Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Parameter Reduction of Composite Load Model Using Active Subspace Method

Over the past decades, the increasing penetration of distributed energy resources (DERs) has dramatically changed the power load composition in the distribution networks. The traditional static and dynamic load models can hardly capture the dynamic behavior of modern loads especially for fault-induced delayed voltage recovery (FIDVR) events. Thus, a more comprehensive composite load model with combination of static load, different types of induction motors, single-phase A/C motor, electronic load and DERs has been proposed by Western Electricity Coordinating Council (WECC). However, due to the large number of parameters and model complexity, the WECC composite load model (WECC CMLD) raises new challenges to power system studies. To overcome these challenges, in this paper, a cutting-edge parameter reduction (PR) approach for WECC CMLD based on active subspace method (ASM) is proposed. Firstly, the WECC CMLD is parameterized in a discrete-time manner for the application of the proposed method. Then, parameter sensitivities are calculated by discovering the active subspace, which is a lower-dimensional linear subspace of the parameter space of WECC CMLD in which the dynamic response is most sensitive. The interdependency among parameters can be taken into consideration by our approach. Finally, the numerical experiments validate the effectiveness and advantages of the proposed approach for WECC CMLD model.

active subspace↗

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1↗

Event-Driven Predictive Approach for Real-Time Volt/VAR control with CVR in solar PV rich Active Distribution Network

The focus of this paper is on analyzing the impact of conservation voltage reduction in the presence of active devices such as solar photovoltaic (PV) and developing controls that leverage these distributed energy resources. An event-driven predictive approach for real-time volt/volt-ampere reactive (VAR) optimization, along with local two-level adaptive volt/VAR droop-based control algorithm for advanced distribution management systems, is introduced. The methodology covers aggregated and autonomous controls under different timescale operations, including the impact and effect of unpredicted events such as cloud transients on PV power production. In addition, the control schemes include the uncertainties in PV power generation and load power demand. The proposed methodology is validated in a real-time framework using the real-time digital simulator platform through co-simulation with models based on Python and OpenDSS (Open Distribution System Simulator). The developed methodology is tested on the modified IEEE 123-feeder test system. The results reveal that the proposed methodology works well in the presence of high penetrations of PV power, produces significant energy savings, and mitigates over-/undervoltage problems.

14 SOLAR ENERGY↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data efficiency assessment of generative adversarial networks in energy applications

This study investigates the data requirements of generative artificial intelligence (AI), particularly generative adversarial networks (GANs), for reliable data augmentation in energy applications. Generative AI, though seen as a solution to data limitations, requires substantial data to learn meaningful distributions—a challenge often overlooked. This study addresses the challenge through synthetic data generation for critical heat flux (CHF) and power grid demand, focusing on renewable and nuclear energy. Two variants of GAN employed are conditional GAN (cGAN) and Wasserstein GAN (wGAN). Our findings include the strong dependency of GAN on data size, with performance declining on smaller datasets and varying performance when generalizing to unseen experiments. Mass flux and heated length significantly influence CHF predictions. wGAN is more robust to feature exclusion, making it suitable for constrained synthetic data generation. In energy demand forecasting, wGAN performed well for solar, wind, and load predictions. Longer lookback hours and larger datasets improved predictions, especially for load power. Seasonal variations posed challenges, with wGAN achieving a relatively high error of Root Mean Squared Error (RMSE) of 0.32 for load power prediction, compared to RMSE of 0.07 under same-season conditions. Feature exclusions impacted cGAN the most, while wGAN showed greater robustness. This study concludes that, while generative AI is effective for data augmentation, it requires substantial data and careful training to generate realistic synthetic data and generalize to new experiments in engineering applications.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Physics and technology considerations for the deuterium–tritium fuel cycle and conditions for tritium fuel self sufficiency

The tritium aspects of the DT fuel cycle embody some of the most challenging feasibility and attractiveness issues in the development of fusion systems. The review and analyses in this paper provide important information to understand and quantify these challenges and to define the phase space of plasma physics and fusion technology parameters and features that must guide a serious R&D in the world fusion program. We focus in particular on components, issues and R&D necessary to satisfy three 'principal requirements': (1) achieving tritium self-sufficiency within the fusion system, (2) providing a tritium inventory for the initial start-up of a fusion facility, and (3) managing the safety and biological hazards of tritium. A primary conclusion is that the physics and technology state-of-the-art will not enable DEMO and future power plants to satisfy these principal requirements. We quantify goals and define specific areas and ideas for physics and technology R&D to meet these requirements. A powerful fuel cycle dynamics model was developed to calculate time-dependent tritium inventories and flow rates in all parts and components of the fuel cycle for different ranges of parameters and physics and technology conditions. Dynamics modeling analyses show that the key parameters affecting tritium inventories, tritium start-up inventory, and tritium self-sufficiency are the tritium burn fraction in the plasma (f b ), fueling efficiency (η f ), processing time of plasma exhaust in the inner fuel cycle (t p ), reactor availability factor (AF), reserve time (tr) which determines the reserve tritium inventory needed in the storage system in order to keep the plant operational for time t r in case of any malfunction of any part of the tritium processing system, and the doubling time (t d ). Results show that η f f b > 2% and processing time of 1–4 h are required to achieve tritium self-sufficiency with reasonable confidence. For η f f b = 2% and processing time of 4 h, the tritium start-up inventory required for a 3 GW fusion reactor is ~11 kg, while it is <5 kg if η f f b = 5% and the processing time is 1 h. To achieve these stringent requirements, a serious R&D program in physics and technology is necessary. The EU-DEMO direct internal recycling concept that carries fuel directly from the plasma exhaust gas to the fueling systems without going through the isotope separation system reduces the overall processing time and tritium inventories and has positive effects on the required tritium breeding ratio (TBR R ). A significant finding is the strong dependence of tritium self-sufficiency on the reactor availability factor. Simulations show that tritium self-sufficiency is: impossible if AF < 10% for any η f f b , possible if AF > 30% and 1% ≤ η f f b ≤ 2%, and achievable with reasonable confidence if AF > 50% and η f f b > 2%. These results are of particular concern in light of the low availability factor predicted for the near-term plasma-based experimental facilities (e.g. FNSF, VNS, CTF), and can have repercussions on tritium economy in DEMO reactors as well, unless significant advancements in RAMI are made. There is a linear dependency between the tritium start-up inventory and the fusion power. The required tritium start-up inventory for a fusion facility of 100 MW fusion power is as small as 1 kg. Since fusion power plants will have large powers for better economics, it is important to maintain a 'reserve' tritium inventory in the tritium storage system to continue to fuel the plasma and avoid plant shutdown in case of malfunctions of some parts of the tritium processing lines. But our results show that a reserve time as short as 24 h leads to unacceptable reserve and start-up inventory requirements. Therefore, high reliability and fast maintainability of all components in the fuel cycle are necessary in order to avoid the need for storing reserve tritium inventory sufficient for continued fusion facility operation for more than a few hours. The physics aspects of plasma fueling, tritium burn fraction, and particle and power exhaust are highly interrelated and complex, and predictions for DEMO and power reactors are highly uncertain because of lack of experiments with burning plasma. Fueling by pellet injection on the high field side of tokamak has evolved to be the preferred method to fuel a burning plasma. Extrapolation from the DIII-D penetration scaling shows fueling efficiency expected in DEMO to be <25%, but such extrapolations are highly uncertain. The fueling efficiency of gas in a reactor relevant regime is expected to be extremely poor and not very useful for getting tritium into the core plasma efficiently. Gas fueling will nonetheless be useful for feedback control of the divertor operating parameters. Extensive modeling has been carried out to predict burn fraction, fueling requirements, and fueling efficiency for ITER, DEMO, and beyond. The fueling rate required to operate Q = 10 ITER plasmas in order to provide the required core fueling, helium exhaust and radiative divertor plasma conditions for acceptable divertor power loads was calculated. If this fueling is performed with a 50–50 DT mix, the tritium burn fraction in ITER would be ~0.36%, which is too low to satisfy the self-sufficiency conditions derived from the dynamics modeling for fusion reactors. Extrapolation to DEMO using this approach would also yield similarly low burn fraction. Extensive analysis presented shows that specific features of edge neutral dynamics in ITER and fusion reactors, which are different from present experiments, open possibilities for optimization of tritium fueling and thus to improve the burn fraction. Using only tritium in pellet fueling of the plasma core, and only deuterium for edge density, divertor power load and ELM control results in significant increase of the burn fraction to 1.8–3.6%. These estimates are performed with physics models whose results cannot be fully validated for ITER and DEMO plasma conditions since these cannot be achieved in present tokamak experiments. Thus, several uncertainties remain regarding particle transport and scenario requirements in ITER and DEMO. The safety standard requirements for protection of the public and release guidelines for tritium have been reviewed. General safety approaches including minimizing tritium inventories, reducing tritium permeation through materials, and decontaminating material for waste disposal have been suggested.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Low-Power, Load-Balancing Whole Home Electrification Solution: Cooperative Research and Development (Final Report)

Testing was conducted at the Systems Performance Laboratory in NREL’s Energy Systems Integration Facility to test the performance of 120V wall-mounted heat pumps, 120V heat pump water heaters (HPWH), Electric Vehicle Supply Equipment (EVSE), and other plug-in loads, using NeoCharge Smart Splitters and whole home energy software as appropriate. Four different simulated occupancy scenarios were used to evaluate the package of technology and controls.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Powering Large Loads: Solutions Across Transmission, Utility, and Facility Scales

This report synthesizes current strategies for accommodating large load growth through a review of publicly available technical literature and media insights around the United States (U.S.). Solutions are organized across three implementation scales (transmission, utility, and facility) and categorized according to common implementation pathways (including structural expansion, operations and efficiency, upgrades, and planning and policy).

Valdez, Raquel Lynn [Sandia National Laboratories ↗

Load following power generation and power storage using REP and PEM technology

A hydrogen generation system for generating hydrogen and electrical power includes a power supply, a reformer-electrolyzer-purifier (REP) assembly including at least one fuel cell including an anode and a cathode separated by an electrolyte matrix, at least one low temperature fuel cell, and a hydrogen storage. The at least one fuel cell is configured to receive a reverse voltage supplied by the power supply and generate hydrogen-containing gas in the anode of the at least one fuel cell. The at least one low temperature fuel cell is configured to receive the hydrogen-containing gas output from the REP assembly. The at least one low temperature fuel cell is configured to selectably operate in a power generation mode in which the hydrogen-containing gas is used to generate electrical power and a power storage mode in which the hydrogen-containing gas is pressurized and stored in the hydrogen storage.

Jahnke, Fred C.↗

Ensuring Transient Stability With Guaranteed Region of Attraction in DC Microgrids

DC microgrids have promising applications in renewable integration due to their better energy efficiency when connecting DC components. However, they might be unstable since many loads in a DC microgrid are regulated as constant power loads (CPLs) that have a destabilizing negative impedance effect. As a result, the state trajectory displacement caused by abrupt load changes or contingencies can easily lead to instability. Many existing works have been devoted to studying the region of attraction (ROA) of a DC microgrid, in which the system is guaranteed to be asymptotically stable. Nevertheless, existing work either focuses on using numerical methods for ROA approximations that generally have no performance guarantees or cannot ensure a desired ROA for a general DC microgrid. To close this gap, this paper develops an innovative control synthesis algorithm to make a general DC microgrid have a theoretically guaranteed ROA, for example, to cover the entirety of its operating range regarding state trajectories. Here, we first study the nonlinear dynamics of a DC microgrid to derive a novel transient stability condition to rigorously certify whether a given operating range is a subset of the ROA; then, we formulate a control synthesis optimization problem to guarantee the condition’s satisfaction. This condition is a linear constraint, and the optimization problem resembles an optimal power flow problem and has a good computational behavior. Simulation case studies verify the validity of the proposed work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deadband Voltage Control and Power Buffering for Extreme Fast Charging Station

Voltage fluctuation is one of the most common challenges that electric vehicle charging station (EVCS) may introduce to the power grid. Local reactive power compensation (Q-compensation) capability of bi-directional electric vehicle (EV) chargers can mitigate the steady-state voltage violations caused by the EV charging itself or changes in the neighboring loads. Power buffering, using energy storage system (ESS), can be utilized to address the voltage transients (sags and swells) as a result of EV charging at the EVCS. To address PI controller’s ‘hunting’ issue, this paper proposes a Q-sign triggered deadband voltage control (V-control) method at the point of common coupling (PCC). In addition, to ensure the ramp rate of EV charging is within the allowable limits set forth by the grid code, a ramp rate control is proposed that uses the ESS as a ‘power buffer’. Lastly, different from most reported work in the literature where no explicit limit of the power electronic converters (PECs) is considered, this work considers a reasonable apparent power capacity limit of the PECs when achieving the V-control. This limit also affects the amount of active power that can be obtained from the grid, and subsequently may require ESS to function as ‘load sharing’ device to provide supplemental active power to satisfy EV load. A case study simulated in MATLAB (interfaced with PLECS) is presented to demonstrate the effectiveness of the proposed approaches for EVCS operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reconfigurable Real-Time Power Grid Emulator for Systems With High Penetration of Renewables

Novel power system control and new utility devices need to be tested before their actual deployment to the power grid. To assist with such a testing need, real-time digital emulators such as RTDS and Opal-RT can be used to connect to the physical world and form a hardware in the loop (HIL) emulation. However, due to the limitations of today's computational resources, the accuracy and fidelity suffer from different levels of model reductions in purely digital simulations. CURENT has developed a reconfigurable electric grid hardware testbed (HTB) to overcome the limitations of digital emulators. The HTB has been used to develop measurement, control, modeling, and actuation techniques for a national grid with a high penetration of renewables. The power electronic-based system includes emulators for synchronous generators; photovoltaics with grid-interfacing inverter; wind turbines; induction motor loads, ZIP loads, power electronic loads; batteries; ac and dc transmission lines; short circuit faults and grid relay protection; and a multiterminal HVDC overlay including power electronics interfaces. The system contains real elements of power flow, measurement, communication, protection, and control that mimic what would be seen in an actual electric grid. This paper presents an overview of the HTB and several scenarios that have been run to determine control and actions needed for the future power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Combined Creep and Fatigue Modeling

Simultaneous consideration of creep and fatigue is of paramount importance to accurately predict component life in many industrial applications. For example, growing penetration of renewable energy onto the grid is forcing many power plants to transition from base-load power generation to more complex operation modes, characterized by a combination of base-load generation and frequent start-up and shut-down cycles. The frequent start-stop of power plants is causing a significant toll in the component life due to fatigue. As such, creep alone is not adequate anymore to predict the component life. Most existing life prediction models consider creep or fatigue independently while neglect their interactions. In this presentation, we talk about some recent efforts at NETL to develop a unified modeling framework where both creep and fatigue can be considered. The creep-fatigue interaction mechanism is studied. High-throughput simulations are performed under various hold stress and hold time, and analytical expressions are fitted for the crack growth rates under creep and/or fatigue conditions demonstrating some applications of this newly developed modeling capability.

advanced alloy development↗

Evaluation of Distributed Power Apportioning with Net Load Management Engine in Microgrids Using Power Hardware-in-the-Loop Simulation

This article presents the performance evaluation of ratio consensus-based distributed power apportioning engine along with centralized net load management (NLM) engine that ensures viable and stable operation of an islanded microgrid. Managing net load variability in a microgrid with high penetrations of uncertain renewable generation and ever-changing load demands is a crucial need in order to ensure viable and stable operation of the microgrid. Centralized “dispatch-rule”-based and/or multi-agent-based distributed control of distributed energy resources (DERs) in microgrid are well accepted for microgrid by adapting ANSI/ISA-95-based hierarchical control architecture. In the application where microgrid network has large geographical span with multiple DERs dispersed in the network, high penetration of uncertain renewable energy resources, and ever-changing load demands, a judicious selection of techniques/solutions for managing net-load resources for maintaining viability and stability is required. With this motivation, this article proposes a novel solution to mitigate the challenges by incorporating a mixed centralized NLM engine and distributed power apportioning control of DERs and loads. A power-hardware-in-the-loop (PHIL) -based experiment is conducted with the centralized NLM engine and the distributed power apportioning engine along with two commercial inverters. The experimental results validates the efficacy of the proposed method in ensuring viability and stability of a microgrid.

hardware-in-the-loop simulation↗

Real-time disaggregation of renewable energy generation on an electricity distribution system

Techniques are described for disaggregation of renewable energy generation on an electricity distribution system. Aggregate power measurements are identified a distribution substation. Active power load of the distribution substation and active power generated by renewable energy sites can be disaggregated from the aggregate power measurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated ELM and divertor power flux control using RMPs with low input torque in EAST in support of the ITER research plan

Experiments have been carried out at the EAST tokamak to study ITER-relevant scenario integration issues, related to edge localized mode (ELM) control in H-mode plasmas by the application of three-dimensional (3D) resonant magnetic perturbations (RMPs), which have a large impact on the execution of the ITER research plan. The EAST experiments have successfully demonstrated ELM suppression at normalized torque inputs similar to ITER. The application of RMP fields with high toroidal mode number (n = 4) reduces the impact of ELM control on energy and particle confinement compared to those use lower n (n = 1, 2) RMPs. Injection of successive pellets is found to be effective in increasing the plasma density in ELM-suppressed H-modes and reducing the divertor power without triggering large ELMs at EAST. Access to high recycling and radiative divertor conditions while maintaining ELM suppression has been demonstrated in EAST by the use of gas fuelling and neon impurity seeding. Both approaches have been found to be effective in reducing power fluxes to the divertor strike points in near-separatrix lobes for both n = 2 and n = 4 RMPs. Furthermore, reduction of power fluxes in off-separatrix lobes is only effective for n = 4 RMP application, which is consistent with magnetic topology modelling (including plasma response) results showing a shallow penetration into the confined plasma region of field lines connected to these lobes compared to n = 2. The EAST results support the use of high n 3D fields for ELM suppression in ITER high Q DT scenarios since they provide optimum integration features regarding energy and particle confinement, pellet fuelling, radiative divertor operation while eliminating ELM transient power loads and being compatible with low torque input.

pellet fuelling↗