Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

High Temperature Gas-Cooled Reactors Lessons Learned Applicable to the Next Generation Nuclear Plant

The purpose of this report is to identify possible issues highlighted by these lessons learned that could apply to the NGNP in reducing technical risks commensurate with the current phase of design. Some of the lessons learned have been applied to the NGNP and documented in the Preconceptual Design Report. These are addressed in the background section of this document and include, for example, the decision to use TRISO fuel rather than BISO fuel used in the Peach Bottom reactor; the use of a reactor pressure vessel rather than prestressed concrete found in Fort St. Vrain; and the use of helium as a primary coolant rather than CO2. Other lessons learned, 68 in total, are documented in Sections 2 through 6 and will be applied, as appropriate, in advancing phases of design. The lessons learned are derived from both negative and positive outcomes from prior HTGR experiences. Lessons learned are grouped according to the plant, areas, systems, subsystems, and components defined in the NGNP Preconceptual Design Report, and subsequent NGNP project documents.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Brentwood Lessons Learned Project Report

The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.

30 DIRECT ENERGY CONVERSION↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned in International Safeguards - Implementation of Safeguards at the Rokkasho Reprocessing Plant

The focus of this report is lessons learned at the Rokkasho Reprocessing Plant (RRP). However, the subject of lessons learned for application of international safeguards at reprocessing plants includes a cumulative history of inspections starting at the West Valley (New York, U.S.A.) reprocessing plant in 1969 and proceeding through all of the efforts over the years. The RRP is the latest and most challenging application the International Atomic Energy Agency has faced. In many ways the challenges have remained the same, timely inspection and evaluation with limited inspector resources, with the continuing realization that planning and preparations can never start early enough in the life cycle of a facility. Lessons learned over the years have involved the challenges of using ongoing advances in technology and dealing with facilities with increased throughput and continuous operation. This report will begin with a review of historical developments and lessons learned. This will provide a basis for a discussion of the experiences and lessons learned from the implementation of international safeguards at RRP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned from Safety Events

The Hydrogen Incident Reporting and Lessons Learned website (www.h2incidents.org) was launched in 2006 as a database-driven resource for sharing lessons learned from hydrogen-related safety events to raise safety awareness and encourage knowledge-sharing. The development of this database, its first uses and subsequent enhancements have been described at the Second and Third International Conferences on Hydrogen Safety. [1,2] Since 2009, continuing work has not only highlighted the value of safety lessons learned, but enhanced how the database provides access to another safety knowledge tool, Hydrogen Safety Best Practices (http://h2bestpractices.org). Collaborations with the International Energy Agency (IEA) Hydrogen Implementing Agreement (HIA) Task 19 – Hydrogen Safety and others have enabled the database to capture safety event learnings from around the world. This paper updates recent progress, highlights the new “Lessons Learned Corner” as one means for knowledge-sharing and examines the broader potential for collecting, analyzing and using safety event information.

Hydrogen↗

Solid-State Lighting: Early Lessons Learned on the Way to Market

The purpose of this report is to document early challenges and lessons learned in the solid-state lighting (SSL) market development as part of the DOE’s SSL Program efforts to continually evaluate market progress in this area. This report summarizes early actions taken by DOE and others to avoid potential problems anticipated based on lessons learned from the market introduction of compact fluorescent lamps and identifies issues, challenges, and new lessons that have been learned in the early stages of the SSL market introduction. This study identifies and characterizes12 key lessons that have been distilled from DOE SSL program results.

CFLs↗

Hydrogen Fuel Cell Analysis: Lessons Learned from Stationary Power Generation Final Report

This study considered opportunities for hydrogen in stationary applications in order to make recommendations related to RD&D strategies that incorporate lessons learned and best practices from relevant national and international stationary power efforts, as well as cost and environmental modeling of pathways. The study analyzed the different strategies utilized in power generation systems and identified the different challenges and opportunities for producing and using hydrogen as an energy carrier. Specific objectives included both a synopsis/critical analysis of lessons learned from previous stationary power programs and recommendations for a strategy for hydrogen infrastructure deployment. This strategy incorporates all hydrogen pathways and a combination of distributed power generating stations, and provides an overview of stationary power markets, benefits of hydrogen-based stationary power systems, and competitive and technological challenges. The motivation for this project was to identify the lessons learned from prior stationary power programs, including the most significant obstacles, how these obstacles have been approached, outcomes of the programs, and how this information can be used by the Hydrogen, Fuel Cells & Infrastructure Technologies Program to meet program objectives primarily related to hydrogen pathway technologies (production, storage, and delivery) and implementation of fuel cell technologies for distributed stationary power. In addition, the lessons learned address environmental and safety concerns, including codes and standards, and education of key stakeholders.

08 HYDROGEN↗

Safeguards Culture: Lessons Learned

Abstract: At the 2005 INMM/ESARDA Workshop in Santa Fe, New Mexico, I presented a paper entitled “Changing the Safeguards Culture: Broader Perspectives and Challenges.” That paper described a set of theoretical models that can be used as a basis for evaluating changes to safeguards culture. This paper builds on that theoretical discussion to address practical methods for influencing culture. It takes lessons from methods used to influence change in safety culture and security culture, and examines the applicability of these lessons to changing safeguards culture. Paper: At the 2005 INMM/ESARDA Workshop on “Changing the Safeguards Culture: Broader Perspectives and Challenges,” in Santa Fe, New Mexico, I presented a paper entitled “Changing the Safeguards Culture: Broader Perspectives and Challenges.” That paper, coauthored by Karyn R. Durbin and Andrew Van Duzer, described a set of theoretical models that can be used as a basis for evaluating changes to safeguards culture. This paper updates that theoretical discussion, and seeks to address practical methods for influencing culture. It takes lessons from methods used to influence change in safety culture and security culture, and examines the applicability of these lessons to changing safeguards culture. Implicit in this discussion is an understanding that improving a culture is not an end in itself, but is one method of improving the underlying discipline, that is safety, security, or safeguards. Culture can be defined as a way of life, or general customs and beliefs of a particular group of people at a particular time. There are internationally accepted definitions of safety culture and nuclear security culture. As yet, there is no official agreed upon definition of safeguards culture. At the end of the paper I will propose my definition. At the Santa Fe Workshop the summary by the Co-Chairs of Working Group 1, “The Further Evolution of Safeguards,” noted: “It is clear that ‘safeguards culture’ needs to be addressed if the efficiency and effectiveness are to continue to be improved. This will require commitment and change at all levels, from States to facility operators. Cultural change has to come from good leadership, doing the right thing and ‘beliefs’ are not sufficient – behavior is what counts. We are optimistic that with sufficient effort and the right incentives, change can be accomplished quickly.”

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Considerations for Implementing an Organizational Lessons Learned Process

This report examines the lessons learned process by a review of the literature in a variety of disciplines, and is intended as a guidepost for organizations that are considering the implementation of their own closed-loop learning process. Lessons learned definitions are provided within the broader context of knowledge management and the framework of a learning organization. Shortcomings of existing practices are summarized in an attempt to identify common pitfalls that can be avoided by organizations with fledgling experiences of their own. Lessons learned are then examined through a dual construct of both process and mechanism, with emphasis on integrating into organizational processes and promoting lesson reuse through data attributes that contribute toward changed behaviors. The report concludes with recommended steps for follow-on efforts.

99 GENERAL AND MISCELLANEOUS↗

The Fernald Closure Project: Lessons Learned

For nearly 37 years, the U.S. Department of Energy site at Fernald - near Cincinnati, Ohio - produced 230,000 metric tons (250,000 short tons) of high-purity, low-enriched uranium for the U.S. Defense Program, generating more than 5.4 million metric tons (6 million short tons) of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion mega environmental-remediation project that was completed in October 2006. Project evolved through four phases: - Conducting remedial-investigation studies to determine the extent of damage to the environment and groundwater at, and adjacent to, the production facilities; - Selecting cleanup criteria - final end states that had to be met that protect human health and the environment; - Selecting and implementing the remedial actions to meet the cleanup goals; - Executing the work in a safe, compliant and cost-effective manner. In the early stages of the project, there were strained relationships - in fact total distrust - between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholders groups in the decision-making process, the DOE and Fluor developed a public-participation strategy to open the channels of communication with the various parties: site leadership, technical staff and regulators. This approach proved invaluable to the success of the project, which has become a model for future environmental remediation projects. This paper will summarize the history and shares lessons learned: the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies achieved. Lessons learned fall into ten categories: - Regulatory approach with end-state determinations; - Interaction with stakeholders; - The balanced approach - on-site and off-site waste-disposal alternatives; - The contracting model; - Site safety performance; - Effectiveness of cleanup remedies; - Worker training and transition; - Client interface; - Cost and schedule performance; - Legacy management. Lessons learned can be applied: While each site and project has its own issues, the various lessons learned from the Fernald Closure Project, when taken from a global perspective, can be applied to similar efforts so that pitfalls are avoided and efficiencies realized.

54 ENVIRONMENTAL SCIENCES↗

The Nuclear Accident at Three Mile Island a Practical Lesson in the Fundamental Importance of Effective Communications

The Three Mile Island Unit 2 (TMI-2) accident in March 1979 had a profound effect on the course of commercial nuclear generation in the United States and around the world. And while the central elements of the accident were matters of nuclear engineering, design and operations, its consequences were compounded, and in some respects superseded, by extraordinarily ineffective communications by all parties at all levels. Communications failures during the accident and its aftermath caused misunderstanding, distrust, and incorrect emergency response - and seeded or reinforced public opposition to nuclear power that persists to this day. There are communications lessons from TMI that have not yet been fully learned, and some that once were learned but are now gradually being forgotten. The more glaring TMI communications problems were in the arena of external interactions and communications among the plant owner, the Nuclear Regulatory Commission (NRC), the media, and the public. Confusing, fragmented, and contradictory public statements early in the accident, regardless of cause, undermined all possibility for reasonable discourse thereafter. And because the TMI accident was playing out on a world stage, the breakdown in public trust had long term and widespread implications. At the plant site, both TMI-2 cleanup and restart of the undamaged TMI-1 unit met with years of public and political criticism, and attendant regulatory pressure. Across the nation, public trust in nuclear power and those who operate it plummeted, unquestionably contributing to the 25+ year hiatus in new plant orders. There were other, less visible but equally important, consequences of ineffective communications at TMI. The unplanned 'precautionary' evacuation urged by the governor two days after the accident - a life changing, traumatic event for thousands of residents - was prompted primarily by misunderstandings and miscommunications regarding the condition of the plant. And today, nearly 30 years after the event, many in our nuclear industry have insufficient knowledge or regard for the underlying nuclear safety vulnerabilities revealed by the accident, in part because these have not been well explained. From this single, compelling experience, many lessons can be drawn. Some of these were recognized early and taken to heart by those who own and operate nuclear plants - but over time, respect for their importance has given way somewhat to the seemingly more urgent practicalities of plant cost, schedule and production goals. In other cases, the lessons have remained largely obscure. This paper will describe in greater detail the communications aspects of the TMI accident, lessons that can be drawn from them, and their implications on current and future nuclear facility operation. The paper reflects the author's personal, direct experience as part of the accident response team and subsequent cleanup operations at TMI. In summary: The Three Mile Accident was the most severe nuclear accident in U.S. history. It also is perhaps the most studied industrial accident of any kind in U.S. history. Exhaustive examinations of the public health consequences of the accident show convincingly that the effects of radioactivity releases, if any, were imperceptibly low. It is generally agreed, however, that there have been perceptible health consequences from the TMI-2 accident - those linked to stress. Stress to members of the public, particularly those living near the plant, was unquestionably high. And for some the combination of rumor, confusion, contradictory reports and uncertainty, all leading to an evacuation recommendation from the governor, took a toll. It could be argued that the ineffective internal and external communications during the course of the event were as influential to the outcome as the equipment and operational breakdowns that are now so well understood. And for that reason alone, this accident points out that communications capabilities - staffing, systems, facilities, training - can be as important to protection of the public, the plant and the environment as are the plant material and technical issues that receive constant attention. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Lessons from the Bevatron Accelerator Demolition - 12191

The Bevatron accelerator at Lawrence Berkeley National Laboratory is the first DOE accelerator to be demolished. While there are many lessons learned from its demolition, this paper focuses on the following lessons learned that may be useful for other D and D projects: bounding project scope to ensure success, hazards mapping for focused characterization and remediation, establishing radiological evaluation criteria, and forecasting activation products. With D and D of many DOE accelerators likely to occur in the near future, these lessons learned should be considered in planning those projects. These lessons learned are likely to be applicable to other D and D projects as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Restoration Disposal Facility Lessons Learned

The purpose of lessons learned is to identify insight gained during a project – successes or failures – that can be applied on future projects. Lessons learned can contribute to the overall success of a project by building on approaches that have worked well and avoiding previous mistakes. Below are examples of lessons learned during ERDF’s ARRA-funded expansion project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

University Reactor Conversion Lessons Learned Workshop for Purdue University Reactor

The Department of Energy’s Idaho National Laboratory, under its programmatic responsibility for managing the University Research Reactor Conversions, has completed the conversion of the reactor at Purdue University Reactor. With this work completed and in anticipation of other impending conversion projects, the INL convened and engaged the project participants in a structured discussion to capture the lessons learned. The lessons learned process has allowed us to capture gaps, opportunities, and good practices, drawing from the project team’s experiences. These lessons will be used to raise the standard of excellence, effectiveness, and efficiency in all future conversion projects.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Lessons learned from the pioneering hot dry rock project at Fenton Hill, USA

Interest in geothermal energy production has grown rapidly in recent years due to the increasing demand for clean, renewable, domestic energy. Recent publications have suggested that geothermal energy from Enhanced Geothermal Systems could satisfy a large portion of the energy needs in the U.S. if the technology were implemented on a large scale. Pertinent to this goal are many of the lessons learned from the pioneering Hot Dry Rock project aimed at producing usable energy form the heat of the earth, conducted from 1970 to 1995 at Fenton Hill, New Mexico, USA. During this project, the Los Alamos National Laboratory created and tested two reservoirs at depths in the range of 2.8–3.5 km in crystalline rock formations underlying the Fenton Hill site. Thermal energies in the range of 3–10 MWt were produced demonstrating the technical feasibility of the concept. Many important lessons were learned regarding the creation, engineering and operation of such subsurface systems—these lessons will prove valuable as the geothermal community moves towards the goal of realizing the immense potential of this ubiquitous renewable energy resource. The purpose here is to provide a brief, easy to read overview of this pioneering project.

58 GEOSCIENCES↗

Best Practices and Lessons Learned from Deploying and Operating Large-Scale Data-Centric Parallel File Systems, In: SC '14: Proceedings of the International Conference for High Performance Computing, Networking, Storage and Analysis

The Oak Ridge Leadership Computing Facility (OLCF) has deployed multiple large-scale parallel file systems (PFS) to support its operations. During this process, OLCF acquired significant expertise in large-scale storage system design, file system software development, technology evaluation, benchmarking, procurement, deployment, and operational practices. Based on the lessons learned from each new PFS deployment, OLCF improved its operating procedures, and strategies. This paper provides an account of our experience and lessons learned in acquiring, deploying, and operating large-scale parallel file systems. We believe that these lessons will be useful to the wider HPC community.

Computer Science↗

Lessons from Iowa: Development of a 270 Megawatt Compressed Air Energy Storage Project in Midwest Independent System Operator

The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

25 ENERGY STORAGE↗