Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optical telescopes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

James Webb Space Telescope (JWST) Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryogenic Test Program and Results

In 2017, the James Webb Space Telescope Optical Telescope Element and Integrated Science Instrument Module (OTIS) underwent cryogenic optical testing at the Johnson Space Center. In this paper, we summarize the successful execution and results of this 100-day test, which was a major program milestone. We summarize the as-run test configuration and provide a top-level as-run timeline. We also provide the top-level functional, optical, thermal, and operational results from the test. We summarize the key technical issues encountered and the resolution of those issues. The results of the OTIS test indicate that the payload should be fully capable of delivering on JWST's exciting scientific potential.

Kimble, Randy A.↗

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Architecture and Technology

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is the first NASA segmented space telescope and is planned for launch in 201 1. The telescope architecture was recently finalized with the selection of the primary mirror material. This presentation reviews the telescope architecture and discusses the remaining key technological challenges of this element.

Feinberg, Lee D.↗

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Architecture and Technology

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is the first NASA segmented space telescope and is planned for launch in 2011. The telescope architecture was recently finalized with the selection of the primary mirror material. This presentation reviews the telescope architecture and discusses the remaining key technological challenges of this element.

Feinberg, Lee D.↗

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK). and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.

Feinberg, Lee D.↗

Mirror coatings for large aperture UV optical infrared telescope optics

Large space telescope concepts such as LUVOIR and HabEx aiming for observations from far UV to near IR require advanced coating technologies to enable efficient gathering of light with important spectral signatures including those in far UV region down to 90nm. Typical Aluminum mirrors protected with MgF2 fall short of the requirements below 120nm. New and improved coatings are sought to protect aluminum from oxidizing readily in normal environment causing severe absorption and reduction of reflectance in the deep UV. Choice of materials and the process of applying coatings present challenges. Here we present the progress achieved to date with experimental investigations of coatings at JPL and at GSFC and discuss the path forward to achieve high reflectance in the spectral region from 90 to 300nm without degrading performance in the visible and NIR regions taking into account durability concerns when the mirrors are exposed to normal laboratory environment as well as high humidity conditions. Reflectivity uniformity required on these mirrors is also discussed.

Quijada, Manuel↗

Wide-Field Infrared Survey Telescope (WFIRST) - Optical Telescope Assembly (OTA) Status

The WFIRST Mission is the next large astrophysical observatory for NASA after the James Webb Space Telescope and is the top priority mission from the 2010 National Academy of Sciences' decadal survey. The WFIRST OTA includes the inherited primary and secondary mirrors with precision metering structures that are to be integrated to new mirror assemblies to provide optical feeds to the two WFIRST science instruments. We present here: (1) the results for the review of the inherited hardware for WFIRST through a thorough technical pedigree process, (2) the status of the effort to establish the capability of the telescope to perform at a cooler operational temperature of 265K, and (3) the status of the work in requirement development for OTA to incorporate the inherited hardware, and (4) the path forward.

telescopes↗

Looking Back in Time: Building the James Webb Space Telescope (JWST) Optical Telescope Element

When it launches in 2018, the James Webb Space Telescope (JWST) will look back in time at the earliest stars and galaxies forming in the universe. This talk will look back in time at the development of the JWST telescope. This will include a discussion of the design, technology development, mirror development, wave front sensing and control algorithms, lightweight cryogenic deployable structure, pathfinder telescope, and integration and test program evolution and status. The talk will provide the engineering answers on why the mirrors are made of Beryllium, why there are 18 segments, where and how the mirrors were made, how the mirrors get aligned using the main science camera, and how the telescope is being tested. It will also look back in time at the many dedicated people all over the country who helped build it.

JWST OTE↗

The James Webb Space Telescope Mission: Optical Telescope Element Design, Development, and Performance

The James Webb Space Telescope (JWST) is a large, infrared space telescope that has recently started its science program which will enable breakthroughs in astrophysics and planetary science. Notably, JWST will provide the very first observations of the earliest luminous objects in the universe and start a new era of exoplanet atmospheric characterization. This transformative science is enabled by a 6.6 m telescope that is passively cooled with a 5 layer sunshield. The primary mirror is comprised of 18 controllable, low areal density hexagonal segments, that were aligned and phased relative to each other in orbit using innovative image-based wave front sensing and control algorithms. This revolutionary telescope took more than two decades to develop with a widely distributed team across engineering disciplines. We present an overview of the telescope requirements, architecture, development, superb on-orbit performance, and lessons learned. JWST successfully demonstrates a segmented aperture space telescope and establishes a path to building even larger space telescopes.

Infrared observatories↗

Development of a clean optical telescope

Particulate contamination on astronomical mirrors degrades performance in two ways: by information loss by extinction of light; and background and noise from scattering, especially forward or Fraunhofer scattering. These effects were not generally understood, and an ambitious pilot program was outlined to measure particulate effects on telescope optical performance; develop prophylactic and cleaning procedures suitable for groundbased observatories; investigate by computational modelling the effects on telescopes in space; and communicate the results and concerns within the astronomical community.

Brown, R. A.↗

Large space telescope, phase A. Volume 3: Optical telescope assembly

The development and characteristics of the optical telescope assembly for the Large Space Telescope are discussed. The systems considerations are based on mission-related parameters and optical equipment requirements. Information is included on: (1) structural design and analysis, (2) thermal design, (3) stabilization and control, (4) alignment, focus, and figure control, (5) electronic subsystem, and (6) scientific instrument design.

Source record↗

The solar optical telescope

Objectives of the Solar Optical Telescope are to study the physics of the Sun on the scale at which many of the important physical processes occur and to attain a resolution of 73km on the Sun or 0.1 arc seconds of angular resolution. Topics discussed in this overview of the Solar Optical Telescope include: why is the Solar Optical Telescope needed; current picture of the Sun's atmosphere and convection zone; scientific problems for the Solar Optical Telescope; a description of the telescope; the facility - science management, contamination control, and accessibility to the instruments; the scientific instruments - a coordinated instrument package for unlocking the Sun's secrets; parameters of the coordinated instrument package; science operations from the Space Shuttle; and the dynamic solar atmosphere.

Source record↗

JWST Optical Telescope Element Center of Curvature Test

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) completed element level integration and test programs and were integrated to the next level of assembly called OTE/ISIM (OTIS) at Goddard Space Flight Center (GSFC) in Greenbelt, Maryland in 2016. Before shipping the OTIS to Johnson Space Center (JSC) for optical test at cryogenic temperature a series of vibration and acoustic tests were performed. To help ensure that the OTIS was ready to be shipped to JSC an optical center of curvature (CoC) test was performed to measure changes in the mirror's optical performance to verify that the telescope's primary mirror was not adversely impacted by the environmental testing and help us in understanding potential anomalies identified during the JSC tests. The primary is a 6.5 meter diameter mirror consisting of 18 individual hexagonal segments. Each segment is an off-axis asphere. There are a total of three prescriptions repeated six times each. As part of the CoC test each segment was individually measured using a high-speed interferometer (HSI) designed and built specifically for this test. This interferometer is capable of characterizing both static and dynamic characteristics of the mirrors. The latter capability was used, with the aid of a vibration stinger applying a low-level input force, to measure the dynamic characteristic changes of the PM backplane structure. This paper describes the CoC test setup and both static and dynamic test results.

interferometer↗

Use of a Pathfinder Optical Telescope Element for James Webb Space Telescope Risk Mitigation

A Pathfmder of the James Webb Space Telescope (JWST) Optical Telescope Element is being developed to check out critical ground support equipment and to rehearse integration and testing procedures. This paper provides a summary of the baseline Pathfmder configuration and architecture, objectives of this effort, limitations of Pathfinder, status of its development, and future plans. Special attention is paid to risks that will be mitigated by Pathfmder.

Feinberg, Lee D.↗

Science with the solar optical telescope

The Solar Optical Telescope (SOT) is designed to provide the solar physics community with the data necessary for solving several fundamental problems in the energetics and dynamics of the solar atmosphere. Among these problems are questions on the origin and evolution of the sun's magnetic field, heating of the outer solar atmosphere, and sources of the solar wind in the lower lying regions of the outer atmosphere. The SOT will be built under the management of NASA's Goddard Space Flight Center, with science instruments provided by teams led by Principal Investigators. The telescope will be built by the Perkin-Elmer Corporation, and the science instruments selected for the first flight will be provided by the Lockheed Palo Alto Research Laboratory (LPARL) and the California Institute of Technology, with actual construction of a combined science instrument taking place at the LPARL. The SOT has a 1.3-meter-diameter primary mirror that will be capable of achieving diffraction-limited viewing in the visible of 0.1 arc-second. This dimension is less than a hydrodynamic scale-height or a mean-free-path of a continuum photon in the solar atmosphere. Image stability will be achieved by a control system in the telescope, which moves both the primary and tertiary mirrors in tandem, and will be further enhanced by a correlation tracker in the combined science instrument. The SOT Facility is currently scheduled for its first flight on Spacelab at the beginning of the 1990's.

Jordan, S. D.↗

Off-Nominal Planning for the Cryogenic Vacuum Test of the JWST Optical Telescope Element/Integrated Science Instrument Module at JSC

The cryogenic thermal vacuum/thermal balance test of the James Webb Space Telescope (JWST) combined Optical Telescope Element (OTE)/Integrated Science Instrument Module (ISIM), known as the OTIS, at the Johnson Space Center (JSC) Chamber A in 2017 was likely the most complex test ever performed by NASA for an unmanned mission. The test of the combined flight Optical Telescope and ISIM elements was prefaced by years of modifications to chamber facilities, and included three extensive precursor tests of non-flight and flight hardware to establish safe and optimal test operational procedures. One critical part of the test preparation was planning for off-nominal events that could arise, including appropriate responses. In some cases, assurance of personnel and payload safety required modification of original test hardware and procedures which had to be validated before the final test could begin. This planning proved especially prescient for the OTIS test, as Hurricane Harvey struck the Houston area during the test in August 2017, and consequences for the precious payload could have been severe. This paper describes the extent of the thermal off-nominal planning undertaken for the OTIS test, including including safing for hurricanes, and some real-life effects of Hurricane Harvey on the test conduct. Documentation of the consequences and mitigations for these events are discussed. The importance of off-nominal planning for future thermal vacuum/thermal balance tests is illustrated.

Off-Nominal Planning↗