Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mission adaptation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Deep Impact Sequence Planning Using Multi-Mission Adaptable Planning Tools With Integrated Spacecraft Models

The Deep Impact mission was ambitious and challenging. JPL's well proven, easily adaptable multi-mission sequence planning tools combined with integrated spacecraft subsystem models enabled a small operations team to develop, validate, and execute extremely complex sequence-based activities within very short development times. This paper focuses on the core planning tool used in the mission, APGEN. It shows how the multi-mission design and adaptability of APGEN made it possible to model spacecraft subsystems as well as ground assets throughout the lifecycle of the Deep Impact project, starting with models of initial, high-level mission objectives, and culminating in detailed predictions of spacecraft behavior during mission-critical activities.

Deep Impact Mission↗

Deep impact sequence planning using multi-mission adaptable planning tools with integrated spacecraft models

The Deep Impact mission was ambitious and challenging. JPL's well proven, easily adaptable multi-mission sequence planning tools combined with integrated spacecraft subsystem models enabled a small operations team to develop, validate, and execute extremely complex sequence-based activities within very short development times. This paper focuses on the core planning tool used in the mission, APGEN. It shows how the multi-mission design and adaptability of APGEN made it possible to model spacecraft subsystems as well as ground assets throughout the lifecycle of the Deep Impact project, starting with models of initial, high-level mission objectives, and culminating in detailed predictions of spacecraft behavior during mission-critical activities.

Seybold, Calina C.↗

Viking adaptive mission sequence and control operations

Viking mission operations were required to provide an adaptive sequencing capability in which future observations could be influenced by the latest information about Mars as it was obtained and analyzed. The mission operations strategy that was developed met this requirement and provided the capability to respond smoothly and efficiently to spacecraft subsystem anomalies with minimum impact on the science data gathering process. A description of the major elements of this adaptive man-in-the-loop control system is provided. Specific cases showing how it was utilized to enhance scientific return and to respond to spacecraft anomalies are also provided.

Larman, B. T.↗

Atmosphere explorer /AE-C/ adaptive mission design and trajectory performance

The preflight mission design and in-flight execution are presented to illustrate the actual utilization of the adaptive nature of this mission. Spacecraft systems (propulsion, attitude, accelerometer) and software (maneuver program) features which contribute to the adaptive trajectory flexibility are discussed. Descriptions of procedures used to handle low perigee maneuver operations (to 130 km), for achieving ground track control and orbit phasing, for making a transition from elliptical to circular orbits, and for circular orbit restoration and maintenance are presented in detail. The 85 maneuvers made during the first 17 months of the mission are summarized.

Barbieri, R. W.↗

Mariner Mars 1971 adaptive mission planning.

A formal mission-planning process was developed for the Mariner Mars 1971 missions to allow large-scale mission-plan changes based upon flight experience. A modular approach was taken to the definition of requirements and constraints for elements of the mission. A set of rules for combining these modules was established. The concept of a standard mission day was developed in order to provide a consistent time framework for operations. The resulting process allowed for major mission revisions after the failure of Mariner 8 and again after a dust storm had obscured Mars. It allowed adaptive science planning on a short-term turnaround basis throughout the mission.

Haynes, N. R.↗

Mission Adaptive Wing

This document looks at an aircraft wing that can change shape in flights from a flat to curved surface according to the necessary flight mode.

Source record↗

Reduction of structural loads using maneuver load control on the Advanced Fighter Technology Integration (AFTI)/F-111 mission adaptive wing

A transonic fighter-bomber aircraft, having a swept supercritical wing with smooth variable-camber flaps was fitted with a maneuver load control (MLC) system that implements a technique to reduce the inboard bending moments in the wing by shifting the spanwise load distribution inboard as load factor increases. The technique modifies the spanwise camber distribution by automatically commanding flap position as a function of flap position, true airspeed, Mach number, dynamic pressure, normal acceleration, and wing sweep position. Flight test structural loads data were obtained for loads in both the wing box and the wing root. Data from uniformly deflected flaps were compared with data from flaps in the MLC configuration where the outboard segment of three flap segments was deflected downward less than the two inboard segments. The changes in the shear loads in the forward wing spar and at the roots of the stabilators also are presented. The camber control system automatically reconfigures the flaps through varied flight conditions. Configurations having both moderate and full trailing-edge flap deflection were tested. Flight test data were collected at Mach numbers of 0.6, 0.7, 0.8, and 0.9 and dynamic pressures of 300, 450, 600, and 800 lb/sq ft. The Reynolds numbers for these flight conditions ranged from 26 x 10(exp 6) to 54 x 10(exp 6) at the mean aerodynamic chord. Load factor increases of up to 1.0 g achieved with no increase in wing root bending moment with the MLC flap configuration.

Thornton, Stephen V.↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

Automated Reconfigurable Mission Adaptive Digital Assembly Systems (ARMADAS)

To meet the needs of future deep space exploration, NASA is interested in large-scale hardware systems in the agency’s thrust areas of solar power, communications, habitats and science interests. Scalable in-space assembly of physical systems is critical to massless exploration and in-space reliance goals. The ARMADAS project demonstrates the autonomous assembly of digital materials and structures. This provides automation technologies with potential for meeting long duration and deep space infrastructure needs, such as construction and maintenance of long duration spaceport, surface infrastructure, and habitat scale systems. Project demonstrations to date include a system that can fit into a small satellite-sized payload, which automatically assembles into primary structures, such as a small habitat module or array/antenna, using onboard robotic assemblers.

In Space Assembly↗