Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Guidelines for Implementation of an Advanced Outage Control Center to Improve Outage Coordination, Problem Resolution, and Outage Risk Management

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear power plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

99 GENERAL AND MISCELLANEOUS↗

Wildfire-Power Grid Interactions: Feedback, Impacts, Monitoring, Modeling, and Mitigation Strategies

Wildfires are increasingly interacting with electric power systems through a two-way hazard chain: fires damage grid assets and trigger cascading outages, while grid faults can ignite new fires under hot, dry, and windy conditions. This review synthesizes the state of knowledge across five domains: (i) physical impacts of flames, heat, and smoke on lines, towers, insulators, and substations; (ii) power-infrastructure-initiated ignitions via conductor clash, high-impedance faults, and corona discharge; (iii) widespread blackouts and disproportionate societal impacts; (iv) multi-scale monitoring spanning laboratory tests, in-situ and grid-integrated sensors, and Earth observation; (v) coupled modeling that links fire behavior with grid operations; and (vi) technological and strategic mitigation pathways spanning prevention, response, and recovery. We integrate these domains into a novel 'feedback-aware' socio-technical framework. Through a longitudinal analysis (2005-2025) of global incidents, we identify that while vegetation contact remains the most frequent ignition source, aging infrastructure failure has emerged as a critical driver of catastrophic 'mega-fires'. We further identify persistent gaps, including limited interoperability of high-frequency grid and environmental data, scarce real-time data assimilation, and under-developed equity metrics for outage management. We conclude by outlining a research agenda to (1) deploy interoperable sensing architectures, (2) advance feedback-coupled fire-grid simulations, and (3) evaluate mitigation portfolios through techno-economic and fairness lenses. Recognizing wildfire-grid interactions as coupled socio-technical systems is essential for protecting infrastructure and communities and for ensuring reliable, sustainable electricity in a changing world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Smart distribution systems

The increasing importance of system reliability and resilience is changing the way distribution systems are planned and operated. To achieve a distribution system self-healing against power outages, emerging technologies and devices, such as remote-controlled switches (RCSs) and smart meters, are being deployed. The higher level of automation is transforming traditional distribution systems into the smart distribution systems (SDSs) of the future. The availability of data and remote control capability in SDSs provides distribution operators with an opportunity to optimize system operation and control. In this paper, the development of SDSs and resulting benefits of enhanced system capabilities are discussed. A comprehensive survey is conducted on the state-of-the-art applications of RCSs and smart meters in SDSs. Specifically, a new method, called Temporal Causal Diagram (TCD), is used to incorporate outage notifications from smart meters for enhanced outage management. To fully utilize the fast operation of RCSs, the spanning tree search algorithm is used to develop service restoration strategies. Optimal placement of RCSs and the resulting enhancement of system reliability are discussed. Distribution system resilience with respect to extreme events is presented. Furthermore, test cases are used to demonstrate the benefit of SDSs. Active management of distributed generators (DGs) is introduced. Future research in a smart distribution environment is proposed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimizing Service Restoration in Distribution Systems With Uncertain Repair Time and Demand

This paper proposes a novel method to co-optimize the distribution system operation and repair crew routing for outage restoration after extreme weather events. A two-stage stochastic mixed integer linear program is developed. The first stage is to dispatch the repair crews to the damaged components. The second stage is distribution system restoration using distributed generators, and reconfiguration. We consider demand uncertainty in terms of a truncated normal forecast error distribution, and model the uncertainty of the repair time using a lognormal distribution. A new decomposition approach, combined with the progressive hedging algorithm, is developed for solving large-scale outage management problems in an effective and timely manner. Furthermore, the proposed method is validated on modified IEEE 34- and 8500-bus distribution test systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Toward a MILP Modeling Framework for Distribution System Restoration

Large-scale blackouts and extreme weather events in recent decades raise the concern for improving the resilience of electric power infrastructures. Distribution service restoration (DSR), a fundamental application in outage management systems, allows restoration solutions for system operators when power outages happen. As distribution generators (DGs) and remotely controllable devices are increasingly installed in distribution systems, an advanced DSR framework is critical to perform optimally coordinated restoration that can achieve maximal restoration performance. This work introduces a DSR modeling framework, which can generate optimal switching sequences and estimated time of restoration in the presence of remotely controllable switches, manually operated switches, and dispatchable DGs. Two mathematical models, a variable time step model and a fixed time step model, are presented and compared. The proposed models are formulated as a mixed-integer linear programming model, and their effectiveness is evaluated via the IEEE 123 node test feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ADMS State of the Industry and Gap Analysis

An Advanced distribution management system (ADMS) is a platform for optimized distribution system operational management. This platform comprises of distribution management system (DMS) applications, supervisory control and data acquisition (SCADA), outage management system (OMS), and distributed energy resource management system (DERMS). One of the primary objectives of this work is to study and analyze several ADMS component and auxiliary systems. All the important component and auxiliary systems, SCADA, GISs, DMSs, AMRs/AMIs, OMSs, and DERMS, are discussed in this report. Their current generation technologies are analyzed, and their integration (or evolution) with an ADMS technology is discussed. An ADMS technology state of the art and gap analysis is also presented. There are two technical gaps observed. The integration challenge between the component operational systems is the single largest challenge for ADMS design and deployment. Another significant challenge noted is concerning essential ADMS applications, for instance, fault location, isolation, and service restoration (FLISR), volt-var optimization (VVO), etc. There are a relatively small number of ADMS application developers as ADMS software platform is not open source. There is another critical gap and while not being technical in nature (when compared the two above) is still important to consider. The data models currently residing in utility GIS systems are either incomplete or inaccurate or both. This data is essential for planning and operations because it is typically one of the primary sources from which power system model are created. To achieve the full potential of ADMS, the ability to execute acute Power Flow solution is an important pre-requisite. These critical gaps are hindering wider Utility adoption of an ADMS technology. The development of an open architecture platform can eliminate many of these barriers and also aid seamless integration of distribution Utility legacy systems with an ADMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

A Business Case for Nuclear Plant Control Room Modernization

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM). The analysis presented in two forms; 1) a standalone technology upgrade, and 2) a technology upgrade that is built upon and incremental to a prior business case created for Mobile Work Packages (MWP). The business case contends that advanced communication and networking and analytical technologies will allow NPP to conduct control room operations with improved focus by reducing human factors and redundant manpower, and therefore operate with fewer errors. While some labor savings can be harvested in terms of overtime, the majority of savings are demonstrated as reduced time to take the plant off line and bring back on line in support of outages. The benefits are quantified to a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. This business case focuses on modernization of the operator control room and does not consider a complete overhaul and modernization of a plants instrument and control systems. While operators may be considering such an investment at their plants, the sizable capital investment required is not likely supported by a cost/benefit analysis alone. More likely, it is driven by obsolescence and reliability issues, and requires consideration of mechanical condition of plant systems, capital depreciation, financing, relicensing and overall viability of the plant asset over a 20-year horizon in a competitive market. Prior studies [REF] have indicated that such a modernization of plant I&C systems, alone or as part of a larger modernization effort, can yield very significant reductions in O&M costs. However, the depth of research and analysis required to develop a meaningful business case for a plant modernization effort is well beyond the scope of this study. While CRM as considered in this study can be easily integrated as part of grander plant modernization effort, it can also be considered as a stand-alone project, implemented as a supervisorial layer over and above existing systems. CRM is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Modernized control room with interactive displays • High-bandwidth wireless networks • Mobile devices • Component identification technology • Mobile wireless video cameras • Smart or task based operator displays • Computer-Based Procedures (CBP)/Automated Mobile Work Packages (MWP) • Intelligent plant configuration • Advanced data analytics An analysis was conducted to determine how these technologies might impact outage operations at an NPP. The analysis concluded that outage management capabilities would be improved with application of these technologies, and result in annual benefits for the plant. These improved capabilities were identified and described in further detail in this report. • Reduction in need redundant manpower (verification, etc) • Improved critical path shutdown and restart duration during outages • Reduction in human factors and errors • Remote watches • Paperless outage coordination • Bulk work optimization

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GridDS: Data Science Toolkit for Energy Grid Data

According to the U.S. Energy Information Administration (EIA), the demand for energy is expected to increase 50% by the year 20501. While energy standards, such as the Institute of Electrical and Electronics Engineers (IEEE) Standard 1547, (Basso 2015) and monitoring with wide area management systems (WAMS) (Liu 2017, Zhou 2016) have enabled large scale data collection and storage, the application of this data in mitigating costs associated with increased consumer demand is an ongoing focus for energy research. This ubiquitous data collection presents a promising opportunity for machine learning and data science to improve efficiency of distributed energy resources (DERs). The GridDS software toolkit is designed to leverage advanced metering infrastructure (AMI), outage management systems data (OMS), Supervisory control Data Acquisition (SCADA), and geographic information systems (GIS) to forecast future energy demands and detect incipient grid failures. GridDS is a python software library designed to be modular and generalizable to data recorded by DERs. In adapting to disparate datasets recorded by various WAMS, GridDS provides a range of unique functionality not presently implemented in current WAMS which have highly specific software infrastructure by design. GridDS functionality ranges from data specification and preparation, to training and validation for state of the art machine learning, to interactive data visualization. For data intake, GridDS combines: Pandera: a library for creating data specifications. TimeScaleDB: a postgresSQL database infrastructure for efficient storage of timeseries data. Dataset class: A custom dataset class / interface that ensures modularity between a range of synthetic and live recorded datasets. Is

Ladd, Alexander↗

Accelerating Resilience of the Community through Holistic Engagement and use of Renewables (ARCHER) Planning Framework

The primary objective of the Accelerating Resilience of the Community through Holistic Engagement and Use of Renewables (ARCHER) initiative was to identify and incorporate the unique variations in energy burden, social vulnerability, living conditions, and access to essential services that differ across communities. By accounting for these localized factors—down to the neighborhood level—the project supports more targeted and effective investments in community resilience. The framework seeks to establish practical planning guidance, methods, and performance measures for community energy resilience, integrate community-level and electric utility system resilience planning, and assess its effectiveness through comparison with conventional and operational planning approaches. A key component of the project was its data exchange platform, which is used to evaluate and demonstrate the tools, methodologies, and planning approaches developed through ARCHER. This open-source platform enables developers and vendors of distribution and outage management systems to build upon the research by incorporating its concepts into their own tools and workflows. This capability is enabled by the transparent availability of data, functional requirements, and the underlying information model. The project yielded several important insights. First, meaningful engagement with communities is essential to achieving comprehensive resilience outcomes. Second, resilience planning is most effective when electric grid considerations and broader community needs are addressed in a coordinated manner. Third, the use of platforms that allow for real-time input from communities can enhance utility responsiveness during restoration activities. Fourth, a structured and systematic planning approach can successfully translate ARCHER concepts into practice. Fifth, the development of an integrated metric that reflects both grid performance and community impacts provides a more holistic basis for evaluating resilience. Finally, incorporating community engagement and equity considerations into grid operations is critical, particularly during severe weather events that result in extended outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Roadmap and Benchmarking: Privacy in Federated Load Forecasting

Data-driven techniques for energy demand forecasting continue to emerge with promising impacts on distribution grid planning. However, the development of robust and generalizable machine learning models requires that representative high quality training data are available. Distributed energy resources have begun to embed intelligence, gathering large amounts of data on customer demand, behavior, and household devices that are connected to the grid. Though utilities aggregate meter-level demand data for load shaping, demand response, outage management, reliability planning, and billing applications, there lies an inherent privacy concern in sharing consumption data that may identify individual consumer behavioral patterns. Hence, while sharing the data is crucial, the private sensitive customer data must be safeguarded from being exposed or manipulated. In this study, we propose a roadmap for implementing a based privacy preserving framework to support the advancement of data-driven analytics in data-sensitive distributed energy resources environments. The roadmap incorporates federated learning–a distributed training framework, differential privacy–a statistical framework that provides guarantees to safeguard the leakage of sensitive data, secure multiparty computation and homomorphic encryption– techniques for encrypting model gradients and applying secure aggregation on the server. Moreover, we perform baseline experiments on the federated short-term load forecasting (STLF) task using open-source residential load profile datasets, offering insights into the challenges of integrating differential privacy into federated learning.

Abebe, Waqwoya [Oak Ridge National Laboratory (ORN↗

Network reconfiguration and distributed energy resource scheduling for improved distribution system resilience

Electric utility companies work to restore as much load as possible after power outages caused by extreme weather events. In this paper, an outage management strategy is proposed to enhance distribution system resilience through network reconfiguration and distributed energy resources (DERs) scheduling. After a line fault, the proposed algorithm can identify radial network topology based on the rank of the incidence matrix. The reconfiguration is implemented by switching tie lines and sectionalizing lines. With the new network topology, an optimal DER scheduling problem is solved to minimize the accumulative cost for dispatchable DER operation and load reduction. Finally, the optimal topology that minimizes the accumulative cost is selected from all radial topologies. The computational workload is relatively low because only linear programming needs to be solved. Using the case studies of the IEEE 69-bus and IEEE 123-bus systems, we consider the worst-case scenarios in which faults occur in the upstream feeder. The simulation results demonstrate that the proposed strategy allows for a relatively high percentage of the load to remain in service after line faults. Furthermore, compared with microgrid-formation approaches, the proposed strategy has advantages when applied to the distribution systems with several normally-open tie lines and low DER penetration.

42 ENGINEERING↗

Quantifying Distribution System Resilience From Utility Data: Large Event Risk and Benefits of Investments

We focus on blackouts in electric distribution systems that have a large cost to customers. To quantify resilience to these events, we show how to calculate risk metrics from the historical outage data routinely collected by utilities' outage management systems. Risk is defined using a customer cost exceedance curve. The exceedance curve has a heavy tail that implies large fluctuations in large blackout costs, and this makes estimating the mean large cost in the usual way impractical. To avoid this problem, we use new resilience metrics describing the large event risk; these metrics are the probability of a large cost event, the annual log cost resilience index, and the average of the logarithm of the cost of large-cost events or the slope magnitude of the tail on a log–log exceedance curve. Resilience can be improved by planned investments to upgrade system components or speed up restoration. The benefits that these investments would have had if they had been made in the past can be quantified by “rerunning history” with the effects of the investment included, and then recalculating the large event risk to find the improvement in resilience. An example using utility data shows a 2% reduction in the probability of a large cost event due to 10% wind hardening and 6%–7% reduction due to 10% faster restoration in two different areas of a distribution utility. This new data-driven approach to quantify resilience and resilience investments is realistic and much easier to apply than complicated approaches based on modeling all the phases of resilience. Moreover, an appeal to improvements to past lived experience may well be persuasive to customers and regulators in making the case for resilience investments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Convolutional Neural Networks for Distribution System Fault Classification

Faults happen very frequently in distribution systems. Identifying fault types and phases are of critical importance for outage management, fault location, and service restoration. However, this task becomes very challenging due to measurement scarcity in distribution systems. This paper is among the first few that applies deep learning techniques in distribution system fault classification. Specifically, a sequential Convolutional Neural Network(CNN)-based classifier is developed to identify fault buses and phases. The input to the CNN is the steady-state voltage and current data measured at substations. The fault identification is modeled as a multi-label classification problem. Training data under various fault scenarios are obtained in OpenDSS and Gaussian noises are added to mimic measurement errors. A case study in IEEE 13-feeder test system is conducted with single and multiple bus faults scenarios. Numerical results demonstrate the high accuracy and fast computation of the proposed deep CNN-based fault classification.

Tian, Guanyu↗

Resilient Disaster Recovery Logistics of Distribution Systems: Co-Optimize Service Restoration With Repair Crew and Mobile Power Source Dispatch

Repair crews (RCs) and mobile power sources (MPSs) are critical resources for distribution system (DS) outage management after a natural disaster. However, their logistics have not been well investigated. We propose a resilient scheme for disaster recovery logistics to co-optimize DS restoration with the dispatch of RCs and MPSs. A novel co-optimization model is formulated to route RCs and MPSs in the transportation network, schedule them in the DS, and reconfigure the DS for microgrid formation coordinately, etc. The model incorporates different timescales of DS restoration and RC/MPS dispatch, the coupling of transportation and power networks, etc. To ensure radiality of the DS with variable physical structure and MPS allocation, we also model topology constraints based on the concept of spanning forest. The model is convexified equivalently and linearized into a mixed-integer linear programming. To reduce its computation time, preprocessing methods are proposed to preassign a minimal set of repair tasks to depots and reduce the number of candidate nodes for MPS connection. Resilient recovery strategies thus are generated to enhance service restoration, especially by dynamic formation of microgrids that are powered by MPSs and topologized by repair actions of RCs and network reconfiguration of the DS. Case studies demonstrate the proposed methodology.

Disaster recovery logistics↗

Profiling Real-Time Electricity Consumption Data for Process Monitoring and Control

Today, smart meters serve as key assets to utilities and their customers because they are capable of recording and communicating real-time energy usage data; thus, enabling better understanding of energy usage patterns. Other potential benefits of smart meters data include the ability to improve customer experience, grid reliability, outage management, and operational efficiency. Despite these tangible benefits, many utilities are inundated by data and remain uncertain about how to extract additional value from these deployed assets outside of billing operations. One way to overcome this challenge is the development of new metrics for classifying utility customers. Traditionally, utilities classified their customers based on their business nature (residential, commercial, and industrial) and/or their total annual consumption. While this classification is useful for some operational functions, it is too limited for designing effective monitoring and control strategies. In this paper, a data mining methodology is proposed for clustering and profiling smart meters data in order to form unique classes of customers exhibiting similar usage patterns. The developed clusters could help utilities in identifying opportunities for achieving some of the benefits of smart meters data.

consumer engagement↗