently the most widely used method to derive the force limits. The inclusion of the incoherent excitation of the aerospace structures at mounting interfaces has not been accounted for in the past and provides the basis for more realistic force limits for qualifying the hardware using shaker testing. In this paper current methods for defining the force limiting specifications discussed in the NASA handbook are reviewed using data from a series of acoustic and vibration tests. A new approach based on considering the incoherent excitation of the structural mounting interfaces using acoustic test data is also discussed. It is believed that the new approach provides much more realistic force limits that may further remove conservatism inherent in shaker vibration testing not accounted for by methods discussed in the NASA handbook. A discussion on using FEM/BEM analysis to obtain realistic force limits for flight hardware is provided.

force limiting responses↗

Development of a new method in force limited vibration testing

The force limited vibration test approaches discussed in NASA-HDBK-7004C were developed to reduce overtesting associated with base shake vibration tests of aerospace hardware. This handbook outlines several different methods of specifying force limiting specifications. The basis for deriving force limiting specifications is related to the differences between mechanical impedances of typical aerospace hardware interfacing the mounting structures in flight configurations and the large impedances inherent in shaker vibration testing. Among these approaches, the semi-empirical method is presently the most widely used method to derive the force limiting specifications. This method is developed based on the assumption that the hardware interface responses are coherently excited. The inclusion of the incoherent excitation of the aerospace structures at mounting interfaces provides the basis for developing a more realistic force limiting specification that may be used to qualify flight hardware for launch environments using shaker testing. In this paper the semi-empirical method for defining force limiting specifications discussed in NASA handbook are reviewed using data recently obtained from a series of acoustic and vibration tests. A mathematical formation of a new force limiting approach based on considering the incoherent excitation of the hardware at their mounting interfaces is developed. Results from the analysis, which are correlated to the data obtained from a series of well instrumented acoustic and vibration tests, are discussed. The new approach provides much more realistic force limits that may further remove conservatism inherent in shaker vibration testing not accounted for by methods discussed in the NASA handbook.

Kolaini, Ali R.↗

Initial Testing of Promess Press Shielding

Testing of the initial design for the shielding to be added to the Promess servo press installed in TA9 0032 was completed on April 28, 2026. This shielding design did not provide satisfactory protection to either workers or equipment within the bay when tested at an explosive quantity of 82.5g. This memo details the design, testing method, and results of the test.

36 MATERIALS SCIENCE↗