Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated test stand”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Advanced Prototype Fan Operating Experience, Post Test Evaluation, and Refurbishment for PLSS 2.0 Test Use

NASA s plans for Extravehicular Activity (EVA) portable life support systems for future exploration missions result in different design requirements than those which led to the combined fan / pump / separator in the current ISS Extravehicular Mobility Unit (EMU). To meet these new requirements, NASA contracted with Hamilton Sundstrand to provide two new prototype fans designed to meet anticipated future system requirements. Based on design trade studies, a high speed fan with mechanical bearing support of the rotating elements and a novel non-metallic barrier canned motor design was developed and implemented in the deliverable prototypes. The prototypes, which used two different bearing lubricants, have been extensively tested in both stand-alone and integrated system tests in NASA laboratories and proven to meet the anticipated performance requirements. Subsequently, they have been subjected to post test inspection and analysis in Hamilton Sundstrand laboratories to assess the effects of integrated operation and resultant exposure to vent loop contaminants. Results have confirmed expectations that one of the lubricants would be superior in this application and the prototype fans have been reassembled with new bearings with the superior lubricant. They have now been returned to the Johnson Space Center for further testing and maturation as part of NASA s PLSS 2.0 integrated test effort. This paper will discuss the test history of these units, resulting test data, the results of post test evaluation, and plans for further testing in the near future.

Hodgson, Edward↗

Design Concepts for an Optimized, Modular, and Scalable Liquid Amine Test Stand

The Air Revitalization Labs at NASA Ames Research Center (ARC) is investigating liquid amines to for their performance removing spacecraft carbon dioxide (CO2) for crewed space missions. Development of the current one-crew scale amine test stand stems from several modifications to a test stand initially built at NASA Johnson Space Center (JSC) This sub-scale system has been modified to incorporate a flow spreader for the inlet air stream, an updated contactor design for CO2 capture, a degasser to regenerate the liquid sorbent and recover the captured CO2, and a condenser to reduce water loss. Results from the existing integrated liquid amine test stand have provided valuable insight, but continued performance optimization requires design and build of a new integrated test system. New design concepts will institute a modular configuration to allow for interfacing with novel contactor and degasser architecture, parallel or series flow pathways for the air stream and liquid sorbent, and scaling up to a 4-crew CO2 removal system.

Tiago Faria Costa↗

Payload Utilization in NASA's Space Launch System

A revitalized National Space Council has directed NASA to return to the moon, with a series of preparatory missions paving the way for eventual human exploration. NASA's new deep space exploration system -- the heavy-lift Space Launch System (SLS), the Orion crew spacecraft and revitalized launch facilities at Kennedy Space Center -- will enable NASA and its commercial and international partners to meet these goals for human deep space exploration. SLS will be the most capable launch vehicle for these efforts, with an initial Block 1 capability of at least 26 metric tons (t) to trans-lunar injection (TLI). A more powerful Block 1B, available in crew and cargo configurations, with have the power to loft more than 37 t to TLI; the ultimate Block 2 variant will lift more than 45 t to TLI. For payload utilization, the Block 1 vehicle will carry 13 6U CubeSats as secondary payloads while the Block 1B crew vehicle will provide as much volume as the space shuttle payload bay in a Universal Stage Adapter (USA). Block 1B cargo vehicles will offer 8.4 m fairings in 19.1 m and 27.4 m lengths, with enough volume to accommodate habitat modules and landers. For missions beyond the Earth-moon system, SLS offers greater characteristic energy (C3), enabling faster transit or heavier payloads to the outer planets. The first mission of SLS and Orion, launching no earlier than December 2019, will send Orion into lunar distant retrograde orbit (DRO) on an approximately 25-day shakedown cruise known as Exploration Mission-1 (EM-1), enabling NASA to verify and validate new systems before sending astronauts to deep space on the next exploration mission. The SLS program and its prime contractors have made significant progress toward first launch, with several major components of the vehicle completed and delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center. Major forward work includes integrating tanks, engines and other major sections into the EM-1 core stage at Michoud Assembly Facility and then shipping the entire core stage assembly to Stennis Space Center. There, it will be installed in the refurbished B-2 test stand for a series of integrated stage tests culminating in a green run hotfire test. The Program's Spacecraft Payload Integration and Evolution (SPIE) Office, responsible for the in-space stage, adapters and payload interfaces, has largely completed its effort on the Block 1 vehicle and is supporting manufacture of the first Block 1B vehicle. This paper will provide an overview of the Block 1 vehicle, its expected capabilities, secondary payload accommodations and manufacturing status, including structural testing and the challenges of developing a new launch vehicle. A lookahead to the Block 1B vehicle and the payload utilization opportunities it will provide in the 2020s will also be discussed, including the unique capabilities of the vehicle.

Creech, Stephen D.↗

Flat Surface Damage Detection System (FSDDS)

The Flat Surface Damage Detection system (FSDDS} is a sensory system that is capable of detecting impact damages to surfaces utilizing a novel sensor system. This system will provide the ability to monitor the integrity of an inflatable habitat during in situ system health monitoring. The system consists of three main custom designed subsystems: the multi-layer sensing panel, the embedded monitoring system, and the graphical user interface (GUI). The GUI LABVIEW software uses a custom developed damage detection algorithm to determine the damage location based on the sequence of broken sensing lines. It estimates the damage size, the maximum depth, and plots the damage location on a graph. Successfully demonstrated as a stand alone technology during 2011 D-RATS. Software modification also allowed for communication with HDU avionics crew display which was demonstrated remotely (KSC to JSC} during 2012 integration testing. Integrated FSDDS system and stand alone multi-panel systems were demonstrated remotely and at JSC, Mission Operations Test using Space Network Research Federation (SNRF} network in 2012. FY13, FSDDS multi-panel integration with JSC and SNRF network Technology can allow for integration with other complementary damage detection systems.

Williams, Martha↗

Test and Verification Approach for the NASA Constellation Program

This viewgraph presentation is a test and verification approach for the NASA Constellation Program. The contents include: 1) The Vision for Space Exploration: Foundations for Exploration; 2) Constellation Program Fleet of Vehicles; 3) Exploration Roadmap; 4) Constellation Vehicle Approximate Size Comparison; 5) Ares I Elements; 6) Orion Elements; 7) Ares V Elements; 8) Lunar Lander; 9) Map of Constellation content across NASA; 10) CxP T&V Implementation; 11) Challenges in CxP T&V Program; 12) T&V Strategic Emphasis and Key Tenets; 13) CxP T&V Mission & Vision; 14) Constellation Program Organization; 15) Test and Evaluation Organization; 16) CxP Requirements Flowdown; 17) CxP Model Based Systems Engineering Approach; 18) CxP Verification Planning Documents; 19) Environmental Testing; 20) Scope of CxP Verification; 21) CxP Verification - General Process Flow; 22) Avionics and Software Integrated Testing Approach; 23) A-3 Test Stand; 24) Space Power Facility; 25) MEIT and FEIT; 26) Flight Element Integrated Test (FEIT); 27) Multi-Element Integrated Testing (MEIT); 28) Flight Test Driving Principles; and 29) Constellation s Integrated Flight Test Strategy Low Earth Orbit Servicing Capability.

Strong, Edward↗

Building on 50 Years of Systems Engineering Experience for a New Era of Space Exploration

Over the past 50 years, the National Aeronautics and Space Administration (NASA) has delivered space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides the United States (US) capability for both crew and heavy cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010. In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The goals for this new system include increased safety and reliability coupled with lower operations costs that promote sustainable space exploration for decades to come. The Ares I will loft the Orion crew exploration vehicle, while the heavy-lift Ares V will carry the Altair lunar lander, as well as the equipment and supplies needed to construct a lunar outpost for a new generation of human and robotic space pioneers. NASA's Marshall Space Flight Center manages the Shuttle's propulsion elements and is managing the design and development of the Ares rockets, along with a host of other engineering assignments in the field of scientific space exploration. Specifically, the Marshall Center's Engineering Directorate houses the skilled workforce and unique facilities needed to build capable systems upon the foundation laid by the Mercury, Gemini, Apollo, and Shuttle programs. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level testing activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity and to validate computer modeling and simulation, as well as the main propulsion test article analysis to be conducted in the Static Test Stand. Ultimately, fielding a robust space transportation solution that will carry international explorers and essential payloads will pave the way for a new era of scientific discovery now dawning beyond planet Earth.

Dumbacher, Daniel L.↗

Engineering America's Current and Future Space Transportation Systems: 50 Years of Systems Engineering Innovation for Sustainable Exploration

Over the past 50 years, the National Aeronautics and Space Administration (NASA) has delivered space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides the United States' (U.S.) capability for both crew and heavy cargo to low-Earth orbit to' construct the International Space Station, before the Shuttle is retired in 2010. In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle (Figure 1). The goals for this new system include increased safety and reliability coupled with lower operations costs that promote sustainable space exploration for decades to come. The Ares I will loft the Orion Crew Exploration Vehicle, while the heavy-lift Ares V will carry the Altair Lunar Lander and the equipment and supplies needed to construct a lunar outpost for a new generation of human and robotic space pioneers. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level test activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity and to validate computer modeling and simulation (Figure 2), as well as the main propulsion test article analysis to be conducted in the Static Test Stand. These activities also will help prove and refine mission concepts of operation, while supporting the spectrum of design and development work being performed by Marshall's Engineering Directorate, ranging from launch vehicles and lunar rovers to scientific spacecraft and associated experiments. Ultimately, fielding a robust space transportation solution that will carry international explorers and essential payloads will pave the way for a new century of scientific discovery beyond planet Earth.

Dmbacher, Daniel L.↗

Development of Onboard Computer Complex for Russian Segment of ISS

Report present a description of the Onboard Computer Complex (CC) that was developed during the period of 1994-1998 for the Russian Segment of ISS. The system was developed in co-operation with NASA and ESA. ESA developed a new computation system under the RSC Energia Technical Assignment, called DMS-R. The CC also includes elements developed by Russian experts and organizations. A general architecture of the computer system and the characteristics of primary elements of this system are described. The system was integrated at RSC Energia with the participation of American and European specialists. The report contains information on software simulators, verification and de-bugging facilities witch were been developed for both stand-alone and integrated tests and verification. This CC serves as the basis for the Russian Segment Onboard Control Complex on ISS.

Branets, V.↗

Preliminary Aeroacoustic Measurements from the AART in the NFAC 40-by 80-Foot Wind Tunnel

The primary objective: determine the aerodynamics and acoustics related to an auxiliary propulsor mounted behind an isolated wing in the National Full Scale Aerodynamic Complex 40-by 80-Foot Wind Tunnel. The primary data points match test conditions for in-flow stereo PIV measurements completed in the Ames 7x10 in 2018. The propeller consists of a Sensenich L26H commercial off the shelf blade set and hub, with a 26 inch diameter; propeller performance is measured with an internal balance integrated in the test stand. The wing is a NACA 0015 with a 12 inch chord; 58.5 inches in height for full wing configuration; 40.5 inches in height for the half wing configuration.

Aeroacoustics↗

Operando X-Ray Diffraction During High Temperature Electrolysis

This work presents the design, development, and deployment of an operando X-ray diffraction (XRD) system for high-temperature electrolysis (HTE), enabling real-time characterization of solid oxide electrolysis cells (SOECs) under true operational conditions. The integration of an HTE test stand within a synchrotron radiation environment, mimicking the conditions of a laboratory setup, aims to enhance our understanding of the degradation processes affecting the performance and longevity of SOECs. Utilizing a custom furnace and a high precision motor stack assembly at the Stanford Synchrotron Radiation Lightsource (SSRL), the system revealed unparalleled insights into the structural evolution of SOEC components through various operational stages, including initial heat ramp, cell reduction, fuel ramp, and wet electrolysis. Initial results demonstrate the significant impact of the initial heating and cooling on secondary phase formation within the SOEC, highlighting the utility of operando XRD for developing more efficient and durable hydrogen production technologies.

08 HYDROGEN↗

Engineering America's Future in Space: Systems Engineering Innovations for Sustainable Exploration

The National Aeronautics and Space Administration (NASA) delivers space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides U.S. capability for both crew and cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010, as outlined in the 2006 NASA Strategic Plan. I In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I Crew Launch Vehicle/Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle/Altair Lunar Lander. The goals for this new system include increased safety and reliability, coupled with lower operations costs that promote sustainable space exploration over a multi-decade schedule. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level test activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity against predictions made by modern modeling and simulation analysis. It also will give information about the work in progress for the Ares I-X developmental test flight planned in 2009 to provide key data before the Ares I Critical Design Review. Activities such as these will help prove and refine mission concepts of operation, while supporting the spectrum of design and development tasks being performed by Marshall's Engineering Directorate, ranging from launch vehicles and lunar rovers to scientific spacecraft and associated experiments. Ultimately, the work performed will lead to the fielding of a robust space transportation solution that will carry international explorers and essential payloads for sustainable scientific discovery beyond planet Earth.

Dumbacher, Daniel L.↗

Radio Frequency Properties of a 3D Printed Klystron Circuit

The manufacturing of active RF devices like klystrons is dominated by expensive and time-consuming cycles of machining and brazing. In this article, we characterize the RF properties of X-band klystron cavities and an integrated circuit manufactured with a novel additive manufacturing process. Parts are 3D printed in 316 L stainless steel with direct metal laser sintering, electroplated in copper, and brazed in one simple braze cycle. Stand-alone test cavities and integrated circuit cavities were measured throughout the manufacturing process. The un-tuned cavity frequency varies by less than 5% of the intended frequency, and Q factors reach above 1200. A tuning study was performed, and unoptimized tuning pins achieved a tuning range of 138 MHz without compromising Q. Klystron system performance was simulated with as-built cavity parameters and realistic tuning. Together, these results show promise that this process can be used to cheaply and quickly manufacture a new generation of highly integrated high power vacuum devices.

3D printing↗

Superconducting Magnet Qualification Methodology for the Material Plasma Exposure Experiment

The Material Plasma Exposure eXperiment (MPEX), currently under design, is a new linear plasma device to advance the understanding of plasma-material interactions through the generation and delivery of plasmas as they are expected in future fusion reactor divertors. MPEX will be a steady-state device to study high-fluence exposures of plasma-facing materials and components. The requirements for the magnetic field at the target and the heating stages make the application of superconducting coils necessary. Conceptual designs for the superconducting magnets have been developed, and multiple cryostats with warm bore diameters of either 65 cm or 156 cm are envisioned to facilitate their integrated and timely assembly with other systems such as vacuum, water cooling, and RF power. Although design, fabrication, and testing for the magnets as stand-alone units are straightforward, challenges will arise during the integration of the system. Two different field profiles will be used during operation. The magnetic field where the electron cyclotron heating occurs needs to operate at both 1.25 and 2.5 T. It is critical that the magnets all share the same magnetic axis and alignment. The mutual inductance between cryostats will affect the quench behavior of the system. Also, cryostat-to-cryostat forces can be as large as 700 kN, and the magnitude and direction will change depending on which coils are energized. The design of the system must take those characteristics into account along with the quench scenarios. This paper describes the qualification approach that will be used to determine whether stand-alone tests can be used to ensure the success of the integrated system. Fiducials will be used to define the location of the magnetic axis for each cryostat to ensure proper alignment. Quench tests of a single magnet will be performed at a current above the normal operating current to account for additional stored energy from the mutual inductance to adjacent cryostats. Also, a 1018 steel plate will be mounted on either end of a cryostat to simulate the cryostat-to-cryostat forces. Requirements for the size and location of the steel plates are described.

Burkhardt, Earle↗

Alternative Approach to Vehicle Element Processing

The National Space Transportation Policy (NSTP), describes the challenge facing today's aerospace industry. 'Assuring reliable and affordable access to space through U.S. space transportation capabilities is a fundamental goal of the U.S. space program'. Experience from the Space Shuttle Program (SSP) tells us that launch and mission operations are responsible for approximately 45 % of the cost of each shuttle mission. Reducing these costs is critical to NSTP goals in the next generation launch vehicle. Based on this, an innovative alternative approach to vehicle element processing was developed with an emphasis on reduced launch costs. State-of-the-art upgrades to the launch processing system (LPS) will enhance vehicle ground operations. To carry this one step further, these upgrade could be implemented at various vehicle element manufacturing sites to ensure system compatibility between the manufacturing facility and the launch site. Design center vehicle stand alone testing will ensure system integrity resulting in minimized checkout and testing at the launch site. This paper will addresses vehicle test requirements, timelines and ground checkout procedures which enable concept implementation.

Huether, Jacob E.↗

Propelling Exploration to the Moon and Beyond

As the Constellation Program enters its fourth year, the Ares Projects have made substantial progress toward sending human explorers beyond Earth orbit. The Ares I crew launch vehicle, which will take six astronauts or cargo to the International Space Station or four astronauts to rendezvous with Ares V for missions to the Moon, is the first human-rated vehicle NASA has developed in over 30 years. Since the Exploration Systems Architecture Study in 2005, the Ares Projects have completed a successful system requirements review, system definition review, and preliminary design review for the Ares I crew launch vehicle. The Ares I elements are well into development, beginning with the Shuttle-derived, five-segment solid rocket motor that will provide first-stage propulsion. The first stage team has poured its first production simulation article motor and will be pouring and firing the first five-segment development motor in 2009. Large-scale tooling has been installed and tested to produce propellant tanks for the liquid-fuel upper stage at Marshall Space Flight Center (MSFC) in Alabama. The initial upper stage units and main propulsion test article will be manufactured and tested at MSFC before transferring to Michoud Assembly Facility in Louisiana. The upper stage engine team has completed powerpack testing using Apollo J-2 heritage hardware and begun construction of a new altitude test stand at Stennis Space Center in Mississippi. The flight and integrated testing group has designed and built hardware for the Ares I-X test flight scheduled for 2009, as well as begun refurbishing existing infrastructure to support ground testing. Additionally, a base configuration has been selected for the Ares V cargo launch vehicle, which will send the Altair lunar lander and Orion to the Moon. Today, the Ares Projects are well on the way to building America s next generation of exploration-capable launch vehicles.

Cook, Stephen A.↗

Preparation and Integration of ALHAT Precision Landing Technology for Morpheus Flight Testing

The Autonomous precision Landing and Hazard Avoidance Technology (ALHAT) project has developed a suite of prototype sensors for enabling autonomous and safe precision land- ing of robotic or crewed vehicles on solid solar bodies under varying terrain lighting condi- tions. The sensors include a Lidar-based Hazard Detection System (HDS), a multipurpose Navigation Doppler Lidar (NDL), and a long-range Laser Altimeter (LAlt). Preparation for terrestrial ight testing of ALHAT onboard the Morpheus free- ying, rocket-propelled ight test vehicle has been in progress since 2012, with ight tests over a lunar-like ter- rain eld occurring in Spring 2014. Signi cant work e orts within both the ALHAT and Morpheus projects has been required in the preparation of the sensors, vehicle, and test facilities for interfacing, integrating and verifying overall system performance to ensure readiness for ight testing. The ALHAT sensors have undergone numerous stand-alone sensor tests, simulations, and calibrations, along with integrated-system tests in special- ized gantries, trucks, helicopters and xed-wing aircraft. A lunar-like terrain environment was constructed for ALHAT system testing during Morpheus ights, and vibration and thermal testing of the ALHAT sensors was performed based on Morpheus ights prior to ALHAT integration. High- delity simulations were implemented to gain insight into integrated ALHAT sensors and Morpheus GN&C system performance, and command and telemetry interfacing and functional testing was conducted once the ALHAT sensors and electronics were integrated onto Morpheus. This paper captures some of the details and lessons learned in the planning, preparation and integration of the individual ALHAT sen- sors, the vehicle, and the test environment that led up to the joint ight tests.

Carson, John M., III↗

Series Bosch Carbon Formation Reactor Trade Study and Down-Select

Human exploration missions to Mars and other destinations beyond low Earth orbit require highly robust, reliable, and maintainable life support systems that maximize the recovery of oxygen (O2). One process in development and under consideration is the Series-Bosch System (S-Bosch). This system is a two stage reactor process that reduces carbon dioxide (CO2) with hydrogen (H2) to produce water and solid carbon. Theoretically, the Bosch process can recover 100% of the O2 from CO2 in the form of water, making it an attractive option for long duration missions. The Series Bosch system includes a reverse water gas shift (RWGS) reactor, a carbon formation reactor (CFR), a H2 extraction membrane, and a CO2extraction membrane. To further the development of oxygen recovery systems, NASA awarded Phase I contracts to several entities under the Game Changing Development Program addressing Spacecraft Oxygen Recovery (SCOR). Two of the hardware deliverables were integrated into the Carbon Dioxide Reduction Test Stand (CORTS) as carbon formation reactors and performance evaluations were executed at Marshall Space Flight Center. A trade study was performed between these two reactors along with one developed at MSFC. This paper provided the necessary information for the Advanced Exploration Systems/Life Support Systems Project (AES/LSS) managers to select a CFR for further development and discusses the process of selection.

Bosch↗

Accelerance Decoupling: Removing the Influence of the Mobile Launcher from the Space Launch System Integrated Modal Test

Main objective for launch vehicle (LV) modal testing is to quantify the LV’s modal properties in the free-free state (i.e., post pad separation). Given the size of most LVs, free-free testing is a challenge and often not feasible. A test stand, typically the launch pad itself, is utilized as the means to support the LV an Integrated Modal Test (IMT). This shifts the challenge to developing robust numerical methods for removing the influence of the launch pad from the IMT. Preferably fully test driven (method’s that operate based on measured data only). The Accelerance Decoupling (AD) approach, developed and verified by NASA and ASD, is a method with the capability to “subtract out” the influence of the test stand from the IMT using measured data only

Joel Sills↗