Operational considerations for the use of loran-C skywaves for time synchronization
Time synchronization of loran C navigation system and characteristics of sky wave reception operation
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Time synchronization of loran C navigation system and characteristics of sky wave reception operation
This paper examines the vehicle antenna requirements for mobile satellite systems. The antenna parameters are discussed in the light of the requirements and the limitations in performance imposed by the physical constraints of antenna and by vehicle geometries. Measurements of diffraction and antenna noise temperature in an operational environment are examined, as well as their effects on system margins. Mechanical versus electronic designs are compared with regards to performance, cost, reliability, and design complexity. Comparisons between open-loop and close-loop tracking systems are made and the effects of bandwidth, sidelobe levels, operational constraints, vehicle angular velocity, and acceleration are discussed. Some consideration is given to the use of hybrid systems employing both open and closed-loop tracking. Changes to antenna/terminal specifications are recommended which will provide greater design flexibility and increase the likelihood of meeting the performance and operational requirements.
One lesson learned from Orbiting Maneuvering Vehicle (OMV) program experience is that Design Reference Missions must include an appropriate balance of operations and performance inputs to effectively drive vehicle systems design and configuration. Rendezvous trajectory design is based on vehicle characteristics (e.g., mass, propellant tank size, and mission duration capability) and operational requirements, which have evolved through the Gemini, Apollo, and STS programs. Operational constraints affecting the rendezvous final approach are summarized. The two major objectives of operational rendezvous design are vehicle/crew safety and mission success. Operational requirements on the final approach which support these objectives include: tracking/targeting/communications; trajectory dispersion and navigation uncertainty handling; contingency protection; favorable sunlight conditions; acceptable relative state for proximity operations handover; and compliance with target vehicle constraints. A discussion of the ways each of these requirements may constrain the rendezvous trajectory follows. Although the constraints discussed apply to all rendezvous, the trajectory presented in 'Cargo Transfer Vehicle Preliminary Reference Definition' (MSFC, May 1991) was used as the basis for the comments below.
A technology demonstration of free space optical communication at interplanetary distances is planned via one or more future NASA deep-space missions. Such demonstrations will “pave the way” for operational use of optical communications on future robotic/potential Human missions. Hence, the Deep Space Network architecture will need to evolve. Preliminary attempts to model the anticipated future mission set and simulate how well it loads onto assumed architectures with combinations of RF and optical apertures have been evaluated. This paper discusses the results of preliminary loading simulations for hybrid RF-optical network architectures and highlights key mission and ground infrastructure considerations that emerge.
Laboratory monitoring of the level of oxygen in sample gas mixtures is a process which can be performed with accurate and repeatable results. Operations at the National Transonic Facility require the storage and pumping of large volumes of liquid nitrogen. To protect against the possibility of a fault resulting in a localized oxygen deficient atmosphere, the facility is equipped with a monitoring system with an array of sensors. During the early operational stages, the system produced recurrent alarms, none of which could be traced to a true oxygen deficiency. A thorough analysis of the system was undertaken with primary emphasis placed on the sensor units. These units sense the partial pressure of oxygen which, after signal conditioning, is presented as a % by volume indication at the system output. It was determined that many of the problems experienced were due to a lack of proper accounting for the partial pressure/% by volume relationship, with a secondary cause being premature sensor failure. Procedures were established to consider atmospherically induced partial pressure variations. Sensor rebuilding techniques were examined, and those elements contributing to premature sensor failure were identified. The system now operates with a high degree of confidence and reliability.
Considerable progress has been made in the development of laminar flow technology for commercial transports during the NASA Aircraft Energy Efficiency (ACEE) laminar flow program. Practical, operational laminar flow control (LFC) systems have been designed, fabricated, and are undergoing flight testing. New materials, fabrication methods, analysis techniques, and design concepts were developed and show much promise. The laminar flow control systems now being flight tested on the NASA Jetstar aircraft are complemented by natural laminar flow flight tests to be accomplished with the F-14 variable-sweep transition flight experiment. An overview of some operational aspects of this exciting program is given.
The airship's problems and the possibilities for their solution in a short-haul transportation environment are surveyed. The problems are derived from both past experience and envisioned operation. Problems relative to both fully buoyant and semi-buoyant configurations are considered and their origins in principle discussed. Also addressed in this paper are the state-of-the-art technologies with the potential of providing answers to the airship's operational difficulties.
We have the technical capability to model hybrid deep-space RF and Optical communications networks, but we have little guidance on how the missions and ground architectures will be designed and operated. We exposed several issues that must be resolved before an optimal solution can be reached. With future studies, we may be able to determine solutions to these issues, and perform more precise loading performance analyses to arrive at the most optimal RF and optical ground assets combinations for meeting the projected future demand. The results will then help inform NASA as it plans for infrastructure development to prepare for human/robotic missions in the coming decades.
Preliminary conclusions include: Limits for reverse currents cannot be set. Based on current data we want to avoid any reverse bias current. We know 1 micro-A is too high. Leakage current gets suppressed when operated at 120K. Migration and verification: a) Reverse Bias Voltage will be limited; b) Health check with I/V curve: 1) Minimal reverse voltage shall be x0.75 of the calculated voltage breakdown Vbr; 2) Degradation of the Reverse Bias voltage at given current will be used as indication of ESD incidents or other Damages (high RF power, heat); 3) Calculation of diodes parameter to verify initial health check result in forward direction. RF output power starts to degrade when diode I/V curve is very strongly degraded only. Experienced on 400GHz doubler and 200GHz doubler
The Hubble Space Telescope (HST) launched in April of 1991 with a nominal 15-year old mission. Since then, the HST mission life has been extended to 2010. As is true for all NASA missions, HST is being asked to decrease its operational costs for the remainder of its mission life. Various techniques are being incorporated for cost reductions, with one of the core means being the design of a new and more efficient ground system for HST operations. This new ground system, "Vision 2000", will reduce operational and maintenance costs and also provide the HST Project with added flexibility to react to future changes. Vision 2000 began supporting HST Operations in January of 1999 and will support the mission for the remainder of the mission life. Upgrading a satellite's ground system is a popular approach for reducing costs, but it is also inherently risky. Validating a new ground system can be a severe distraction to a flight team while operating a satellite. Mission data collection and health and safety requirements are rarely, if ever, relaxed during this validation period, forcing flight teams to undertake an additional task while operating the satellite. Additionally, flight teams must usually undergo extensive training to effectively utilize the new system. Once again, this training usually occurs as an additional task, in addition to the nominal satellite operations. While operating the spacecraft, the Flight Team typically assists in the design, validation, and verification of a new ground system. This is a distraction and strain on the Flight Team, but the benefit of using the Flight Team in all phases of ground system development far outweigh the negative aspects. Finally, above the cost of the new system, the integration into the facility with the current control center system are resources and costs not normally taken into account in the design phase of the new system. In addition to the standard issues faced by a Project when upgrading its ground system, the HST Project also must continue to support Space Shuttle servicing missions, which occur approximately every two to three years. This paper will address many of the issues common to all missions when re-hosting ground systems, and those faced by the HST Project in particular.
Transportation of people and cargo between low Earth orbit and the surface of the Moon will be one of the most important elements in a lunar base program. This paper identifies some of the important lessons from the space shuttle program and discusses their application in future lunar vehicle operations. Also, some unique challenges in flight planning, training, vehicle servicing, payload integration, and flight control for lunar transportation are outlined. This paper relies heavily on recent studies of space shuttle development and operations with the goal of applying shuttle experience in the design of a practical and efficient lunar transportation system.
The Lagged Average Forecast (LAF) method differs from the Monte Carlo Forecast (MCF) method in the definition of the ensemble of initial states which are used to generate the ensemble of forecasts. The LAF initial states are the current analysis and the forecasts made from previous analyses verifying the current time. Thus the LAF ensemble is composed of forecasts which are made by a regular operational system of numerical weather prediction and the LAF method is therefore operationally attractive. The application of the authors' previous ideas and results to an operational model requires the resolution of what might be called the degrees of freedom problem, i.e., how to obtain a homogeneous sample large enough to calculate stable statistics. It is suggested that this problem may be solved by carefully modeling the required statistics in terms of a small set of parameters and then estimating only these few parameters from the data. It is noted that there may be considerable information in each initial ensemble relating to the predictability of each particular case, and that this information may be incorporated in the model of the statistics.
The specific electrical discharge problems that can directly affect the shuttle vehicle and its payloads are addressed. General design guidelines are provided to assist flight hardware managers in minimizing these kinds of problems. Specific data are included on workmanship practices and system testing while in low pressure environments. Certain electrical discharge problems that may be unique to the design of the shuttle vehicle itself and to its various mission operational models are discussed.
This paper presents a study of ballistic lunar transfer (BLT) trajectories from Earth launch to insertion into a near rectilinear halo orbit (NRHO). BLTs have favorable properties for uncrewed launches to orbits in the vicinity of the Moon, such as dramatically reduced spacecraft ΔV requirements. Results are described from a detailed set of related mission design studies: BLTs with and without an outbound lunar flyby, insertion and rendezvous of a single spacecraft with a target in an NRHO, and insertion and rendezvous of multiple spacecraft with a target NRHO in quick succession. Monte Carlo analyses are presented of simulated rendezvous operations with realistic errors. These analyses are presented to inform future missions to NRHOs.
The United States (U.S.) space exploration policy has directed the National Aeronautics and Space Administration (NASA) to retire the Space Shuttle and to replace it with a new generation of space transportation systems for crew and cargo travel to the International Space Station, the Moon, Mars, and beyond. As part of the Constellation Program, engineers at NASA's Marshall Space Flight Center in Huntsville, Alabama are working to design and build the Ares I, the first of two large launch vehicles to return humans to the Moon. A deliberate effort is being made to ensure a high level of operability in order to significantly increase safety and availability as well as reduce recurring costs of this new launch vehicle. It is the Ares Project's goal to instill operability as part of the requirements development, design and operations of the vehicle. This paper will identify important factors in launch vehicle design that affect the operability and availability of the system. Similarities and differences in operational constraints will also be compared between the Saturn V, Space Shuttle and current Ares I design. Finally, potential improvements in operations and operability for large launch vehicles will be addressed. From the examples presented, the paper will discuss potential improvements for operability for future launch vehicles.
Liquid hydrogen used as heat sink for turbine cooling in high temperature turbojet engine
Performance requirements for commercial short haul STOL transport aircraft
Research in the application of remotely sensed data from LANDSAT or other airborne platforms to the efficient management of a large timber based forest industry was divided into three phases: (1) establishment of a photo/ground sample correlation, (2) investigation of techniques for multi-spectral digital analysis, and (3) development of a semi-automated multi-level sampling system. To properly verify results, three distinct test areas were selected: (1) Jacksonville Mill Region, Lower Coastal Plain, Flatwoods, (2) Pensacola Mill Region, Middle Coastal Plain, and (3) Mississippi Mill Region, Middle Coastal Plain. The following conclusions were reached: (1) the probability of establishing an information base suitable for management requirements through a photo/ground double sampling procedure, alleviating the ground sampling effort, is encouraging, (2) known classification techniques must be investigated to ascertain the level of precision possible in separating the many densities involved, and (3) the multi-level approach must be related to an information system that is executable and feasible.