Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Space Station assembly sequence planning - An engineering and operational challenge

This paper discusses the Space Station assembly sequence planning and development process. It presents the planning methodologies from both historial and current perspectives. It is shown that planning the assembly sequence is a new and unique challenge and its solution requires the simultaneous satisfaction of many diverse variables and constants. The considerations which influence the development of the assembly sequence include launch vehicle integration and lift capabilities, on-orbit assembly flight operations, vehicle flight dynamics, spacecraft system capabilities and resource availability. Many of these considerations are described in this paper. In addition, the examples presented demonstrate the current process for assembly sequence planning and show many of the complex trade-offs that must be performed.

Kaidy, James T.↗

NASA Commercial Crew Program and Medical Operational Challenges

BACKGROUND: NASA embarked on the Commercial Crew Program to launch astronauts into low-earth orbit from US soil and dock with the International Space Station (ISS). The eventual industry providers selected were SpaceX (SpX) and Boeing. These commercial transportation systems are vital to ensure crew availability on ISS for research and discovery. OVERVIEW: NASA/SpaceX Demo-2 (DM2) mission launched from the Kennedy Space Center in 2020 as the historic first crewed test-flight of the Crew Dragon spacecraft with two NASA Astronauts onboard. DM2 represented the first flight in 9-years from US soil since STS-135 in 2011. The 63-day mission ended with splashdown in the Gulf of Mexico, the first US water recovery in 45-years since Apollo-Soyuz. Validation of system hardware and operations allowed four-person crews to launch on subsequently missions (Crew-1, Crew-2, Crew-3, Crew-4, Crew-5 to date), which included International Partner crewmembers. DISCUSSION: A multitude of operational, training, medical, and technical issues needed to be addressed between NASA Medical Operations, the commercial provider SpaceX, and the Department of Defense. These included Flight rule development, occupant protection, pressurized suit testing, communication plans during mission phases, and emergency simulations for supporting Flight Surgeons and Biomedical Engineers. In providing crew experience with expected launch and entry G-force profile, Centrifuge training was established. Preventive health measures via the Health Stabilization Program were especially vital during the global COVID-19 pandemic. Unique aspects arise for SpX Dragon parachute splashdown and shipboard recovery operations in the Atlantic Ocean and Gulf of Mexico. The new Commercial Crew Program is indeed a wonderfully challenging and exciting era for human spaceflight.

Joseph P Dervay↗

Magellan mission to Venus - Radar system design and operational challenges

The Magellan radar mission to Venus was launched in May 1989 and placed into orbit around Venus in August 1990. After several weeks of check-out including two complete signal loss events from the spacecraft, the mission began collecting data from the radar instrument in the three modes of synthetic aperture, altimetry, and passive radiometry. The author presents an overview of the mission and shows some results, concentrating on the engineering aspects of the results. He also describes how the many challenges were overcome and the system was adapted to the realities of Venus and the radar system that is being used to map the planet. It is concluded that this mission has presented many lessons learned about not only the design of an imaging and altimetric radar system but also the adaptation of this design to the mission operational constraints.

Johnson, William T. K.↗

Downhole Microseismic Mapping of More Than 400 Fracturing Stages on a Multiwell Pad at the Hydraulic Fracturing Test Site (HFTS): Discussion of Operational Challenges and Analytic Results

The United States Department of Energy co-funded a joint industry project (JIP) in the Midland basin of Texas. The project was conducted in the Wolfcamp formation to better understand the relationships among horizontal lateral placement, production interference between laterals, effectiveness of completion sequences, and hydraulic fracture geometry in unconventional reservoirs. Downhole microseismic data was acquired from more than 400 fracturing stages during the completion project to better understand the generated hydraulic fracture geometries. Eleven horizontal wells were drilled in the upper Wolfcamp (UW) and middle Wolfcamp (MW) formation in the Permian Basin. The 10,000-ft laterals were drilled in a chevron pattern to help improve inter-well fracture communication and maximize hydrocarbon recovery. The completions sequences were planned to restrain fracture height growth upward into a lower-pressure zone using a combination of zipper fracturing and simultaneous fracturing operations. Downhole microseismic monitoring was used to record more than 95% of the planned fracture stages. Downhole tiltmeters were also used to validate upward fracture height growth. Multiple geophone arrays, both vertical and horizontal, were used during this completion; this paper discusses coordination between maintaining completion efficiency and obtaining microseismic data. Additionally, this paper highlights the completion challenges associated with collecting diagnostic data along with results and findings.

Stegent, Neil A.↗

Cost efficient operations: Challenge from NASA administrator and lessons learned from hunting sacred cows

The conclusions and recommendations that resulted from NASA's Hunting Sacred Cows Workshop are summarized, where a sacred cow is a belief or assumption that is so well established that it appears to be unreasonably immune to criticism. A link was identified between increased complexity and increased costs, especially in relation to automation and autonomy. An identical link was identified for outsourcing and commercialization. The work of NASA's Cost Less team is reviewed. The following conclusions were stated by the Cost Less team and considered at the workshop: the way Nasa conducts business must change; NASA makes its best contributions to the public areas not addressed by other government organizations; the management tool used for the last 30 years is no longer suitable; the most important work on any program or project is carried out before the development or operations stages; automation should only be used to achieve autonomy if the reasons for automation are well understood, and NASA's most critical resources are its personnel.

Hornstein, Rhoda Shaller↗

Operational Challenges In TDRS Post-Maneuver Orbit Determination

The GSFC Flight Dynamics Facility (FDF) is responsible for daily and post maneuver orbit determination for the Tracking and Data Relay Satellite System (TDRSS). The most stringent requirement for this orbit determination is 75 meters total position accuracy (3-sigma) predicted over one day for Terra's onboard navigation system. To maintain an accurate solution onboard Terra, a solution is generated and provided by the FDF Four hours after a TDRS maneuver. A number of factors present challenges to this support, such as maneuver prediction uncertainty and potentially unreliable tracking from User satellities. Reliable support is provided by comparing an extended Kalman Filter (estimated using ODTK) against a Batch Least Squares system (estimated using GTDS).

FDF↗

NASA's Analog Missions: Driving Exploration Through Innovative Testing

Human exploration beyond low-Earth orbit (LEO) will require a unique collection of advanced, innovative technologies and the precise execution of complex and challenging operational concepts. One tool we in the Analog Missions Project at the National Aeronautics and Space Administration (NASA) utilize to validate exploration system architecture concepts and conduct technology demonstrations, while gaining a deeper understanding of system-wide technical and operational challenges, is our analog missions. Analog missions are multi-disciplinary activities that test multiple features of future spaceflight missions in an integrated fashion to gain a deeper understanding of system-level interactions and integrated operations. These missions frequently occur in remote and extreme environments that are representative in one or more ways to that of future spaceflight destinations. They allow us to test robotics, vehicle prototypes, habitats, communications systems, in-situ resource utilization, and human performance as it relates to these technologies. And they allow us to validate architectural concepts, conduct technology demonstrations, and gain a deeper understanding of system-wide technical and operational challenges needed to support crewed missions beyond LEO. As NASA develops a capability driven architecture for transporting crew to a variety of space environments, including the moon, near-Earth asteroids (NEA), Mars, and other destinations, it will use its analog missions to gather requirements and develop the technologies that are necessary to ensure successful human exploration beyond LEO. Currently, there are four analog mission platforms: Research and Technology Studies (RATS), NASA s Extreme Environment Mission Operations (NEEMO), In-Situ Resource Utilization (ISRU), and International Space Station (ISS) Test bed for Analog Research (ISTAR).

Reagan, Marcum L.↗

Operating Dynamic Reserve Dimensioning Using Probabilistic Forecasts

The rapid integration of variable energy sources (VRES) into power grids increases variability and uncertainty of the net demand, making the power system operation challenging. Operating reserve is used by system operators to manage and hedge against such variability and uncertainty. Traditionally, reserve requirements are determined by rules-of-thumb (static reserve requirements, e.g., NERC Reliability Standards), and more recently, dynamic reserve requirements from tools and methods which are in the adoption process (e.g., DynADOR, DRD, and RESERVE, among others). While these methods/tools significantly improve the static rule-of-thumb approaches, they rely exclusively on deterministic data (i.e., best guess only). Consequently, these methods disregard the probabilistic uncertainty thresholds associated with specific days and their weather conditions (i.e., best guess plus probabilistic uncertainty). This work presents practical approaches to determine the operating reserve requirements leveraging the wealth information from probabilistic forecasts. Proposed approaches are validated and tested using actual data from the CAISO system. Furthermore, results show the benefits in terms of risk reduction of considering the probabilistic forecast information into the dimensioning process of operating reserve requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lunar Prospecting: Searching for Volatiles at the South Pole

The Resource Prospector is an in-situ resource utilization (ISRU) technology demonstration mission, planned for a 2021 launch to search for and analyze volatiles at the Lunar South Pole. The mission poses unique operational challenges. Operating at the Lunar South Pole requires navigating a surface with lighting, shadow and regolith characteristics unlike those of previous missions. The short round trip communications time enables reactive surface operations for science and engineering. Navigation of permanently shadowed regions with a solar powered rover creates risks, including power and thermal management, and requires constant real time decision making for safe entry, path selection and egress. The mission plan requires a faster rover egress from the lander than any previous NASA rover mission.

operations↗