Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “local ownership”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

30 records · Page 2

Integrated Space Asset Management Database and Modeling

Effective Space Asset Management is one key to addressing the ever-growing issue of space congestion. It is imperative that agencies around the world have access to data regarding the numerous active assets and pieces of space junk currently tracked in orbit around the Earth. At the center of this issues is the effective management of data of many types related to orbiting objects. As the population of tracked objects grows, so too should the data management structure used to catalog technical specifications, orbital information, and metadata related to those populations. Marshall Space Flight Center's Space Asset Management Database (SAM-D) was implemented in order to effectively catalog a broad set of data related to known objects in space by ingesting information from a variety of database and processing that data into useful technical information. Using the universal NORAD number as a unique identifier, the SAM-D processes two-line element data into orbital characteristics and cross-references this technical data with metadata related to functional status, country of ownership, and application category. The SAM-D began as an Excel spreadsheet and was later upgraded to an Access database. While SAM-D performs its task very well, it is limited by its current platform and is not available outside of the local user base. Further, while modeling and simulation can be powerful tools to exploit the information contained in SAM-D, the current system does not allow proper integration options for combining the data with both legacy and new M&S tools. This paper provides a summary of SAM-D development efforts to date and outlines a proposed data management infrastructure that extends SAM-D to support the larger data sets to be generated. A service-oriented architecture model using an information sharing platform named SIMON will allow it to easily expand to incorporate new capabilities, including advanced analytics, M&S tools, fusion techniques and user interface for visualizations. In addition, tight control of information sharing policy will increase confidence in the system, which would encourage industry partners to provide commercial data. Combined with the integration of new and legacy M&S tools, a SIMON-based architecture will provide a robust environment that can be extended and expanded indefinitely.

MacLeod, Todd↗

From Cell to System: Accelerated hpc Simulations of BESS Aging under Frequency Regulation and Arbitrage use cases

Lithium-ion battery energy storage systems (BESS) packs have emerged as a leading solution for grid-scale energy storage, enhancing resiliency and balancing load fluctuations. Yet, experimental characterization of large-format LIB packs-particularly to assess performance and degradation over hundreds of cycles - demands substantial hardware investment and multi-year testing campaigns. In this work, we couple a hierarchical, physics-based modeling framework agnostic to electrode chemistries with high-performance computing to accelerate systems level evaluation by upto two orders of magnitude. Building on the open-source liionpack platform, we implement cell, module, and pack-scale electrochemical models enriched with mechanistic aging mechanisms and deploy them on an HPC cluster to simulate 150−200kWh systems over 500 - 1,000 cycles with in days. We subject these virtual B ESS to both constant-current cycling and realistic grid service profiles spanning frequency regulation, ramp-rate support, and energy arbitrage-and quantify the resulting degradation patterns. Our results reveal that localized cell aging can induce substantial nonuniformity at module and pack levels, with service-specific cycling protocols driving distinct aging modes. This rapid, multiscale modeling approach provides a powerful design-space exploration tool for optimizing electrical architecture, control strategies, and operational schedules to prolong pack lifetime and lower total cost of ownership.

Ayalasomayajula, Surya [ORNL] (ORCID:0009000860788↗

Refining Control, Charging, and Battery Chemistry for CO 2 e Savings in Heavy-Duty Off-Road Plug-In Series Hybrid

With current and future regulations continuing to drive reductions in carbon dioxide equivalent (CO 2 e) emissions in the on-road industry, the off-road industry is also likely to be regulated for fuel and CO 2 e savings. This work focuses on converting a heavy-duty off-road material handler from a conventional diesel powertrain to a plug-in series hybrid, achieving a 49% fuel reduction and 29% CO 2 e reduction via simulation. Control strategies were refined for energy savings, including a regenerative braking strategy to increase regenerative braking and a load-following hydraulic strategy to decrease electrical energy consumption. The load-following hydraulic control shuts off the hydraulic electric machine when it is not needed—an approach not previously seen in a load-sensing, pressure-compensated system. Furthermore, these strategies achieved a 24.1% fuel savings, resulting in total savings of 61% in fuel and 41% in CO 2 e in the plug-in series compared to the conventional machine. Beyond control strategies, this study evaluated battery chemistry and charging strategy refinements for total cost of ownership (TCO) and lifetime CO 2 e. LFP batteries emerged as the most cost-effective and least emitting due to their longer lifespan, which reduced replacement frequency. Charging comparisons showed that Level 2 charging (L2C) typically resulted in lower TCO but higher lifetime CO 2 e than DC fast charging (DCFC). DCFC costs were heavily influenced by local demand charges, and DCFC emissions were heavily influenced by local grid emissions.

33 ADVANCED PROPULSION SYSTEMS↗

Makah Tribe Strategic Energy Plan

The U.S. Department of Energy’s (DOE) Energy Transitions Initiative Partnership Project (ETIPP) connects remote and island communities, regional partners, and the DOE national laboratories to support communities as they seek to build resilience in their energy systems. The Makah Tribe faces several energy challenges, including frequent power outages and the potential for an extended outage due to an earthquake or tsunami. The Tribe joined ETIPP in 2022 to address those challenges, seeking to build energy resilience and sovereignty in the community. The Makah Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory (NREL) collaborated to develop a strategic energy plan as part of the second cohort of ETIPP communities. The long-term energy vision of the Makah Tribe includes increasing energy efficiency in the community, improving energy management capacity, and developing the renewable energy generation and storage sufficient to independently power the Reservation for one year. Additionally, the ETIPP team worked with Makah leadership, staff, and community members to identify a set of community priorities, values, and goals to guide energy development as the Tribe takes the incremental steps toward their vision for energy sovereignty. Those energy values include ecosystem-based management, energy sovereignty and project ownership, workforce development and capacity, economic opportunity, community wellbeing and priorities, and emergency disaster resilience. To understand what would be needed for a year for energy independence, the PNNL team conducted an assessment to determine the current energy usage of the Tribe and also modeled several scenarios for future energy use. Using the energy usage values, the team estimated how two types of renewable energy technology, specifically locally deployed solar and small-scale wind, could contribute towards the energy independence goal. The energy baseline and resource assessment produced the following key findings:

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hanover LED Streetlight Conversion

On May 8, 2017, Hanover residents voted overwhelmingly to transition to 100% renewable electricity by 2030 and heating, cooling and transportation by 2050. In so doing, we became the first municipality in the country to make this commitment by popular vote. To accomplish these goal town leaders developed a plan to address first transitioning municipal energy uses to renewable forms of energy, through on-site generation of the municipal electrical load, load reduction through energy efficiency improvements to town facilities and infrastructure. Significant progress has been accomplished in the generation of energy with 90%+ of the 2024 municipal load being offset by generation and through various energy efficiency projects. The utility owned street lighting was identified as a large energy consumer of 165 MWh annually (7% of the annual municipal load) due to old inefficient high-pressure sodium and mercury vapor streetlights with no ability to reduce wattage during periods with low lighting needs. The Hanover LED Streetlight Replacement Project replaced utility owned streetlights with town owned controllable (dimmable and trimmable) LED lights that can be adjusted by location and time of night. Coupled with ownership of the streetlights transfer to the town, the town’s share of the project pay back is 11 months and for the complete project including federal share the payback is approximately 3 years. With the completion of lighting upgrade, the annual streetlighting energy load has dropped by 60% to 67 MWh in the first year of operation (7/1/24 - 6/30/25). This amounts to an approximate $90,000 annual savings or a local 1% tax rate impact. Additionally, over 200,000 pounds of CO2 will be saved annually.

99 GENERAL AND MISCELLANEOUS↗

Charging Hub Scenario Sheet Screenshot

The Excel-based CHECT tool estimates the LCOC ($/kWh) by charger type (Level 1, Level 2, and DC fast charging) for a given charging hub scenario. CHECT requires users to input certain charging hub scenario parameters, including the number of chargers, daily utilization, and charger replacement frequency by charger type. Additional inputs such as the charging schedule, local utility rates, capital/operational costs, and financial inputs can be customized by the user, or the tool can generate results using appropriate default values from literature for the charging hub scenario and service location(s). Using the above inputs, CHECT performs a robust techno-economic analysis to generate the LCOC by charger type, broken down by cost category (e.g., capital, operational, utility, taxes) for various combinations of charging hub types (multiunit dwelling or public) and ownership models (residential, utility, or private company). It also outputs the annual discounted cash flows and determines the most sensitive input variables. In addition, the tool allows users to easily compare the LCOC across various ownership models or across different states.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

TCO Analysis Approach and Regional Analysis of dWPT for Class 8 Tractors

Dynamic Wireless Power Transfer (dWPT) is a method by which battery electric vehicles (BEVs) can charge their battery while traveling on the road without the need for a physical conductive connection to the power source. dWPT has been proposed as a strategy to enable a reduction in vehicle battery capacity and associated mass and cost. In this slide deck presented at the EVs@Scale Consortium - Wireless Power Transfer Pillar Deep-Dive Meeting on November 11th, 2023, NREL provides results from an evaluation of dWPT using data from Class 8 tractors driving in the Atlanta Metro Area. NREL selected data for archetypal days representing local, regional, and long-haul trips, defined according to trip length, that included travel on primary roadways. EVI-InMotion (Electric Vehicle Infrastructure - InMotion), a systems planning and optimization tool developed at NREL, was used to evaluate dWPT performance assuming dWPT charging on 120 road segments for a total roadway lane distance of 2,365 miles. The EVI-InMotion results and representative day drive cycles were analyzed with NREL's T3CO (Transportation Technology Total Cost of Ownership) tool to estimate the total cost of ownership (TCO) for scenarios comprising two model years - 2030 and 2040 - and two technology progress cases. TCO was calculated for diesel, fuel cell electric, BEVs with batteries sized assuming no dWPT capabilities, and 200kWh BEVs with dWPT installed. This analysis finds that en-route stationary charging frequency and downtime when not on electrified roadways are the main contributors to TCO for the dWPT vehicles and that these vehicles can achieve cost parity with FCEVs at low electricity costs. Based on the scenario assumptions used here, low electricity costs would further help the cost parity with diesel vehicles in regional and long-haul cases due to stationary fueling downtime. This presentation also concludes that key factors affecting the parity potential of dWPT-capable vehicles include more extensive dWPT road coverage, higher en-route charging power, less expensive power batteries, and higher hydrogen or diesel fuel costs.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimizing DOE Opportunities to Research Land–Atmosphere Interactions in the U.S. Southeast (Workshop Report)

The southeastern United States (Southeast), with its complex and varied environments, is an area of tremendous economic, ecological, and societal importance to the country. The region is characterized by heterogeneous landscapes (i.e., geology and soil type) and a long history of human land use coupled with a warm temperature regime and high precipitation. As a result, soil erosion and deposition are pronounced, vegetation recovery is rapid, and human modification is extensive across the region. To better understand land–atmosphere interactions in this important and complex region, research communities supported by the U.S. Department of Energy’s Biological and Environmental Research (BER) program identified the Southeast as a priority region of interest. In fall 2024, the third Atmospheric Radiation Measurement Mobile Facility (AMF3), one of three mobile monitoring facilities designed to collect atmospheric and climate data from undersampled regions around the world, will begin operations in northwestern Alabama’s Bankhead National Forest (BNF). The AMF3-BNF 5-year deployment, from 2024–2029, will monitor the effects of feedbacks among aerosols, clouds, and precipitation on plant physiology and canopy-scale fluxes. It will also focus on scale aggregation to resolve the role of local forcing on larger-scale processes. To enable broader AMF3 involvement by the science community, the BER Environmental System Science (ESS) program organized the Southeast Land– Atmosphere Research Opportunities (SELARO) workshop in August 2023. The purpose was to identify gaps in scientific understanding of terrestrial processes in the Southeast (defined as states bounded by the Gulf of Mexico to the south, the Atlantic Ocean to east, the Mississippi River to the west, and extending through Tennessee and North Carolina to the north) and explore opportunities to use the AMF3-BNF deployment to coordinate and leverage research efforts across the region. Many parts of the Southeast have experienced repeated anthropogenic forcings. Farming, hunting, burning, and settlement of the region by Indigenous Peoples first shaped the distribution of plant communities, which in turn influenced European colonization patterns. Timber harvesting was common during the expansion of European settlements, and production forestry continues today. Agricultural production was extensive and then waned through the 20th century, creating a period of afforestation following agricultural abandonment. Today, many formerly agricultural landscapes are undergoing rapid urbanization and suburbanization. Overlying these patterns of anthropogenic land use are frequent disturbances from hurricanes, tornadoes, wildfires, drought, flooding, ice storms, and the occasional blizzard. An additional characteristic of the Southeast is its overall landscape complexity. Unlike the western United States, where broad expanses may share similar characteristics, Southeast topography, drainage patterns, vegetation, and development patterns vary widely across relatively small spatial scales (<1 km). This is due to the region’s underlying geology and soil development, species biodiversity patterns, and land ownership and use coupled with strong forces of erosion, weathering, and rapid plant growth in the warm, wet climate.

54 ENVIRONMENTAL SCIENCES↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗