Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Tailored Concept of Operations for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this project is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services.

Systems↗

Tailoring a ConOps for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this paper is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services. This tailoring effort was performed as the authors final Masters Project in the Spring of 2016 for the Stevens Institute of Technology and modified for publication with INCOSE (Owens, 2016).

Knowledge↗

Business Plan: The Virginia Space Flight Center

The Virginia Commercial Space Flight Authority (VCSFA) was established on July 1, 1995 and codified at Sections 9-266.1 et seq., Code of Virginia. It is governed by an eleven person Board of Directors representing industry, state and local government and academia. VCSFA has designated the Center for Commercial Space Infrastructure as its Executive Directorate and Operating Agent. This Business Plan has been developed to provide information to prospective customers, prospective investors, state and federal government agencies, the VCSFA Board and other interested parties regarding development and operation of the Virginia Space Flight Center (VSFC) at Wallops Island. The VSFC is an initiative sponsored by VCSFA to achieve its stated objectives in the areas of economic development and education. Further, development of the VSFC is in keeping with the state's economic goals set forth in Opportunity Virginia, the strategic plan for jobs and prosperity, which are to: (1) Strengthen the rapidly growing aerospace industry in space based services including launch services, remote sensing, satellite manufacturing and telecommunications; and (2) Capitalize on intellectual and technical resources throughout the state and become a leader in the development of advanced technology businesses.

Reed, Billie M.↗

Ensuring Payload Safety in Missions with Special Partnerships

The National Aeronautics and Space Administration (NASA) Expendable Launch Vehicle (ELV) payload space flight missions involve cooperative work between NASA and partners including spacecraft (or payload) contractors, universities, nonprofit research centers, Agency payload organization, Range Safety organization, Agency launch service organizations, and launch vehicle contractors. The role of NASA's Safety and Mission Assurance (SMA) Directorate is typically fairly straightforward, but when a mission's partnerships become more complex, to realize cost and science benefits (e.g., multi-agency payload(s) or cooperative international missions), the task of ensuring payload safety becomes much more challenging. This paper discusses lessons learned from NASA safety professionals working multiple-agency missions and offers suggestions to help fellow safety professionals working multiple-agency missions.

Agency launch service organizations↗

Lunar and martian meteorite delivery services

Launch mechanisms for lunar and martian meteorites have been investigated, by integrating physical modeling constraints, geochemical cosmic-ray exposure (CRE) constraints, and petrologic constraints. The potential source region for lunar meteorites is remarkably small compared to the final crater volume. CRE constraints indicate that most launches start at depths of less than or equal to 3.2 m, and cratering theory implies derivation of suitably accelerated objects from a subvolume with diameter only about 0.3 x the final crater diameter. The shallow depth provenance is probably related to shock-wave interference, enhanced by the lunar regolith's extremely low compressional wave velocity. CRE constraints alone imply that four to five separate launch events are represented among the eight well-studied lunar meteorites. Most of the lunar meteorites are regolith breccias, which tend to show only limited compositional diversity within any kilometer-scale region of the Moon. Several others are polymict breccias, which also show relatively subdued compositional diversity, compared to igneous rocks. The observed diversity among these samples in terms of abundances of mare basalt and KREEP, and in Mg/(Mg + Fe) ratio, implies that among eight well-studied lunar meteorites only two potential source craters pairings are plausible: between Asuka-881757 + Y-793169 (most probable) and between Y-793274 + EET875721. Altogether, these eight lunar meteorites apparently represent at least six separate source craters, including three in the past 10(exp 5) years and five in the past 10(exp 6) years. CRE constraints imply that SNC meteorites are launched from systematically greater than lunar meteorites. SNCs are also systematically bigger, and all nine well-studied SNCs are uncommonly young (by martian standards) mafic igneous rocks. Comparison between Viking and Apollo results reveals that rocks the size of common meteorites are remarkably scarce in the martian regolith, probably due to pervasive weathering. A plausible explanation for these trends is that most old, small, and shallow rocks on Mars have been weakened by a two-stage process of brecciation followed by pervasive weathering, to the point where they seldom survive the stresses of spallation off the planet. The scarcity of source-crater pairing among the lunar meteorites implies that these objects can be launched from craters much smaller than previously estimated and tends to support the suggestion of Rabinowitz (1993) that present-day cratering rates for the Earth-Moon region may be higher than previously estimated.

Warren, Paul H.↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE)

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for Gateway’s Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U) CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of cross-link ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle utilizing their Photon upper stage to deploy the CAPSTONE spacecraft into lunar orbit. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from Rocket Lab’s Photon stage and traversed an approximately 4 month highly efficient transfer phase entering the NRHO Novermber 13, 2022 for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is lead by Advanced Space, LLC. Spacecraft development and mission operations is conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstration of the accessibility of NHROs, validation of key operational concepts in the NHRO environment, laying the foundation for commercial support of future lunar operations, and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and stationkeeping requirements for Gateway’s Power and Propulsion Element. Therefore, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U)+ CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of crosslink ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip-scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle using their Photon upper stage to deploy the CAPSTONE spacecraft. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from the Photon stage and traversed an approximately 4-month, highly fuel-efficient transfer phase entering the NRHO November 13, 2022, for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is led by Advanced Space, LLC. Spacecraft development and mission operations are conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstrating the accessibility of NHROs; validating key operational concepts in the NHRO environment; laying the foundation for commercial support of future lunar operations; and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA’s Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Flight Avionics Sequencing Telemetry (FAST) DIV Latching Display

The NASA Engineering (NE) Directorate at Kennedy Space Center provides engineering services to major programs such as: Space Shuttle, Inter national Space Station, and the Launch Services Program (LSP). The Av ionics Division within NE, provides avionics and flight control syste ms engineering support to LSP. The Launch Services Program is respons ible for procuring safe and reliable services for transporting critical, one of a kind, NASA payloads into orbit. As a result, engineers mu st monitor critical flight events during countdown and launch to asse ss anomalous behavior or any unexpected occurrence. The goal of this project is to take a tailored Systems Engineering approach to design, develop, and test Iris telemetry displays. The Flight Avionics Sequen cing Telemetry Delta-IV (FAST-D4) displays will provide NASA with an improved flight event monitoring tool to evaluate launch vehicle heal th and performance during system-level ground testing and flight. Flight events monitored will include data from the Redundant Inertial Fli ght Control Assembly (RIFCA) flight computer and launch vehicle comma nd feedback data. When a flight event occurs, the flight event is ill uminated on the display. This will enable NASA Engineers to monitor c ritical flight events on the day of launch. Completion of this project requires rudimentary knowledge of launch vehicle Guidance, Navigatio n, and Control (GN&C) systems, telemetry, and console operation. Work locations for the project include the engineering office, NASA telem etry laboratory, and Delta launch sites.

Moore, Charlotte↗

Building a Metric

Launch Services Program is a Kennedy Space Center based program whose job it is to undertake all the necessary roles required to successfully launch Expendable Launch Vehicles. This project was designed to help Launch Services Program accurately report how successful they have been at launching missions on time or +/- 2 days from the scheduled launch date and also if they weren't successful, why. This information will be displayed in the form of a metric, which answers these questions in a clear and accurate way.

Spencer, Shakira↗

ELaNa - Educational Launch of Nanosatellite Providing Routine RideShare Opportunities

Since the creation of the NASA CubeSat Launch Initiative (NCSLI), the need for CubeSat rideshares has dramatically increased. After only three releases of the initiative, a total of 66 CubeSats now await launch opportunities. So, how is this challenge being resolved? NASA's Launch Services Program (LSP) has studied how to integrate PPODs on Athena, Atlas V, and Delta IV launch vehicles and has been instrumental in developing several carrier systems to support CubeSats as rideshares on NASA missions. In support of the first two ELaNa missions the Poly-Picosatellite Orbital Deployer (P-POD) was adapted for use on a Taurus XL (ELaNa I) and a Delta n (ELaNa III). Four P-PODs, which contained a total eight CubeSats, were used on these first ELaNa missions. Next up is ELaNa VI, which will launch on an Atlas V in August 2012. The four ELaNa VI CubeSats, in three P-PODs, are awaiting launch, having been integrated in the NPSCuLite. To increase rideshare capabilities, the Launch Services Program (LSP) is working to integrate P-PODs on Falcon 9 missions. The proposed Falcon 9 manifest will provide greater opportunities for the CubeSat community. For years, the standard CubeSat size was 1 U to 3U. As the desire to include more science in each cube grows, so does the standard CubeSat size. No longer is a 1 U, 1.5U, 2U or 3U CubeSat the only option available; the new CubeSat standard will include 6U and possibly even 12U. With each increase in CubeSat size, the CubeSat community is pushing the capability of the current P-POD design. Not only is the carrier system affected, but integration to the Launch Vehicle is also a concern. The development of a system to accommodate not only the 3U P-POD but also carriers for larger CubeSats is ongoing. LSP considers payloads in the lkg to 180 kg range rideshare or small/secondary payloads. As new and emerging small payloads are developed, rideshare opportunities and carrier systems need to be identified and secured. The development of a rideshare carrier system is not always cost effective. Sometimes a launch vehicle with an excellent performance record appears to be a great rideshare candidate however, after completing a feasibility study, LSP may determine that the cost of the rideshare carrier system is too great and, due to budget constraints, the development cannot go forward. With the current budget environment, one cost effective way to secure rideshare opportunities is to look for synergy with other government organizations that share the same interest.

Skrobot, Garrett Lee↗

Mars 2020 Model Based Systems Engineering Pilot

The pilot study is led by the Integration Engineering group in NASA's Launch Services Program (LSP). The Integration Engineering (IE) group is responsible for managing the interfaces between the spacecraft and launch vehicle. This pilot investigates the utility of Model-Based Systems Engineering (MBSE) with respect to managing and verifying interface requirements. The main objectives of the pilot are to model several key aspects of the Mars 2020 integrated operations and interface requirements based on the design and verification artifacts from Mars Science Laboratory (MSL) and to demonstrate how MBSE could be used by LSP to gain further insight on the interface between the spacecraft and launch vehicle as well as to enhance how LSP manages the launch service. The method used to accomplish this pilot started through familiarization of SysML, MagicDraw, and the Mars 2020 and MSL systems through books, tutorials, and NASA documentation. MSL was chosen as the focus of the model since its processes and verifications translate easily to the Mars 2020 mission. The study was further focused by modeling specialized systems and processes within MSL in order to demonstrate the utility of MBSE for the rest of the mission. The systems chosen were the In-Flight Disconnect (IFD) system and the Mass Properties process. The IFD was chosen as a system of focus since it is an interface between the spacecraft and launch vehicle which can demonstrate the usefulness of MBSE from a system perspective. The Mass Properties process was chosen as a process of focus since the verifications for mass properties occur throughout the lifecycle and can demonstrate the usefulness of MBSE from a multi-discipline perspective. Several iterations of both perspectives have been modeled and evaluated. While the pilot study will continue for another 2 weeks, pros and cons of using MBSE for LSP IE have been identified. A pro of using MBSE includes an integrated view of the disciplines, requirements, and verifications leading up to launch. The model allows IE to understand the relationships between disciplines throughout test activities and verifications. Additionally, the relationships between disciplines and integration tasks are generally consistent. The model allows for the generic relationships and tasks to be captured and used throughout multiple mission models should LSP further pursue MBSE. A con of MBSE is the amount of time it takes upfront to understand MBSE and create a useful model. The upfront time it takes to create a useful model is heavily discussed in MBSE literature and is a consistent con throughout the known applications of MBSE. The need to understand SysML and the software chosen also poses the possibility of a "bottleneck" or one person being the sole MBSE user for the working group. The utility of MBSE will continue to be evaluated through the remainder of the study. In conclusion, the original objectives of the pilot study were to use artifacts from MSL to model key aspects of Mars 2020 and demonstrate how MBSE could be used by LSP to gain insight into the spacecraft and launch vehicle interfaces. Progress has been made in modeling and identifying the utility of MBSE to LSP IE and will continue to be made until the pilot study's conclusion in mid-August. The results of this study will produce initial models, modeling instructions and examples, and a summary of MBSE's utility for future use by LSP.

Dukes, Alexandra Marie↗

Consort Suborbital Rocket Series: Starfire I on Launch Rail

The enclosed report provides information on the sixth flight of the Consort suborbital rocket series. Consort 6 is currently scheduled for launch on February 19, 1993, with lift off at 11:00 a.m., Mountain Time. It will carry seven materials and biotechnology experiments, two accelerometer systems, a controller and battery packs in a module nearly 12 feet tall and weighing approximately 1,004 pounds. Consort 6 will reach an apogee of approximately 200 miles providing about 7 minutes of microgravity time. The entire mission, from launch to touchdown, is expected to last approximately 15 minutes. The Consort series is part of a unique suborbital rocket launch services program conducted by the Office of Advanced Concepts and Technology (OACT) in conjunction with its Centers for the Commercial Development of Space (CCDS). This service is managed through the Consortium for Materials Development in Space (CMDS), a CCDS based University of Alabama in Huntsville (UAH). This suborbital rocket program provides CCDS investigators with a microgravity environment to achieve commercial development objectives, or to test developmental hardware or techniques in preparation for orbital flights or additional follow-on work. Rocket and launch services for Consort 6, including use of the Starfire 1 launch vehicle, are provided by EER Systems Corporation. Integration of the payload into Starfire 1 will be handled by McDonnell Douglas Space Systems Company.

Source record↗

Summer 2014 Pathways Report

Over the summer I had the exciting opportunity to work for NASA at the Kennedy Space Center as a Mission Assurance Engineering intern. When I was offered a position in mission assurance for the Safety and Mission Assurance directorate's Launch Services Division, I didn't really know what I would be doing, but I knew it would be an excellent opportunity to learn and grow professionally. In this report I will provide some background information on the Launch Services Division, as well as detail my duties and accomplishments during my time as an intern. Additionally, I will relate the significance of my work experience to my current academic work and future career goals. This report contains background information on Mission Assurance Engineering, a description of my duties and accomplishments over the summer of 2014, and relates the significance of my work experience to my school work and future career goals. It is a required document for the Pathways program.

Pathways↗

Measurement of Global Precipitation: Introduction to International GPM Program

The Global Precipitation Measurement (GPM) Program is an international cooperative effort whose objectives are to (a) obtain better understanding of rainfall processes, and (b) make frequent rainfall measurements on a global basis. The National Aeronautics and Space Administration (NASA) of the United States and the Japanese Aviation and Exploration Agency (JAXA) have entered into a cooperative agreement for the formulation and development of GPM. This agreement is a continuation of the partnership that developed the highly successful Tropical Rainfall Measuring Mission (TRMM) that was launched in November 1997; this mission continues to provide valuable scientific and meteorological information on rainfall and the associated processes. International collaboration on GPM from other space agencies has been solicited, and discussions regarding their participation are currently in progress. NASA has taken lead responsibility for the planning and formulation of GPM. Key elements of the Program to be provided by NASA include a Core satellite instrumented with a multi-channel microwave radiometer, a Ground Validation System and a ground-based Precipitation Processing System (PPS). JAXA will provide a Dual-frequency Precipitation Radar for installation on the Core satellite and launch services. Other United States agencies and international partners may participate in a number of ways, such as providing rainfall measurements obtained from their own national space-borne platforms, providing local rainfall measurements to support the ground validation activities, or providing hardware or launch services for GPM constellation spacecraft.

Hwang, P.↗