Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Entry, Descent, and Landing Operations Analysis for the Genesis Re-Entry Capsule

On September 8, 2004, the Genesis spacecraft returned to Earth after spending 29 months about the sun-Earth libration point collecting solar wind particles. Four hours prior to Earth arrival, the entry capsule containing the samples was released for entry and subsequent landing at the Utah Test and Training Range. This paper provides an overview of the entry, descent, and landing trajectory analysis that was performed during the Mission Operations Phase leading up to final approach to Earth. The operations effort accurately delivered the entry capsule to the desired landing site. The final landing location was 8.3 km from the target, and was well within the allowable landing area. Preliminary reconstruction analyses indicate that the actual entry trajectory was very close to the pre-entry prediction.

Desai, Prasun N.↗

Entry, Descent, and Landing Operations Analysis for the Genesis Entry Capsule

On September 8, 2004, the Genesis spacecraft returned to Earth after spending 29 months about the sun-Earth libration point (L1) collecting solar wind particles. Four hours prior to Earth arrival, the sample return capsule containing the samples was released for entry and subsequent landing at the Utah Test and Training Range. This paper provides an overview of the entry, descent, and landing trajectory analysis that was performed during the mission operations phase leading up to final approach to Earth. The final orbit determination solution produced an inertial entry flight-path angle of -8.002 deg (which was the desired nominal value) with a 3-sigma error of +/-0.0274 deg (a third of the requirement). The operations effort accurately delivered the entry capsule to the desired landing site. The final landing location was 8.3 km from the target, and was well within the allowable landing area. Overall, the Earth approach operation procedures worked well and there were no issues (logistically or performance based) that arose. As a result, the process of targeting a capsule from deep space and accurately landing it on Earth was successfully demonstrated.

Desai, Prasun N.↗

Simulated Wake Characteristics Data for Closely Spaced Parallel Runway Operations Analysis

A simulation experiment was performed to generate and compile wake characteristics data relevant to the evaluation and feasibility analysis of closely spaced parallel runway (CSPR) operational concepts. While the experiment in this work is not tailored to any particular operational concept, the generated data applies to the broader class of CSPR concepts, where a trailing aircraft on a CSPR approach is required to stay ahead of the wake vortices generated by a lead aircraft on an adjacent CSPR. Data for wake age, circulation strength, and wake altitude change, at various lateral offset distances from the wake-generating lead aircraft approach path were compiled for a set of nine aircraft spanning the full range of FAA and ICAO wake classifications. A total of 54 scenarios were simulated to generate data related to key parameters that determine wake behavior. Of particular interest are wake age characteristics that can be used to evaluate both time- and distance- based in-trail separation concepts for all aircraft wake-class combinations. A simple first-order difference model was developed to enable the computation of wake parameter estimates for aircraft models having weight, wingspan and speed characteristics similar to those of the nine aircraft modeled in this work.

Guerreiro, Nelson M.↗

Operations analysis (study 2.1): Payload designs for space servicing

Potential modes of operating in space in the space shuttle era are documented. The October 1973 NASA Mission Model provides a definition of various NASA and non-DOD automated payload configurations when employed in an expendable mode. The model also specifies a launch schedule for initial deployment of payloads as well as for subsequent replacements at periodic cycles. This model and its associated payload definitions serve as a foundation for the data presented in this report. The reference model has been revised to reflect automated space servicing of payloads as an operational concept instead of the existing expendable approach. The indication is that the bulk of a payload's subsystems and mission equipment require no support over the lifetime of the program. However, failure of a single unit could result in loss of the mission objectives. When space servicing is employed, the approach is to replace only that unit causing the anomaly. This concept affords an opportunity to standardize space replacable units, as well as to reduce the expense of logistics support, by allowing multiple servicing on any single upper stage/shuttle flight.

Wolfe, R. R.↗

Operations analysis (study 2.1). Volume 1: Executive summary

Subjects related to future STS operations concepts were investigated. The majority of effort was directed at assessing the benefits of automated space servicing concepts as related to improvements in payload procurement and shuttle utilization. Another subject was directed at understanding shuttle upper stage software development and recurring costs relative to total program projections. Space serving of automated payloads is addressed by examining the broad spectrum of payload applications with the belief that shared logistic operations will be a major contributor to reduction of future program costs. However, there are certain requirements for support of payload operations, such as availability of the payload, that may place demands upon the shuttle fleet. Because future projections of the NASA Mission Model are only representative of the payload traffic, it is important to recognize that it is the general character of operations that is significant rather than service to any single payload program.

Wolfe, R. R.↗

ICN Deicing Operations Analysis

Aircraft deicing and anti-icing on airport ground in winter weather conditions is important to ensure safe departure takeoff and enroute flying. At the same time, it imposes additional workload to controllers and airport operators, and causes delays to airlines and passengers.This presentation shows the initial results of analyzing the deicing related operations at Incheon International Airport (ICN). It describes the deicing operations concept, procedures, and deicing making processes at ICN. It also looks into the three-month ICN operation data from Dec 2015 to Feb 2016 to identify the characteristics of the current day deicing operation.This work is under the joint collaboration between Korea Aerospace Research Institute and NASA. The objective is to develop a deicing operation simulation capability in NASA's fast time simulation environment to study and improve deicing operations efficiency.

Airport Surface ATM↗

Entry, Descent, and Landing Operations Analysis for the Stardust Re-Entry Capsule

On the morning of January 15, 2006, the Stardust capsule successfully landed at the Utah Test and Training range in northwest Utah returning cometary samples from the comet Wild-2. An overview of the entry, descent, and landing (EDL) trajectory analysis that was performed for targeting during the Stardust Mission Navigation Operations Phase upon final approach to Earth is described. In addition, how the predicted landing location and the resulting overall 99 percentile landing footprint ellipse obtained from a Monte Carlo analysis changed over the final days and hours prior to entry is also presented. The navigation and EDL operations effort accurately delivered the entry capsule to the desired landing site. The final landing location was 8.1 km from the target, which was well within the allowable landing area.

Desao, Prasun N.↗

Entry, Descent, and Landing Operations Analysis for the Stardust Entry Capsule

On the morning of January 15, 2006, the Stardust capsule successfully landed at the Utah Test and Training range in northwest Utah returning cometary samples from the comet Wild-2. An overview of the entry, descent, and landing (EDL) trajectory analysis that was performed for targeting during the mission operations phase upon final approach to Earth is described. The final orbit determination solution produced an inertial entry flight-path angle of -8.21 deg (the desired nominal value) with a 3-sigma uncertainty of +/-0.0017 deg (2% of the requirement). The navigation and EDL operations effort accurately delivered the entry capsule to the desired landing site. The final landing location was 8.1 km from the target, which was well within the allowable landing area. Overall, the Earth approach operation procedures worked well and there were no issues (logistically or performance based) that arose. As a result, the process of targeting a capsule from an interplanetary trajectory and accurately landing it on Earth was successfully demonstrated.

Desai, Prasun N.↗

Space Operations Analysis Using the Synergistic Engineering Environment

The Synergistic Engineering Environment has been under development at the NASA Langley Research Center to aid in the understanding of the operations of spacecraft. This is accomplished through the integration of multiple data sets, analysis tools, spacecraft geometric models, and a visualization environment to create an interactive virtual simulation of the spacecraft. Initially designed to support the needs of the International Space Station, the SEE has broadened the scope to include spacecraft ranging from low-earth orbit to deep space missions. Analysis capabilities within the SEE include rigid body dynamics, kinematics, orbital mechanics, and payload operations. This provides the user the ability to perform real-time interactive engineering analyses in areas including flight attitudes and maneuvers, visiting vehicle docking scenarios, robotic operations, plume impingement, field of view obscuration, and alternative assembly configurations. The SEE has been used to aid in the understanding of several operational procedures related to the International Space Station. This paper will address the capabilities of the first build of the SEE, present several use cases of the SEE, and discuss the next build of the SEE.

Angster, Scott↗

Operational Analysis of Vertiport Surface Topology

Urban Air Mobility (UAM) concepts and technologies are being developed to safely enable operations of small, electric-powered or hybrid, pilot-optional, vertical-takeoff-and-landing (VTOL) passenger and cargo aircraft at vertiport facilities in urban and suburban environments. It is likely that many of the highest demand locations for vertiports will be in space constrained urban environments, requiring vertiport designs to maximize throughput within a compact surface footprint. This paper presents several generic vertiport topology design approaches and evaluates their relative surface area utilization and operational efficiency under different wind constrained configurations while meeting safety driven spacing constraints derived from heliport design standards and subject matter expert interviews.

Urban air mobility↗

Operations analysis (study 2.1): Shuttle upper stage software requirements

An investigation of software costs related to space shuttle upper stage operations with emphasis on the additional costs attributable to space servicing was conducted. The questions and problem areas include the following: (1) the key parameters involved with software costs; (2) historical data for extrapolation of future costs; (3) elements of the basic software development effort that are applicable to servicing functions; (4) effect of multiple servicing on complexity of the operation; and (5) are recurring software costs significant. The results address these questions and provide a foundation for estimating software costs based on the costs of similar programs and a series of empirical factors.

Wolfe, R. R.↗

Pilot Situation Awareness and Its Implications for Single Pilot Operations: Analysis of a Human-In-The-Loop Study

In 2012, NASA began exploring the feasibility of single pilot/reduced crew operations in the context of scheduled air carrier operations. The current study examined how important it was for ground-based personnel providing support to single piloted aircraft (ground operators) to have opportunities to acquire situation awareness (SA) prior to being called on to assist an aircraft. We looked at two distinct concepts of operation, which varied in how much information was available to ground operators prior to being called on to assist a critical event (no vs. some Situation Preview). Thirty-five commercial pilots participated in the current study. Results suggested that a ground operators’ lack of initial SA when called on for dedicated assistance is not an issue, at least when the ground operator station displays environmental and systems data which are important to gaining overall SA of the specified aircraft. With appropriate displays, ground operators were able to provide immediate assistance, even if they had minimal SA prior to getting a request.

Reduced crew operations↗

Entry, Descent, and Landing Operations Analysis for the Mars Phoenix Lander

The Mars Phoenix lander was launched August 4, 2007 and remained in cruise for ten months before landing in the northern plains of Mars in May 2008. The one-month Entry, Descent, and Landing (EDL) operations phase prior to entry consisted of daily analyses, meetings, and decisions necessary to determine if trajectory correction maneuvers and environmental parameter updates to the spacecraft were required. An overview of the Phoenix EDL trajectory simulation and analysis that was performed during the EDL approach and operations phase is described in detail. The evolution of the Monte Carlo statistics and footprint ellipse during the final approach phase is also provided. The EDL operations effort accurately delivered the Phoenix lander to the desired landing region on May 25, 2008.

Prince, Jill L.↗

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

Electrification Futures Study: Operational Analysis of U.S. Power Systems with Increased Electrification and Demand-Side Flexibility

This report provides a high-resolution U.S. national-scale power systems assessment of scenarios with widespread electrification using detailed grid simulations. We find that high electrification scenarios envisioned in the Electrification Futures Study can be operated at the hourly level to meet future increased levels of electrified demand and, under the most aggressive cases, with up to 66% of generation from wind and solar technologies. The analysis also examines the value of flexibility from demand by supporting system operability under high electrification and high renewable systems. Demand-side flexibility—especially flexibility from newly electrified loads—is found to enhance the operational efficiency by reducing VRE curtailment and increasing utilization of generators with lower operating costs. It can also enhance the ability of electrification to decarbonize the energy sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Propulsion Technology Lifecycle Operational Analysis

The paper presents the results of a focused effort performed by the members of the Space Propulsion Synergy Team (SPST) Functional Requirements Sub-team to develop propulsion data to support Advanced Technology Lifecycle Analysis System (ATLAS). This is a spreadsheet application to analyze the impact of technology decisions at a system-of-systems level. Results are summarized in an Excel workbook we call the Technology Tool Box (TTB). The TTB provides data for technology performance, operations, and programmatic parameters in the form of a library of technical information to support analysis tools and/or models. The lifecycle of technologies can be analyzed from this data and particularly useful for system operations involving long running missions. The propulsion technologies in this paper are listed against Chemical Rocket Engines in a Work Breakdown Structure (WBS) format. The overall effort involved establishing four elements: (1) A general purpose Functional System Breakdown Structure (FSBS). (2) Operational Requirements for Rocket Engines. (3) Technology Metric Values associated with Operating Systems (4) Work Breakdown Structure (WBS) of Chemical Rocket Engines The list of Chemical Rocket Engines identified in the WBS is by no means complete. It is planned to update the TTB with a more complete list of available Chemical Rocket Engines for United States (US) engines and add the Foreign rocket engines to the WBS which are available to NASA and the Aerospace Industry. The Operational Technology Metric Values were derived by the SPST Sub-team in the form of the TTB and establishes a database for users to help evaluate and establish the technology level of each Chemical Rocket Engine in the database. The Technology Metric Values will serve as a guide to help determine which rocket engine to invest technology money in for future development.

Robinson, John W.↗

Operational Analysis in the Launch Environment

The launch environment is a challenging regime to work due to changing system dynamics, changing environmental loading, joint compression loads that cannot be easily applied on the ground, and control effects. Operational testing is one of the few feasible approaches to capture system level dynamics since ground testing cannot reproduce all of these conditions easily. However, the most successful applications of Operational Modal Testing involve systems with good stationarity and long data acquisition times. This paper covers an ongoing effort to understand the launch environment and the utility of current operational modal tools. This work is expected to produce a collection of operational tools that can be applied to non-stationary launch environment, experience dealing with launch data, and an expanding database of flight parameters such as damping. This paper reports on recent efforts to build a software framework for the data processing utilizing existing and specialty tools; understand the limits of current tools; assess a wider variety of current tools; and expand the experience with additional datasets as well as to begin to address issues raised in earlier launch analysis studies.

James, George↗

Operations analysis of gravity assisted rapid transit

Gravity assisted rapid transit (GART) with 6 percent grades before and after each station are compared with conventional systems in terms of energy consumption, run time, line capacity and schedule stability under abnormal circumstances. Parametric analyses of run times and energy consumption include the impact of alternate accelerating and braking levels. The capcity analysis uses a network simulation program to determine the location and severity of all signal delays. Based on results of initial simulations, the block design was revised to eliminate bottlenecks in normal operations. The systems are then compared at headways of 80 to 180 seconds. One month of incidence reports of a modern operating transit system are reviewed to determine the failures to be simulated. The impact of failures resulting in station delays (30 to 360 seconds), speed limit reduction (20 mph and 30 mph to one or more trains), vehicle performance (75 percent acceleration) are compared at scheduled headway of 90 to 180 seconds.

Source record↗