At least 37 records · Page 2

Restoring Critical Loads In Resilient Distribution Systems using A Curriculum Learned Controller

In this paper, we propose a curriculum learned reinforcement learning (RL) controller to facilitate distribution system critical load restoration (CLR), leveraging RL's fast online response and its outstanding optimal sequential control capability. Like many grid control problems, CLR is complicated due to the large control action space and renewable uncertainty in a heavily constrained non-linear environment with strong intertemporal dependency. The nature of the problem oftentimes causes the RL policy to converge to a poor-performing local optimum if learned directly. To overcome this, we design a two-stage curriculum in which the RL agent will learn generation control and load restoration decision under different scenarios progressively. Via curriculum learning, the trained RL controller is expected to achieve a better control performance, with critical loads restored as rapidly and reliably as possible. Using the IEEE 13-bus test system, we illustrate the performance of the RL controller trained by the proposed curriculum-based method.

curriculum learning↗

Cyber-Physical Reconfiguration for Disaster Resilience of Power Distribution Systems

Cyber-physical distribution systems (CPDS) have emerged from the integration of information technology into distribution systems. While offering substantial benefits, this integration also introduces vulnerabilities. The interaction between cyber networks and distribution systems renders CPDS susceptible to disasters. To ensure critical load supply and system resilience, rapid post-disaster load restoration is required. The paper proposes a critical load restoration (CLR) framework in CPDS using a network reconfiguration approach that exploits the existing post-disaster resources to restore critical loads within the shortest possible time. Using graph theory, the cyber network and distribution system are integrated into a single digraph, minimizing the CLR complexity in CPDS. A cost metric is also defined to satisfy network-specific objectives and constraints. A heuristic is proposed to guide the load restoration process using the cost metric within the integrated digraph. Simulation results confirm the framework's superiority over existing literature, which either overlooks cyber components or prolongs restoration with additional resource deployment.

cyber-physical system↗

Load Profile Inpainting for Missing Load Data Restoration and Baseline Estimation

This paper introduces a Generative Adversarial Nets (GAN) based, Load Profile Inpainting Network (Load-PIN) for restoring missing load data segments and estimating the baseline for a demand response event. The inputs are time series load data before and after the inpainting period together with explanatory variables (e.g., weather data). Here, we propose a Generator structure consisting of a coarse network and a fine-tuning network. The coarse network provides an initial estimation of the data segment in the inpainting period. The fine-tuning network consists of self-attention blocks and gated convolution layers for adjusting the initial estimations. Loss functions are specially designed for the fine-tuning and the discriminator networks to enhance both the point-to-point accuracy and realisticness of the results. We test the Load-PIN on three real-world data sets for two applications: patching missing data and deriving baselines of conservation voltage reduction (CVR) events. We benchmark the performance of Load-PIN with five existing deep-learning methods. Our simulation results show that, compared with the state-of-the-art methods, Load-PIN can handle varying-length missing data events and achieve 15-30% accuracy improvement.

14 SOLAR ENERGY↗

ARM-IRL: Adaptive Resilience Metric Quantification Using Inverse Reinforcement Learning

The resilience of safety-critical systems is gaining importance due to the rise in cyber and physical threats, especially within critical infrastructure. Traditional static resilience metrics may not capture dynamic system states, leading to inaccurate assessments and ineffective responses to cyber threats. This work aims to develop a data-driven, adaptive method for resilience metric learning. We propose a data-driven approach using inverse reinforcement learning (IRL) to learn a single, adaptive resilience metric. The method infers a reward function from expert control actions. Unlike previous approaches using static weights or fuzzy logic, this work applies adversarial inverse reinforcement learning (AIRL), training a generator and discriminator in parallel to learn the reward structure and derive an optimal policy. The proposed approach is evaluated on multiple scenarios: optimal communication network rerouting, power distribution network reconfiguration, and cyber–physical restoration of critical loads using the IEEE 123-bus system. The adaptive, learned resilience metric enables faster critical load restoration in comparison to conventional RL approaches.

97 MATHEMATICS AND COMPUTING↗

Post-Disaster Microgrid Formation for Enhanced Distribution System Resilience

This paper proposes a deep reinforcement learning (DRL) based approach for post-disaster critical load restoration in active distribution systems to form microgrids through network reconfiguration to minimize critical load curtailments. Distribution networks are represented as graph networks, and optimal network configurations with microgrids are obtained by searching for the optimal spanning forest. The constraints to the research question being explored are the radial topology and power balance. Unlike existing analytical and population-based approaches, which necessitate the repetition of entire analyses and computation for each outage scenario to find the optimal spanning forest, the proposed approach, once properly trained, can quickly determine the optimal, or near-optimal, spanning forest even when outage scenarios change. When multiple lines fail in the system, the proposed approach forms microgrids with distributed energy resources in active distribution systems to reduce critical load curtailment. The proposed DRL-based model learns the action-value function using the REINFORCE algorithm, which is a model-free reinforcement learning technique based on stochastic policy gradients. A case study was conducted on a 33-node distribution test system, demonstrating the effectiveness of the proposed approach for post-disaster critical load restoration.

active distribution systems↗

A VSC-HVDC-Assisted Black-Start Strategy in Bulk Power Systems a Case Study in San Diego

With the worldwide growth in deploying high-voltage direct current (HVDC) transmission systems, their ability to facilitate black-start (BS) restoration has been a research topic of interest. In this context, voltage source converter (VSC)-HVDC is regarded as a BS resource, and this paper proposes a VSC-HVDC-assisted parallel BS restoration strategy in bulk power systems. The proposed strategy consists of two stages: 1) determination of the VSC and generator startup sequence and 2) load restoration simulation. In the first stage, the entire blackout system is sectionalized into multiple subsystems. Each subsystem includes a VSC-HVDC station or traditional BS unit, it independently determines its generator startup timeline and the energization timelines for buses and lines. The second stage involves load restoration, conceptualized as a modified unit commitment problem, with the timelines established in the first stage work as critical inputs. The proposed BS restoration strategy is tested on the San Diego power system to simulate the 2011 Southwest blackout. The simulation results validate the effectiveness of using VSC-HVDC links as a BS resource which not only speeds up the restoration process but also reduces both energy and economic losses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration: Preprint

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Enhancing Grid Resilience with HIVE: Decentralized V2G Coordination for Black Starts

This paper proposes the HIVE (Harmonized Integration of Vehicle Energy for Grid Support) model, a novel game-theoretic framework for decentralized coordination of electrified vehicles to enable black start and load restoration during grid outages. In the absence of a central controller, HIVE employs a cooperative game to model vehicle interactions, allowing autonomous decision-making while admitting to a Nash equilibrium for grid restoration. The framework addresses the heterogeneity of vehicles and their operational constraints, selecting a lead vehicle for grid-forming and coordinating grid-following vehicles to support prioritized loads. Applied to a hospital blackout scenario, HIVE demonstrates robust performance in forming an islanded microgrid and sustaining critical loads under varying vehicle availability, state of charge, and power constraints. Simulation results highlight the model’s effectiveness in ensuring decentralized coordination of energy allocation and prioritizing loads, offering a scalable solution for resilient grid operations.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Distribution System Blackstart and Restoration Using DERs and Dynamically Formed Microgrids

Extreme weather events have led to long-duration outages in the distribution system (DS), necessitating novel approaches to blackstart and restore the system. Existing blackstart solutions utilize blackstart units to establish multiple microgrids (MGs), sequentially energize non-blackstart units, and restore loads. However, these approaches often result in isolated MGs. In DERs-aided blackstart, the continuous operation of these MGs is limited by the finite energy capacity of commonly used blackstart units like battery energy storage (BES)-based gridforming inverters (GFMIs). To address this issue, this article proposes a holistic blackstart and restoration framework that incorporates synchronization between dynamic MGs and the entire DS with the transmission grid (TG). To support synchronization, we leveraged virtual synchronous generator-based control for GFMIs to estimate their frequency response to load pick-up events using only initial/final quasi-steady-state points. Subsequently, a synchronization switching condition is developed to model synchronizing switches, aligning them seamlessly with a linearized branch flow problem. Finally, we designed a bottomup blackstart and restoration framework that considers the switching structure of the DS, energizing/synchronizing switches, DERs with grid-following inverters, and BES-based GFMIs with frequency security constraints. In conclusion, the proposed framework is validated in IEEE-123-bus system, considering cases with two and four GFMIs under various TG recovery instants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Transactive Energy into Reliability Evaluation for a Self-healing Distribution System with Microgrid

Non-utility owned distributed energy resources (DERs) are mostly untapped currently, but they can provide many grid services such as voltage regulation and service restoration, if properly controlled, and can improve the distribution systems reliability when coordinated with utility-owned assets such as self-healing control and microgrids. This paper integrates transactive energy control into the distribution system reliability evaluation to quantitatively assess the impact of non-utility owned DERs on reliability improvement. Here, a transactive reactive power control strategy is designed to incentivize the DERs to provide reactive power support for improving voltage profiles thus enabling additional customer load restoration during an outage. Also, an operational sequence to coordinate the non-utility owned DERs with the utility owned self-healing control and utility owned microgrids is designed and integrated into the service restoration process with the operational constraints guaranteed by checking the three-phase unbalanced power flow for post-fault network reconfiguration. The reliability indices are then calculated through a Monte Carlo simulation. The transactive reactive power control strategy is tested on a four-feeder distribution system operated by Duke Energy in the U.S. Results demonstrate that the non-utility owned DERs with the transactive control improve the reliability of both the system and critical loads by more than 30%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Robust Restoration From Cyber-Physical Attacks in Active Distribution Grids With Grid-Edge IBRs

The inverter-based resources (IBRs) have enabled the integration of renewable energy at the grid edge with enhanced control capabilities to support the reliable operation of power grids. Different control frameworks, such as hierarchical or distributed architecture, have been proposed with the expansion of cyber networks for real-time monitoring and control. This evolution of critical infrastructure into cyber-physical systems also brings more vulnerabilities for the broadened attack surfaces, and significantly increases the possibility of physical system failures or outages caused by cyberattacks. Among tremendous efforts in the defense-in-depth approach, it remains challenging to provide prompt detection and accurate location of attack entry points or paths. Therefore, the prevailing restoration framework may struggle to fully consider the cyber-physical interdependence, successfully isolate the compromised cyber and physical components, and safely recover the systems without the potential risks leading to secondary outages. This paper is motivated to develop a cyber-physical restoration framework for distribution grids to recover from cyber attacks by harnessing grid-edge IBRs. The framework is first built on the operational guidelines of IBRs considering the compromised cyber layer. Then, an ambiguity set is established to represent the uncertainty of attack scenarios and their possibility levels. Next, a distributionally robust optimization model is developed to provide the optimal load restoration strategy across all scenarios. The effectiveness of the proposed model is demonstrated through various use cases on the modified IEEE 13-node and 123-node test systems. Finally, simulation results demonstrate the effectiveness and advancement of developed post-attack restoration strategies.

Cybersecurity↗

Enhancing Active Distribution Systems Resilience by Fully Distributed Self-Healing Strategy

Distributed restoration can exploit smart grid technologies to enhance the resilience of active distribution networks toward a self-healing smart grid. However, the large number of decision variables, especially the binary ones for reconfiguration, bring challenges to developing scalable distributed distribution service restoration (DDSR) strategies. This paper proposes a fully distributed solution procedure based on the alternating direction method of multipliers (ADMM) for mixed-integer programming problems and applies to develop the DDSR framework. The method consists of relax-drive-polish phases, 1) relaxing binary variables, and applying the convex ADMM as a warm start; 2) driving the solutions toward Boolean values through a proximal operator; 3) fixing the obtained binding binary variables and solving the rest of the problem to polish results and achieve a high-quality suboptimal solution. Then, an autonomous clustering strategy and consensus ADMM are integrated with the proposed method to realize the fully distributed cluster-based framework of DDSR. This framework can first determine DER scheduling and switch status for reconfiguration to energize the out-of-service areas from local faults, and then provide the load restoration solution in a distributed manner for total blackouts in large-scale distribution networks. Furthermore, the effectiveness and scalability of the proposed DDSR framework are demonstrated through testing on the IEEE 123-node, IEEE 8500-node, and synthetic 100k-node test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Hardware-In-the-Loop Hydropower and Ultracapacitor Hybrid Testbed

Widespread deployment of a proof-of-concept technological solution for power system performance improvement can be accelerated through onsite demonstration and pilot projects. Digital real-time simulation with power hardware-in-the-loop in controlled lab environment is the precursor to de-risk the timely and efficient execution of field demonstration and pilot projects. However, the detailed process of development, characterization, and calibration of such high fidelity simulation testbed needs to be documented in a reproducible and publicly accessible manner to leverage across broader research and development communities. This paper presents such a laboratory testbed to study black start capability of a run-of-river hydro + ultracapacitor hybrid system. Beside the high-fidelity model of the islanded grid with hydropower unit, the testbed includes the energy storage, grid following inverter, and grid emulator hardware. Several aspects such as storage characterization, control and various parameter settings necessary to capture frequency transients during load restoration are described in a comprehensive manner, which led to an effective and timely execution of black start field demonstration with an actual hydropower plant.

13 HYDRO ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Demand Estimation of Net Metered Loads for Microgrid Restoration

Microgrids can experience frequency instability while operating in the islanded mode due to a significant demand generation imbalance. Presence of net metered (NM) loads can further complicate accurate demand forecasting. For these loads only the net demand, difference of load demand and generation, is available. This paper presents the various stages observed during microgrid restoration with high penetration of NM loads. Disaggregation of demand and generation from the net metered time series is shown to be essential for accurate demand forecasting in each of these stages. A disaggregation approach is proposed using correlation in the net metered data. Time series analysis is then used to forecast the demand in each stage of the microgrid restoration process. A case study using demand and generation time series data from residential loads, shows that the proposed approach is significantly more accurate for demand forecasting than using only the net-metered time series.

demand forecasting, Microgrid, power system restor↗