Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mini-grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

26 records · Page 2

Providencia Island White Papers: Overview of Technical Requirements for Interconnection

This issue brief provides an overview of key technical requirements for inverter-based resources - including distributed energy resources (DERs) - to support the reliable and safe operation of the Providencia Island electrical grid, and other island or isolated area mini-grid applications. With the planned increase in inverter-based resources and the introduction of energy storage, adopting Institute of Electrical and Electronics Engineers (IEEE) Std 1547-2018, including the more advanced performance capabilities for voltage and frequency ride-through, will simplify interconnection as well as help to maintain a safe, reliable grid on Providencia Island.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adapte Agrivoltayik Pou Mini-Rezo Sole Ann Ayiti

Ak mwens pase 2% nan popilasyon riral la ki gen akse a elektrisite ak preske mwatye popilasyon an ap fe fas ak grangou egi, Ayiti fe fas a defi entekonekte nan povrete eneji ak ensekirite alimante. Yon solisyon pou ede abode povrete eneji ann Ayiti se devlopman mini-griy sole distribiye, sitou sole. Sepandan, souvan te ki pi byen adapte pou deplwaye jenerasyon sole se tou pi byen adapte pou agrikilti pa ti femye yo, kidonk kreye yon tansyon potansyelman konplike ant akse eneji ak sekirite manje. Pou adrese tansyon sa a, devlope sole yo, espesyalis agrikol yo ak cheche yo ap egzamine ansanm yon nouvo solisyon ki rele "agrivoltayik". Agrivoltaics se yon solisyon pataje te-itilize ki rapidman elaji nan mache sole etabli tankou Etazini, Ewop, ak Azi ki pe sole ak agrikilti, pwodwi elektrisite ak bay espas pou rekot ak bet patiraj anba ak ant panno. Nan kad Patenarya Akse Eneji pou Ayiti a ak Ajans Ameriken pou Devlopman Entenasyonal (USAID), Laboratwa Nasyonal Eneji Renouvlab (NREL) te fe yon premye analiz posibilite ak pwoje angajman pati konsene yo pou evalye potansyel agrivoltayik nan konteks mini-gri an Ayiti. Analiz la te konsidere mini-grid tipik 100-kW ak pi gwo 1-MW nan vil atrave Ayiti epi li te devlope de egzanp arketip agrivoltaik ki baze sou kontribisyon lokal kle yo, ki gen ladan irradians sole, done pwodiksyon ki soti nan resansman agrikol la, pri sou mache a, entevyou ak moun ki gen entere yo, ak ki egziste deja, rechech agrivoltayik. See NREL/TP-7A40-88444 for the English translation of this document.

14 SOLAR ENERGY↗

Hualapai Tribal Utility Development Project

The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Simulation of a Lunar Surface Base Power Distribution Network for the Constellation Lunar Surface Systems

The Lunar Surface Power Distribution Network Study team worked to define, breadboard, build and test an electrical power distribution system consistent with NASA's goal of providing electrical power to sustain life and power equipment used to explore the lunar surface. A testbed was set up to simulate the connection of different power sources and loads together to form a mini-grid and gain an understanding of how the power systems would interact. Within the power distribution scheme, each power source contributes to the grid in an independent manner without communication among the power sources and without a master-slave scenario. The grid consisted of four separate power sources and the accompanying power conditioning equipment. Overall system design and testing was performed. The tests were performed to observe the output and interaction of the different power sources as some sources are added and others are removed from the grid connection. The loads on the system were also varied from no load to maximum load to observe the power source interactions.

Mintz, Toby↗

Tariff Structures to Encourage Micro-Grid Deployment in Sub-Saharan Africa: Review and Recent Trends

This article reviews trends for micro-grid tariffs in Sub-Saharan Africa from two perspectives: guidelines for setting tariffs and methods for structuring tariffs. Different approaches are briefly described, and general benefits and drawbacks presented based on recent experiences and available literature. The pace of micro-grid deployment has suffered from a lack of private sector investment, which is often inhibited by unfavorable policies and uncertainty around tariffs. Traditional utility tariffs are too low to allow micro-grid investors to recover their full costs, but a variety of new approaches can be applied to address these challenges. Broad consensus suggests that cost-reflective tariffs are a critical enabler for micro-grid scale-up. Such tariffs can be coupled with subsidies or with hybridized approaches as well as unique new methods of tapping alternative revenue streams to maintain affordability for low-income customers and financial sustainability for micro-grids. There is no one-size-fits-all approach so long as lifetime costs can be recouped.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Customer Agreement Considerations for Micro-Grids in Sub-Saharan Africa

Micro-grid deployment at a large scale will be necessary for achieving ambitious national and international electrification goals and reaching communities for whom grid extension is prohibitively expensive. The micro-grid industry is growing to fill this need, but barriers remain to reaching scale with sustainable, bankable business models. An important step along the way to industry maturation is creating customer agreements that serve as a foundation for a healthy, long-term relationship between developers, operators, and the communities their micro-grids serve. In addition to directly setting clear expectations with customers, a strong customer agreement can be a valuable tool for prospective funders, system sizing discussions, and customer retention. This report covers considerations for customer agreement design and content, and is intended to serve as a resource for micro-grid developers seeking to develop or re-design customer agreements to support growth and help achieve scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Monitoring of African Micro-Grids: Good Practices and Operational Data

This report investigates the current understanding and use of performance monitoring in the micro-grid sector by developers. It highlights the importance of performance monitoring by providing key performance monitoring indicators and suggesting performance monitoring activities that improve projects and programs. This report also presents the analysis of the performance data of 36 micro-grids currently operating in Africa, in one of the largest such assessments conducted to date within the sector and concludes by recommending potential next steps towards integrating performance monitoring into the micro-grid sector.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Commercial and Industrial Energy Procurement in Nigeria: A Consumer's Guidebook

Across Africa, countries have incorporated a variety of new energy sources into their energy mix to account for increasing demand. In Nigeria, electricity consumption per capita has grown nearly 50% in the past 20 years. To address rising demand for energy in Nigeria, the country has passed several recent policies and regulations aimed at increasing energy generation across the country, improving the country's transmission infrastructure, and ensuring that electricity reliably reaches end users, including commercial and industrial (C&I) customers. This guidebook is designed for C&I customers in Nigeria to use in the consideration of procuring such onsite, captive energy systems to supplement their energy needs. Each section of this guidebook touches on a step of the procurement process and details the relevant stakeholders, processes, and data needed to make decisions during that step.

14 SOLAR ENERGY↗