Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “orbit maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

GPM Orbital Maintenance Planning and Operations in Low Solar Activity Environment

The orbital maintenance operations of the GPM Core Observatory was predicted to have routine drag makeup maneuvers to maintain the mission orbit. The maneuver frequency and estimated fuel usage calculated prelaunch were very comparable to the actual values observed after launch for the first two years. However, when the solar minimum was being entered, instead of seeing the need for less frequent station keeping maneuvers the operations team had to adjust the maneuver plan operations in order to maintain orbit requirements during the low atmospheric drag period predicted to last as long as 2021.

flight dynamics↗

Analysis of Envisat Orbit Maintenance Strategies to Improve/Increase Envisat ASAR Interferometry Opportunities

The biggest and most advanced Earth Observation Satellite in-orbit, developed by the European Space Agency (ESA) and its member states, is Envisat. It was launched on March 1, 2002 by an Ariane V from French Guyana and holds a total of 10 multi-disciplinary Earth observation instruments, among which an Advanced Synthetic Aperture Radar (ASAR). The ASAR user community requested the Flight Dynamics division of the European Space Operations Centre (ESOC) to investigate how the orbit control maintenance strategy for Envisat could be changed to optimize ASAR interferometry opportunities overall and in addition support the International Polar Year 2007/2008 initiative. The Polar Regions play a pivotal role in understanding our planet and our impact on it as they are recognized as sensitive barometers of environmental change. One of the main themes of the International Polar Year 2007/2008 is therefore the study of Earth s changing ice and snow, and its impact on our planet and our lives. Naturally, ESA would like to support this very important initiative. This paper presents the investigations that have been conducted to support these requests in the best possible way. It discusses the orbit maintenance strategy that has been in place since its launch, ensuring the actual orbit to be within 1 km of a so-called reference orbit, and presents the new orbit maintenance strategy that is aimed at improving/increasing the opportunities for Envisat ASAR interferometry, while preserving the fuel on board the spacecraft. The hydrazine on-board Envisat happens to be a precious resource as only approximately 300 kg of it was available at launch, like ERS-2. The difference being however that the mass of Envisat is approximately 3.2 times that of ERS-2.

Kuijper, D.↗

Optimized Trajectory Correction Burn Placement for NRHO Orbit Maintenance

NASA's future Artemis missions plan to utilize a near rectilinear halo orbit (NRHO) in the lunar vicinity to facilitate access to the lunar surface and place other critical assets to support human exploration. This exploration architecture requires a vehicle to remain in the NRHO for long periods of time ranging from several days, to weeks, to months, and even years. Consequently, periodic orbit maintenance burns become essential to ensure the spacecraft follows the desired reference trajectory in an efficient yet effective manner despite crew activity, navigation uncertainty, maneuver execution errors, disturbance accelerations, orbit insertion dispersions, and other system limitations. This work introduces a targeting algorithm that can be utilized to analyze a variety of targeting constraints and parameters that maximizes overall performance. Techniques associated with robust trajectory optimization are used to identify the optimized number and placement for NRHO trajectory correction (NTC) burns that accounts for the mission schedule, both a primary and backup navigation system, targeting strategies and burn plan configurations, vehicle venting, thruster selection, and integrated GN\&C performance. A notional scenario extracted from the NASA Artemis III mission is used to motivate and demonstrate these concepts and performance results.

Linear Covariance Analysis↗

Simulation of on-orbit maintenance cycle for LST

A maintenance simulation model of the Large Space Telescope has been developed to assess the operational cost sensitivity to system configuration options. The model lends itself to equipment-level selections for various subsystem alternatives. Maintenance decisions include considerations for LST spacecraft on-orbit service or retrieval. Tradeoffs are identified in terms of on-orbit maintenance for specific design concepts, with Space Shuttle revisit costs balanced against retrieval and ground-facility operations. Simulation output is in the form of computer plots of cost, availability, time to first maintenance, and a cost-effective Shuttle revisit frequency.

Donnelly, J. A.↗

The role of predicted solar activity in TOPEX/Poseidon orbit maintenance maneuver design

Following launch in June 1992, the TOPEX/Poseidon satellite will be placed in a near-circular frozen orbit at an altitude of about 1336 km. Orbit maintenance maneuvers are planned to assure all nodes of the 127-orbit 10-day repeat ground track remain within a 2 km equatorial longitude bandwidth. Orbit determination, maneuver execution, and atmospheric drag prediction errors limit overall targeting performance. This paper focuses on the effects of drag modeling errors, with primary emphasis on the role of SESC solar activity predictions, especially the 27-day outlook of the 10.7 cm solar flux and geomagnetic index used by a simplified version of the Jacchia-Roberts density model developed for this TOPEX/Poseidon application. For data evaluated from 1983-90, the SESC outlook performed better than a simpler persistence strategy, especially during the first 7-10 days. A targeting example illustrates the use of ground track biasing to compensate for expected orbit predictions errors, emphasizing the role of solar activity prediction errors.

Frauenholz, Raymond B.↗

On-Orbit Maintenance Operations Strategy for the International Space Station - Concept and Implementation

The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned, assembled on orbit, and multi-national. With this technical and operational challenge, a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis, supply, maintenance, and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance, a myriad of products and processes must be created and coordinated, such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).

Patterson, Linda P.↗

Revalidation of the Volatile Organic Analyzer Following a Major On-Orbit Maintenance Activity

The Volatile Organic Analyzer (VOA) contributes to the assessment of air quality aboard the International Space Station (ISS) by identifying and quantifying target airborne volatile organic contaminants in the module air. This on-orbit contaminant monitoring capability becomes particularly important during an air quality degradation event such as a system leak. During several ISS air quality degradations, the VOA has generated near real-time data that was used to make decisions or to better understand the contingency. The VOA was operational from January 2002 through June 2003, during which time it was validated by comparing VOA data to simultaneously acquired grab sample containers (GSCs). In January 2003, one of the two analytical channels of the VOA was shutdown because of a component failure, but a redundant channel continued to supply the necessary analytical data. In June 2003, the sole remaining channel was deactivated. Initial assessments of the channel shutdowns pointed to failed fuses or heaters, but neither was considered repairable on orbit. In 2005, it was determined that failed fuses could be replaced on orbit and the crew conducted a diagnostic procedure to identify the failed component. The crew discovered that both channels incurred failed fuses, which lead to a subsequent on orbit maintenance activity and return of the VOA to operational status in December 2005. The VOA has been providing data on the ISS atmosphere since its reactivation in 2005 and this paper will present the VOA data collected during 2006. Special emphasis will be placed upon the revalidation of the repaired VOA using GSCs as well as a summary of the diagnostic and repair procedures.

Limero, Thomas↗

Flight Software Design and On-orbit Maintenance

This viewgraph presentation discusses the maintenance of flight software (FSW) on-orbit and the design of that software to allow maintenance of programs while they are on orbit.

Calder, Alexander C.↗

TOPEX/POSEIDON orbit maintenance maneuver design

The Ocean Topography Experiment (TOPEX/POSEIDON) mission orbit requirements are outlined, as well as its control and maneuver spacing requirements including longitude and time targeting. A ground-track prediction model dealing with geopotential, luni-solar gravity, and atmospheric-drag perturbations is considered. Targeting with all modeled perturbations is discussed, and such ground-track prediction errors as initial semimajor axis, orbit-determination, maneuver-execution, and atmospheric-density modeling errors are assessed. A longitude targeting strategy for two extreme situations is investigated employing all modeled perturbations and prediction errors. It is concluded that atmospheric-drag modeling errors are the prevailing ground-track prediction error source early in the mission during high solar flux, and that low solar-flux levels expected late in the experiment stipulate smaller maneuver magnitudes.

Bhat, R. S.↗

The Role of Anomalous Satellite-Fixed Accelerations in TOPEX/Poseidon Orbit Maintenance

Shortly after the launch of TOPEX/Poseidon on 10 August 1992 orbit determination indicated orbital decay levels approximately 60 times larger than could be explained by atmospheric drag. Outgassing, a complex process of molecular releases from satellite non-metallic parts, was the most likely source of these early decay rates. The high decay levels steadily declined during the first six weeks while a planned sequence of six orbit adjust maneuvers placed the satellite in the operational orbit to precisely overfly a predetermined repeat ground track. At the same time, on-going orbit trend analysis revealed the presence of residual along-track forces comparable to atmospheric drag which clearly exhibited a body-fixed origin. These anomalous forces cause either orbital decay or boost, depending on the satellite attitude and solar array articulation mode. As such, these along-track forces can either add to, or oppose, the resident orbital decay due to drag...

Bhat, R.S.↗

Designing for on-orbit maintenance

The history of conducting maintenance in space is outlined with particular emphasis on Skylab and shuttle missions to develop maintenance concepts for applications to maintaining the Space Station Freedom. In-flight maintenance (IFM) encompasses the activities of the crew alone or with robotic devices inside or outside the pressurized elements. The extravehicular activities (EVAs) and 141 on-orbit intravehicular activities (IVAs) related to space shuttle flights are discussed in terms of task and level of success. Skylab IFM procedures including IVA and EVA are similarly assessed, and two critical issues are identified. Coordination of flight crew, technicians, and other personnel is critical, and the efficient generation, collection, and storage of data is a key to IFM effectiveness. The overriding concern is that design guidelines for IFM learned from other programs are built into the development of technologies for the Space Station Freedom.

Accola, Anne L.↗

Orbital Maintenance for the Wide Field Infrared Survey Telescope: Effects of Solar Radiation Pressure and Navigation Accuracies on Station Keeping.

The Wide-Field Infrared Survey Telescope (WFIRST) is a NASA observatorydesigned to answer questions about dark energy and astrophysics, planned for alaunch in 2025 to orbit around the Sun-Earth L2 (SEL2) Libration Point. Due tothe instability of the SEL2 vicinity, WFIRST must perform station keeping maneuversto remain in orbit. This paper reviews different navigation solutions and SRP modelingtechniques that are being considered when planning these maneuvers. In this paper,we will describe station keeping strategy, we will explore the possibility of using an on-boardnavigation system and finally study how Solar Radiation Pressure (SRP) affectsits orbital motion and controllability.

Solar↗

Orbital Maintenance for the Wide Field Infrared Survey Telescope: The Effects of Solar Radiation Pressure and Navigation Accuracies on Station Keeping

The Wide-Field Infrared Survey Telescope (WFIRST), a NASA observatory designed to investigate dark energy and astrophysics, is planned for a launch in 2025 to orbit the Sun-Earth L2 (SEL2) Libration Point. Due to the instability of the SEL2 environment, WFIRST must perform maneuvers to remain in its mission orbit. This paper investigates how different error sources affect the resulting stationkeeping delta v for WFIRST. We study how Solar Radiation Pressure (SRP) modeling affects WFIRST's orbital motion and stability, and how SRP combined with Orbit Determination (OD) errors drive the stationkeeping maneuver magnitudes. Our goal is to determine the best way to model WFIRST's SRP so that we minimize its impact on total stationkeeping delta v required over the mission lifetime.

Radiation↗

Space Telescope - Design for orbital maintenance

Maintenance and repair of the Shuttle launched Space Telescope (ST) are examined, noting that except for the basic structure, mirrors, cables, and several noncritical items, the entire ST is replaceable or reparable on-orbit. EVA tasks have been designed to avoid contamination, and to provide a reduction in Orbital Replacement Units, a minimal number of doors and openings, and minimized structural weight associated with free-volume. All removable components have been provided with tool-compatible fittings and releases, and standardization of parts has been compromised with considerations of interface with crew handling. Replacement and repair equipment will be carried as an added parcel on Shuttle flights and are not part of the standard Shuttle components. The necessity of designing for crew-aid at ST workstations is suggested to provide sound data for the design of other space-based equipment.

Fisher, H. T.↗

Preliminary assessment of power-generating tethers in space and of propulsion for their orbit maintenance

The concept of generating power in space by means of a conducting tether deployed from a spacecraft was studied. Using hydrogen and oxygen as the rocket propellant to overcome the drag of such a power-generating tether would yield more benefit than if used in a fuel cell. The mass consumption would be 25 percent less than the reactant consumption of fuel cells. Residual hydrogen and oxygen in the external tank and in the orbiter could be used very effectively for this purpose. Many other materials (such as waste from life support) could be used as the propellant. Electrical propulsion using tether generated power can compensate for the drag of a power-generating tether, half the power going to the useful load and the rest for electric propulsion. In addition, the spacecraft's orbital energy is a large energy reservoir that permits load leveling and a ratio of peak to average power equal to 2. Critical technologies to be explored before a power-generating tether can be used in space are delineated.

English, R. E.↗

On-orbit maintenance and repair - New era in space research and industrialization

During the seventies, NASA was developing a multifunction, economical spacecraft complete with ground and spaceborne support equipment, software, and necessary documentation to facilitate a large variety of space missions on a routine and cost effective basis. In order to reduce costs and time requirements, research was conducted to identify new approaches to a reusable, low-cost spacecraft design. The result of these studies was the development of the Multimission Modular Spacecraft (MMS). Three MMS spacecraft are currently operating in orbit. These spacecraft include the two Landsat-D earth resources satellites, Landsat-4 and -5, and the Solar Maximum Mission (SMM) spacecraft. Attention is given to details regarding the MMS, the STS-41C SMM repair mission, and failure modes and component degradation.

Cepollina, F.↗